Search Documents

  • DFI
    Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems

    By Howard A. Perko

    Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me

    Jan 1, 2008

  • SAIMM
    "Pipeline Integrity Using The External Corrosion Direct Assessment (Ecda) Methodology: A Case Study" - 1. Introduction

    By Chris Ringas

    The safe operation of gas transmission pipelines is increasingly coming under the spotlight. Increasing environmental pressure is also forcing pipeline owners and operators to ensure the integrity of

    Jan 1, 2006

  • AUSIMM
    An Innovative Process for Comprehensive Utilisation of Clay-Vanadium Ores

    An Innovative Process for Comprehensive Utilisation of Clay-Vanadium Ores By adopting conventional processing technologies such as flotation, gravity concentration, and magnetic separation, it is dif

    Sep 13, 2010

  • DFI
    Recent Evolutions In Deep Foundation Technologies

    By Maurice Bottiau

    It is a quite challenging objective to aim at covering in one paper the most recent evolution in piling and deep foundations technologies. This report has to be understood within the limits of the ses

    Jan 1, 2006

  • DFI
    Experimental And Theoritical Studies On Pile Capacity - Synopsis

    By K. Rambha Devi

    The paper is an attempt to co-relate the findings of pile capacity using a number of formula suggested by various authors with the actual field load test results. Five locations consisting of wholly s

    Jan 1, 1996

  • SME
    Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel Boxes

    By Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman

    Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro

    Jan 1, 2001

  • ISEE
    Underwater Blasting: A Summary

    By Joshua Taylor Drake

    This report answers specific questions concerning underwater blasting considerations, and blasting safety. The blasting considerations discussed consist of basic blasting principles, and new variables

    Jan 1, 2015

  • ISEE
    The Evaluation of Explosives Performance: an End Users Point of View

    By N T. Moxon, L W. Armstrong

    Explosive manufacturers have for many years provided a service to the mining industry which has,until recently, been unchallenged by mine operators. Today mine operators are more aware of the properti

    Jan 1, 1991

  • TMS
    Thermodynamic Equilibrium of Hydroxyl Complex Ions in Mn2+-H2O System

    By Yunyan Wang

    Diagrams of pc-pH for the complex ions concentration and pH value and -g- for activity coefficient and ionic strength ln±MnSOI4had been drew based on the thermodynamic principle of coordination chemis

    Jan 1, 2010

  • DFI
    1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers

    By J. Hartikainen

    19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an

    Jan 1, 1994

  • ISEE
    Field Application of Destructive Wave Interference

    By Kurt Oakes, Paul Worsey, Braden Lusk, Tony Brasier, Scott Crabtree, Randy Wheeler

    Theoretical description of destructive wave interference and the use of sacrifi cial holes is included and is supported by data collected at Springfi eld Underground. Finally, the process by which the

    Jan 1, 2008

  • CIM
    The end of horizontal zinc retorting in the United States

    By J. E. Dutrizac

    "The end of an era in zinc metallurgy took place on July 31, 1976 when the horizontal retort furnaces of the National Zinc Company in Bartlesville, Oklahoma were permanently shut down (1) . For more t

    Jan 1, 1999

  • CIM
    Radium (42e2deaa-4b56-4916-8f71-f6bc2fdee319)

    By G. W. Adams

    Foreword While the literature on radium is voluminous, there is no single publication available from Canadian sources which attempts to cover at all fully the world radium industry. The comparatively

    Jan 1, 1931

  • SME
    Critical Considerations in Robotic Seabed Drilling

    By Steve Stuart

    Deep-sea mineral SMS deposits present some of the world’s most challenging conditions for drilling equipment. As robotic seabed drilling services mature so too the ways that clients engage with servic

    Sep 1, 2014

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • SME
    Liberation-Limited Grade/Recovery Curves From X-Ray Micro Ct Analysis Of Feed Material For The Evaluation Of Separation Efficiency - Preprint 09-025

    By J. D. Miller

    Characterization of feed material with respect to expected concentrate grade and recovery is fundamental to the design of improved separation efficiencies and to achieve sustainable development in the

    Jan 1, 2009

  • AUSIMM
    Using Ground Penetrating Radar to Enhance the Exploration-to-mining Value Chain

    By D Smith, A Ramdhani, J Francke

    Ground penetrating radar (GPR), a well-established geophysical technique generally used for shallow civil engineering applications, has, in the last decade, found increasing acceptance as a complement

    Aug 18, 2014

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • SME-ICGCM
    Pillar Design Considering the Plastic Behavior of the Coal Seam

    By Andre Zingano

    The variation in pillar behavior at underground coal mines working in the Bonito coal seam is observed in both research and mining company case studies. There is no consistency in pillar behavior, as

    Jan 1, 2012