Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Coal Pillar Design in Tabas Central Mine of Iran

    By Mostafa Sharifzadeh, Ebrahim Ghasemi, Kourosh Shahriar

    "The Tabas Central Mine (TCM) is one of the underground coal mines located in the Tabas coal region, in the mid-eastern part of Iran. This mine is the first mechanized coal mine in Iran that uses the

    Jan 1, 2010

  • SME-ICGCM
    Instrumentation of a Roof Bolter Machine for Void Detection and Rock Characterization

    By Soheil Bahrampour

    Void detection and identification of bed separation while drilling holes in rocks for roof bolting can be a great source of information for the evaluation of ground conditions and adjustment of ground

    Jan 1, 2013

  • SME-ICGCM
    Risk Analysis and Risk Ranking in Tunneling: A Case Study

    By Behdeen Oraee

    Constructing tunnels underground is generally described as a high-risk activity because conditions in the surrounding area tend to be unpredictable. This would and can create unique dangers in every s

    Jan 1, 2014

  • SME-ICGCM
    Case Studies of Innovative Cable Bolt Technology

    By Ben Mirabile

    Over the past three decades, the U.S. coal mining industry has widely used cable supports to supplement traditional primary bolting systems, especially in difficult ground conditions. However, increas

    Jan 1, 2013

  • SME-ICGCM
    Development and Application of the TT Anti?Friction Washer for Use with Tensioned Roof Bolt Systems

    By Thomas A. Cook

    The effectiveness of tensioned roof bolt systems has been well researched and documented over the years (Stankus, 1990, 1991, 1997; Guo, 1997; Denton, 2000; Su, 2007). Higher and more consistent inst

    Jan 1, 2014

  • SME-ICGCM
    Influence of Mine Layout, Mining Method, and Geology on Down?Dip Coal Barrier Performance at the Solar No. 7 Mine

    By Anthony T. Iannacchione

    The Solar No. 7 and Solar No. 10 mines were designed to prevent mine waters from directly discharging to the surface. In January of 2004, a discharge occurred as the Solar No. 7 mine was in its final

    Jan 1, 2013

  • SME-ICGCM
    Application of Laser Scanning for Rock Mass Characterization and Discrete Fracture Network Generation in an Underground Limestone Mine

    By Juan J. Monsalve, Nino Ripepi, Richard Bishop, Jon Baggett

    "Terrestrial laser scanning (TLS) is a useful technology for rock mass characterization. A laser scanner produces a massive point cloud of a scanned area, such as an exposed rock surface in an undergr

    Jan 1, 2018

  • SME-ICGCM
    Screw Anchors for Ground Control

    By Frank Schmidt

    Due to changing geology, rib bolting is an ever-changing problem in ground control. With the economic status of the coal market, the need for safely increasing productivity in rib bolting is at an all

    Jan 1, 2013

  • SME-ICGCM
    Stability of a Gateroad Used Simultaneously for Two Retreating Longwall Faces

    By Stanislaw Prusek

    In this paper, results of underground measurements conducted in gateroad 3, seam 615, at the Bobrek-Centrum Colliery are presented. The Bobrek-Centrum Colliery is owned by Kompania Weglowa, the larges

    Jan 1, 2014

  • SME-ICGCM
    Study of the Backfill Confined Consolidation Law and Creep Constitutive Model under High Stress

    By Zhikai Wang, Wensheng Lyu, Peng Yang

    "To better understand the mechanical behavior of the compression deformation of backfill under high stresses corresponding to large depths, consolidation compression tests were performed for cemented

    Jan 1, 2017

  • SME-ICGCM
    Design Optimization of Longwall Chain Pillars

    By Behdeen Oraee, Amirhossein Bangian, Kazem Oraee

    "Determination of the optimum design of chain pillars has a significant effect on the economics and safety of longwall operations. Most pillar design formulae are based on empirical methods and supple

    Jan 1, 2010

  • SME-ICGCM
    Mine Water Vs. Drinking Water?Technical Execution and Legal Relationship in Germany

    By Tobias U. Papst

    The German Ruhrgebiet is slowly transitioning into a post-mining state. It has been subjected to industrial-grade hard coal mining operations for more than 150 years. Due to a political decision, Germ

    Jan 1, 2014

  • SME-ICGCM
    Ground Control Aspects of a Successful Underground Coal Mine Trial in Weak Strata in Indonesia

    By Andrew Lewis, Amarit Nitaramorn, Alexander Garcia, Peter Altounyan

    "Indonesia is a major coal producer, the vast majority being sourced from opencast operations. Underground production to date has been constrained by unfavorable ground conditions and limited local ex

    Jan 1, 2010

  • SME-ICGCM
    The Limitations and Potential Design Risks When Applying Empirically Derived Coal Pillar Strength Equations to Real-Life Mine Stability Problems

    By Guy Reed, Russell Frith

    "The method of determining coal pillar strength equations from databases of stable and failed case histories is more than 50 years old and has been applied in different countries by different research

    Jan 1, 2018

  • SME-ICGCM
    Roof Movement and Loading for Top-Coal Caving Longwall Mining in Extremely Inclined Thick Coal

    By Shengliyang Yang, Jinghu Yang, Jiachen Wang, Xiaomeng Li

    "Safe and efficient mining of extremely inclined thick coal seams less than 20m thick is one of the new challenges in China coal industry. In recent years, the extremely inclined thick coal seams have

    Jan 1, 2016

  • SME-ICGCM
    Evaluation of Drill Hole Geometry on Bolted Roof Beam Performance

    By David R. Burkhard

    "Comparative roof beam performance, as measured by delamination within the bolted horizon, was used to evaluate two types of roof bolt drill hole geometries in a development setting. Short encapsulati

    Jan 1, 2016

  • SME-ICGCM
    Trial of Small Gateroad Pillar in Top Coal Caving Longwall Mining of Large Mining Height

    By Kun Li, Shuaishua Yue, Huigui Li, Yuan Ruifu, Yongxiang Xu, Huamin Li

    "Coal seams in Tashan Mine of Datong Coal Group in China average 49.2 ft (15m) thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 12.5 ft

    Jan 1, 2015

  • SME-ICGCM
    Case Study of the Barro Branco Coal Mine Pillar Burst

    By Fernando O. L. Xavier

    "The Barro Branco coal mine was located in the southern region of Brazil, in the state of Santa Catarina. In 2002, an incident occurred at the mine, leading to a violent, massive pillar failure, resul

    Jan 1, 2017

  • SME-ICGCM
    Shear Testing of 28 mm Hollow Strand "TG" Cable Bolt

    By Naj Aziz, Peter Craig

    "Double shearing tests were carried out on the 28 mm (1 in) hollow strand Jennmar TG cable bolt to gain a better understanding of the shearing behavior of the cable. The first test was limited to a 50

    Jan 1, 2010

  • SME-ICGCM
    The Effect Of Hazardous Geologic Structures On Gateroad Stability

    By Frank E. Chase

    Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g

    Jan 1, 1990