Search Documents

  • NIOSH
    Bleeder Systems In Underground Coal Mines

    By John E. Urosek, Dennis A. Beiter, William J. Francart

    In This Chapter [Designing bleeder systems Examining and maintaining bleeder systems Evaluating bleeder system effectiveness] INTRODUCTION Bleeder systems are that part of the mine

    Jan 6, 2006

  • AUSIMM
    Presidential Address

    In referring to two subjects of interest to the Members of this Australasian Institute of Mining Engineers, I would at the outset desire to express our gratification that to-day we are able to welcome

    Jan 1, 1901

  • AUSIMM
    Evaluation of sintering behaviour based on ore characteristics

    By T Higuchi, L Lu

    The quality of iron ore fines have been deteriorating, which has affected sinter quality and productivity adversely. New pretreatment and sintering technologies are therefore required to tackle the gr

    Jul 24, 2017

  • ISEE
    Blastcad 3D - Three Dimensional Underground Blast Design Software

    By Patrice Favreau

    In 1990 the Noranda Technology Centre commenced a project to develop an interactive three-dimensional blast design system using a commerical computer-aided drafting and design package (CADD). The obje

    Jan 1, 1992

  • AIME
    Electric Welding Of Large Storage Tanks

    By Harold Price

    ONE year ago, that is in January, 1923, there had not been constructed a single oil-storage tank of 55,000-bbl. or more capacity with a completely electric welded roof and bottom. Today, there are at

    Jan 6, 1924

  • AUSIMM
    Uranium-Molybdenum Mineralization at Ben Lomond, Hervey Range, North Queensland, Australia

    By Cocquio D. S, Bauchau C

    In the course of an integrated airborne survey in 1975, a uranium-molybdenum deposit was discovered by Minatome Australia Pty Limited in North Queensland, Australia, approximately 70 km by road west o

    Jan 1, 1980

  • NIOSH
    Simplified Hyperspectral Imaging for Improved Geologic Mapping of Mine Slopes

    By Edward L. McHugh, Louis J. Denes, Jami M. Girard

    A prototype portable hyperspectral imager that operates in the visible and near-infrared ranges of the electromagnetic spectrum was field tested at an open-pit mine. The tests were sponsored by the

  • DFI
    Displacement Dependent Stiffness And Damping Constants Of Pile Groups

    By Shamsher Prakash

    Equivalent spring constants for analysis of footings is a function of Young's modulus of pile material (Ep), shear modulus of soil (Gs), and geometry of the footing and/or piles. Shear modulus is

    Jan 1, 2002

  • NIOSH
    OFR-123(5)-78 Advancement Of Mine Ventilation Network Analysis From Art To Science - Volume V Application Of PSU/MVS To The Ventilation Planning Of A New Mine

    By R. Stefanko

    In this report, the use of Penn State Ventilation Simulator (PSU/MVS) for planning and evaluating new coal mine ventilation systems is demonstrated. The simulator's application to evaluate the ve

    Jan 1, 1977

  • AUSIMM
    Isometric Mines Plans: Their Applications, Limitations, and Method of Construction

    IN the construction of a set of ordinary mine plans, two axes or coordinates are used; also, two different projections are essential viz., a plan (horizontal projection) and longitudinal section (vert

    Jan 1, 1919

  • CIM
    Enhancement of Flow Dynamics of Existing Flotation Cells

    By Timo Niitti, Antti Rinne, Janne Turunen, Sami Grönstrand

    "This paper describes novel methods to enhance the flow dynamics of a mechanical flotation cell that can be applied to an existing installation. There are several reasons to alter the flow dynamics. T

    Jan 1, 2006

  • ISEE
    A Method to Measure Detonation Front Curvature of Emulsion Explosives

    By Nikolaos Petropoulos, Daniel Johansson, Håkan Schunnesson

    The optimization of the explosive performance is of great importance since blasting is extensively used in civil projects and mining industry. An improved understanding of how the energy from the deto

  • SAIMM
    A Simulation Model To Improve Pneumatic Intensifier Performance And Reliability

    By C. Scheffer

    This paper describes a model that can simulate the behaviour of a pneumatic intensifier that is generally referred to as an ?air pump? (AP). The AP is used in many South African underground mines, and

    Jan 1, 2005

  • NIOSH
    Evaluation Of Deep-Seated Crib Block Fire Tests

    By M. A. Trevits, J. E. Urosek, A. C. Smith, M. P. Valoski

    The National Institute for Occupational Safety and Health (NIOSH), in partnership with the Mine Safety and Health Administration (MSHA), is conducting research to test, evaluate, improve or modify coa

  • NIOSH
    Employment And Injuries In The Fuel Industries ? Introduction (7e6b1b02-9e86-43c7-a066-72dba3fafdd4)

    By Forrest T. Moyer

    INJURY experience and related employment information are presented in the chapter for the coal-mining, coking, oil and gas, peat, and native asphalt industries in the United States for 1964. No attemp

    Jan 1, 1965

  • AUSIMM
    The Effect of Sodium Chloride on Bacterial Leaching of Low-Grade Copper Ore

    By Madgwick J. C

    Leaching column techniques and microbiological methods have been described in detail in Madgwick and Ralph (1980) and Madgwick, Ralph and Sadler (1981).Sixty-nine kilograms of copper porphyry ore (0.4

    Jan 1, 1982

  • DFI
    Challenge From Foundation Engineering To China ? Synopsis

    By R. L. Xu

    In this paper, the author would like to point out with figures that the building industry is one of the key industrial sectors of the national economy in China. And in the coming 15 years, the output

    Jan 1, 2010

  • DFI
    Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And Successes

    By John E. Lens

    Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at

    Jan 1, 2011

  • CIM
    Applying a Customer-Based Approach at Vale’s Clarabelle Mill

    By A. Taylor, J. Shelegey, H. Sullivan, J. Doucet

    "Historically, performance at Vale’s Clarabelle Mill was measured by Mill throughput and Mill recovery. After the economic collapse in 2008, a series of reviews were performed to drive improvements in

    Jan 1, 2012

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013