Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Application Of DDM To Some Rock Pressure Problems In Japanese Deep Coal MinesBy Yoshiaki Fujii
Displacement Discontinuity Method (DDM), which was originally developed by Crouch,S.L., is a powerful tool to calculate mechanical disturbances due to tabular excavations. Three topics on DDM applicat
Jan 1, 1992
-
Rock Reinforcement LongevityBy Francis S. Kendorski
Rock reinforcement has been in widespread use and generally has been accepted in underground mining and tunneling since the 1950s. The first rock reinforcement technologies employed were mechanical an
Jan 1, 2000
-
Numerical Modeling the Interburden Impact on Multiple-Seam Coal Mining in Western ChinaBy Jimin Su, Enguang Zhu, Kangning Zhang, Yang Li
"The effect of interburden on overlying strata movement during the mining of a lower group coal seam is still a challenge in China. Based on the multiple coal seams in western China, numerical simulat
Jan 1, 2017
-
Investigation of Electromagnetic Emissions in a Deep Underground Mine (0366ea57-3ba7-4a00-bec7-825a048e7e26)By Douglas Scott
Highly stressed rock in stopes continues to be a primary safety risk for miners in underground mines because it can result in failures of ground that lead to both injuries and death. Spokane Research
Jan 1, 2004
-
Load Deformation Behavior Of Simulated Longwall Gob MaterialBy Deno M. Pappas
The purpose of this U.S. Bureau of Mines study was to determine the material stiffness properties of the gob for use in numerical models of rock mass response to longwall mining. Photographs of actual
Jan 1, 1993
-
Imaging Ahead Of Mining With Radio Imaging Method (RIM-IV) Instrumentation And Three-Dimensional Tomography SoftwareBy Larry Stolarczyk
A clear vision of the future coal mining industry was developed into a hierarchy of technology needs by the National Mining Association (NMA) and the Chief Executive Officers of the mining industry. A
Jan 1, 2003
-
Assessment Of Underground Structural DesignBy Eugene D. Krupa
Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is
Jan 1, 1990
-
Improving Roof Control At A South African Coal MineBy Alan Bugden
Goedehoop Colliery produces 8 million tonnes of coal a year, principally from room and pillar mining, and is situated in the Witbank Coalfield in the Republic of South Africa. The mine has a long and
Jan 1, 2001
-
Frictional Properties of Rock Applied to Mining ExcavationsResults of direct shear tests on rock discontinuities and triaxial compression tests on intact rocks are presented and - discussed. The main parameters considered area stress functions, angle of in
Jan 1, 1987
-
Field Measurements of Chain Pillar Response to Longwall Abutment LoadsBy Christopher Mark
Current longwall pillar design methods are based on many assumptions about pillar and entry response to longwall abutment loads. Knowledge of the magnitude and time-of-arrival of abutment loads is ess
Jan 1, 1986
-
Engineering Geophysics - Mine Subsidence Risk Assessment StudyBy Kanaan Hanna
Abandoned mines pose a serious threat to public health and safety, as well as the environment. When active workings approach old mine workings, miners could encounter significant hazards. Additionally
Jan 1, 2011
-
Mechanical Properties of Pizza Pans and Their Effectiveness in Underground Coal MiningBy Brian Daniels, James Farroni
"Draw rock (small rock that forms/falls when bolting the roof and/or rib) is the cause of numerous injuries annually. These injuries result in lost work hours and low morale. The report below explains
Jan 1, 2010
-
Tekcrete Fast®: Fiber-Reinforced, Rapid-Setting Sprayed Concrete for Rib and Surface ControlBy Stephen C. Tadolini, Minova USA Inc., Peter S. Mills, David R. Burkhard
"Fiber-reinforced spayed concrete has been used for several years in civil and tunneling operations. Research conducted to reduce cure times and increase compressive and flexural strengths resulted in
Jan 1, 2017
-
Analyses of De-Confinement Mechanisms of Unstable Failures in Underground Mining ConditionsBy Ruixiang Gu
The de-confinement mechanisms of unstable failures as they occur in deep coal mining conditions are investigated using a distinct element numerical modeling code. The Mohr-Coulomb and continuously yie
Jan 1, 2014
-
The Impact Factors of Overburden Movement in Longwall Mining of Shallow Coal SeamsBy Yang Li
For the study of overburden movement in longwall mining of shallow coal seams, most scholars merely consider the thickness of bedrock and top soils. In this paper, the overburden movement in longwall
Jan 1, 2014
-
Review Of Pillar Design Equations Including The Effects Of ConstraintBy C. Babcock
This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships
Jan 1, 1981
-
Numerical Model Simulation of a Development Pillar at a Steeply Dipping Underground Limestone MineBy Morgan M. Sears, Gamal Rashed, Jim Winfield, Brent Slaker
"Over the past decade, ground falls have resulted in five fatalities, representing over 40% of all fatalities occurring in underground stone mines in the United States. In conjunction with recent high
Jan 1, 2018
-
Research on the Geological Dynamic Conditions and Forecast for Rock BurstsBy Weihua Song, Hongwei Zhang, Feng Zhu, Sheng Li, Guoshui Tang
"Rock burst is one of the most serious dynamic disasters in coal mining. Rock burst prevention involves two difficult tasks: systematically evaluating the occurrence conditions and effectively forecas
Jan 1, 2015
-
Stability Analysis of Shell Structure Around the Longwall Mining Face Area in Steeply Dipping SeamBy Yongping Wu
Taking the longwall mining face area in a steeply dipping seam as the research object, the stability of an asymmetrical rock mass structure is analyzed using shell theory and masonry beam theory. The
Jan 1, 2013
-
Mitigation of a Massive Sandstone Channel's Impact on a 1,500 Ft Wide Longwall FaceBy Daniel W. Su
This paper presents the implementation and evaluation of the hydraulic fracturing technique and Longwall Visual Analysis (LVA) software to mitigate the impact of a 1,000-ft (305-meter) widemassive san
Jan 1, 2012