Search Documents

  • DFI
    Wave Equation Technique For Estimating Driven Pile Capacity

    By Luo Yang

    A one-dimensional wave equation based algorithm for estimation of shaft and toe resistance of driven piles using High Strain Testing (HST) data is presented. The pile is represented by a uniform elast

    Jan 1, 2006

  • ABM
    ENHANCED PRODUCT QUALITY & ENERGY EFFICIENCY BY MEANS OF INTEGRATED PLANT MONITORING SYSTEM

    By Detlef Ehlert

    In view of the increasing level of cost pressure on the part of plant owners, optimized plant operation with top product quality and maintenance costs is indispensable. Unscheduled shutdowns with incr

    Aug 16, 2017

  • DFI
    Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - Summary

    By Alec C. Bloem

    A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of

    Jan 1, 1991

  • ISEE
    Recent Projects - Hilton Hotel Beirut, Lebanon Shot Date: Sunday, July 14, 2002

    By Stacy Loizeaux

    The Beirut Hilton Hotel, which was built in 1975, but never occupied, was imploded on Sunday, July 14, 2002 by Controlled Demolition, Inc. (CDI) of Phoenix, Maryland and their client, Optimal Engineer

    Jan 1, 2003

  • SAIMM
    Advancing Comminution And Flotation Performance With Advanced Process Control

    Often plant performance suffers as a result of poor control. Poor control leads to low mill throughputs, poor classification and less than satisfactory concentrate grades and overall recoveries. By

    Jan 1, 2005

  • SAIMM
    A Study Of The Influence Of Copper On The Gold Electrowinning Process

    Paper written on project work carried out in partial fulfilment of B. Eng (Metallurgical Engineering) degree Electrowinning is an attractive method to recover gold from the relatively concentrated

    Jan 1, 2004

  • SAIMM
    Structure Model And Properties Of Alkali Borate Melts

    By Z. Zhang, R. G. Reddy

    Experimental and thermodynamic modelling studies on the structure of alkali borate melts and properties are discussed. A thermodynamic structure model for alkali borate melts is developed to describe

    Jan 1, 2004

  • AIME
    The Use Of Nodulized Ore In The Blast Furnace. (1d9c5e40-a295-40d6-9332-f495be17d151)

    Discussion of the paper of Robert Henry Lee, presented at the New York Meeting, October, 1913, and printed in Bulletin No. 82, October, 1913, pp. 2515 to 2522. J. E. JOHNSON, JR., New York, N. Y.:-Th

    Jan 12, 1913

  • SME
    The Minnesota Experience — A Harbinger Of The Future For U.S. Metals Mining And Minerals Education?

    By W. Hustrulid

    In the mid-to-late 1800’s the U.S. mining industry was on the threshold of nearly a century of golden times. Nearly every state had a prosperous and growing mining sector. The importance of the indust

    Jan 1, 2004

  • AUSIMM
    The Favona Low-Sulfidation Epithermal Au-Ag Deposit, Waihi, New Zealand

    By E Hollinger, J L. Mauk

    Gold-silver mineralised veins at Favona, represent a new low-sulfidation epithermal vein discovery that occurs less than 1 km southeast of the world-class Waihi deposit. The Favona vein is hosted in L

    Jan 1, 2002

  • CIM
    Radiometric Techniques in Heavy Mineral Exploration and Exploitation (a533ff83-da77-414b-aaa6-da379b7ff5f7)

    By C. Stapel, AA Groningen, R. J. De Meijer

    "In recent years the Environmental Research Group of the KVI has been developing a number of radiometric techniques that may be employed in mineral sand exploration. These techniques involve: radiomet

    Jan 1, 1994

  • SME
    Coalbed Methane Production And Utilization In China

    China’s vibrant economic growth is built on coal, the source of two thirds of the country’s electricity. Over 95 percent of China’s coal is mined underground with the average mining depth at 410 m and

    Jan 1, 2006

  • ISEE
    Improving Productivity at Farco Mining of Texas Using Emulsion/ANFO Blends

    By Nick Lewis

    Farce Mining of Texas is a surface coal mine located in Laredo, Texas. Farce mines and sells approximately 600,000 tons /year of bituminous coal. A map showing the location of Laredo is provided in F

    Jan 1, 1994

  • AUSIMM
    Physical and Chemical Recycling of Placer Gold: Implications for Exploration in Central Otago

    By D Craw

    Uplift of the antiformal ranges in Central Otago,

    Jan 1, 1992

  • NIOSH
    OFR-117(1)-77 Limits And Cost Sensitivity Of Alternate Parting Handling Methods - Volume 1

    By Thomas E. Finch

    This report is a continuation and expansion of a previous USBM grant (No. G0254004) which examined alternative methods of handling the parting between two coal seams in a surface mining operation. The

    Jan 1, 1977

  • CIM
    Cone Crusher Operaitonal Variables

    By A. J. Magerowski

    Energy consumption is a main component of operational costs for the comminution of mineral bearing ores. Reduction of energy consumption has continually been addressed by mill operators and equipment

    Jan 1, 1986

  • NIOSH
    Mining Haul Truck Cab Noise: An Evaluation Of Three Acoustical Environments

    By S. B. Bealko

    Mining haul trucks comprise the majority of the equipment used in underground limestone mining operations and are known to emit high levels of noise. A previous study conducted by the National Instit

  • ISEE
    The History and Development of Permissible Explosives for Underground Coal Mining

    By Robert B. Hopler

    The hazards which naturally prevail in underground coal mines, always severe and unpredictable due to the loosely-consolidated strata in which coal is frequently found, are increased by the commonly-o

    Jan 1, 1996

  • AUSIMM
    Simulation and Animation Model for the Millerton Coal Mine (New Zealand)

    A simulation and animation model was constructed for the Stockton Coal Mine. This mine is located in the north western area of the South Island of New Zealand. This model was used to study the optimum

    Dec 6, 2010

  • DFI
    Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? Introduction

    By Daniel L. Hanson

    This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently

    Jan 1, 1994