Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Learning Our Geotechnical Limits and Pushing Our Longwalls Through Them

    By Richard N. Campbell

    The world?s ever-expanding demand for energy and coking coals has resulted in the underground mining industry looking at taking on increasingly marginal and geotechnically challenging deposits. The dr

    Jan 1, 2014

  • SME-ICGCM
    New Approach to Evaluate the Stability of Yield Pillars

    By Khaled Morsy

    In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica

    Jan 1, 2003

  • SME-ICGCM
    A Comparison between Empirical and Numerical Methods in Underground Galleries Support System Design

    By Saeed Zandi, Kazem Oraee

    "Tunnels and galleries are the most important structures in coal mines. They are used for variety of purposes, such as transporting ore and people and for ventilation. A well-designed support system i

    Jan 1, 2016

  • SME-ICGCM
    Design, Construction And Performance Of A Single Pass Lining For Soft Ground Coal Mine Tunnel Entries

    By Donald P. Richards

    West Elk Coal Company operates its Mt. Gunnison No. I mine on the western slope of the Rocky Mountains in Western Colorado. The mine is located along the north fork of the Gunnisson River near Somerse

    Jan 1, 1984

  • SME-ICGCM
    Designing Shotcrete As Primary Support in Tunnels

    By Behdeen Oraee-Mirzamani

    Since the advent of New Austrian Tunneling Method (NATM), shotcrete as a primary means of support in tunnels has been widely applied. It?s most important features are durability, speed of application

    Jan 1, 2011

  • SME-ICGCM
    International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall Panels

    By J. D. Cole

    In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C

    Jan 1, 1990

  • SME-ICGCM
    Considerations Of Gas Outbursts In Using Dome Salt Mines For Storage Of Oil And Nuclear Waste

    By M. Ashraf Mahtab

    A feature of interest in stability of excavations in domal salt is the phenomenon of gas outbursts which has occurred in five of the six mines in Louisiana salt domes. Gas outbursts are sudden errupti

    Jan 1, 1981

  • SME-ICGCM
    Application Of Polyurethane Injection For Rehabilitation Of The Maingate Of A Deep Single Entry Longwall Mine

    By Kevin MacPherson

    After 34km of roof bolted drivage the first fall of ground occurred at the Phalen Colliery in the maingate of the 8th East longwall panel. The fall occurred over the stage loader as the wall approache

    Jan 1, 1999

  • SME-ICGCM
    Determination Of Limitation Of Roof Layer Separation (LRLS) In Entry Roof

    By Wenjun Ju

    It's very important to determine the limitation of bed separation in entry roof in order to predict roofs stability and take some necessary precautions. Based on numerical modeling and monitoring

    Jan 1, 2001

  • SME-ICGCM
    The Mechanical Property Of Coal Containing Gas (d5aeba01-a0db-4f86-a21e-adbcc6290eab)

    By Yao Yuping

    The strength and deformation of more than two hundred coal samples have been tested in the condition of triaxial compression. The regression equation showing the relationship between coal strength and

    Jan 1, 1992

  • SME-ICGCM
    Evaluation Of Existing Predictive Methods For Mine Subsidence In The U. S. (1ec2d374-5864-4775-9b19-24759c4f95be)

    By Vladimir Adamek

    Two existing predictive methods were chosen for evaluation; an influence function (Gals Theory) and a profile function (hyperbolic). These were applied to several field measured subsidence pro¬files o

    Jan 1, 1981

  • SME-ICGCM
    Modeling the Effect of Bolts on the Behavior of Rock Pillars and Associated Insights on Rib Reinforcement

    By Gabriel Walton, Sankhaneel Sinha

    "Rib failures are a major hazard in underground mining. When pillars are subjected to loading, extensile cracks are generated parallel to the excavation boundary, which can manifest as rib falls. A co

    Jan 1, 2017

  • SME-ICGCM
    The Directional Drill Monitor For Long Hole Gas Drainage In Coal Mines (d6b87c76-5ad8-4cc5-b4ae-23b79c52c32b)

    By G. Skybey

    The Directional Drill Monitor (DDM) is an advanced instrument for real time in hole surveying. It was developed by Du Pont (Australia) to suit Australian gassy coal mining conditions. The instrumen

    Jan 1, 1992

  • SME-ICGCM
    Instrumentation and Monitoring For Pillar Extraction in a Deep, Faulted Uranium Mine (3da9a7b4-75c4-492e-843f-6defa6026a38)

    By Thomas R. Scotese

    A rock mechanics instrumentation and monitoring program was implemented during pillar extraction at Gulf Mineral Resources' Mt. Taylor Mine, the deepest uranium mine in the U.S. Three types of mo

    Jan 1, 1984

  • SME-ICGCM
    Mechanism and Prevention Measure of Rib Spalling in 6.5 Meter High Caving Face in Thick Coal Seam with Undulated Floor

    By Weidong Pan, Yinchao Yang, Baodong Zuo

    Fully mechanized mining technology, with a large cutting height in thick coal seam, has been developed to be large-scale, mechanized, and intelligent. Furthermore, it is also superior to other mining

    Jan 1, 2017

  • SME-ICGCM
    Development And Demonstration Of An Alternate Mining Geometry For Improved Ground Control In An Illinois Coal Mine

    By Y. P. Chugh

    About 60-70% of the underground mined coal in Illinois is extracted using a room-and-pillar mining method that permits extraction of about 50% of the coal. The remaining coal is left behind in the for

    Jan 1, 2004

  • SME-ICGCM
    Case Study of Roof Behaviour and Conditions for Longwall Face Recoveries at Beltana No. 1 Mine, Australia

    By David Hill

    Over the last decade, Beltana No.1 Mine has generally been Australia?s most productive longwall operation, with a ROM output of 7.2 Mt in YEJ2007. Characteristically favorable roof conditions and low

    Jan 1, 2011

  • SME-ICGCM
    Ground Control Design Considerations for Reducing Longwall?Induced Stress and Seismicity Associated with Massive Sandstone under Deep Cover

    By Daniel W. H. Su

    Thick, massive sandstone present in close proximity of the mining horizon can create difficult longwall caving issues, which may lead to severe face loading and subsequent face roof control problems.

    Jan 1, 2014

  • SME-ICGCM
    Hydrogeologic Effects Of Subsidence At A Longwall Mine In The Pittsburgh Coal Seam

    By Leslie Carver

    The effects of longwall mine subsidence on water resources were studied at a West Virginia coal mine (mine Z) by Carver (1994). Data were obtained for 137 domestic supply wells and springs and 12 base

    Jan 1, 1994

  • SME-ICGCM
    The Use of the Area of Main Influence to Fix a Relevant Boundary for Mining Damages in Germany

    By Denise Mueller, Axel Preusse

    "In 2010, the fracking discussion in Germany caused a number of changes in German law, which came into force in 2016. Especially the production of gas had to be regulated. With the legislation amendme

    Jan 1, 2017