Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Rock Load Estimation For Tunnels In Squeezing Ground Conditions

    By Bhawani Singh, A. K. Dube, B. Singh

    At least three hydroelectric tunnels constructed during the last decade through the lower Himalayan region in India have met with serious problems of supporting in squeezing ground conditions. Steel r

    Jan 1, 1981

  • SME
    Single-Shell Tunnel Lining with Reinforced Concrete Rings: Critical Loads and Damage Prevention

    By Fritz Grübl

    Modern shield TBMs allow tunnel drives through almost any type of ground. Thanks to high elaborated technical measures, significant subsidence of the ground surface can be almost entirely avoided.

    Jan 1, 2001

  • SME
    Effects of Early Strength Agent on Macro-Mechanical Properties and Microstructure of Gangue-Cemented Paste Backfill

    Gangue-cemented paste backfill (GCPB), is a well-established green mining technology and significantly improves the recovery rate of mineral resources, prevents mine dynamic disasters, reduces surface

    Jan 7, 2020

  • SME
    Medium-Temperature Pressure Leaching Of Copper Concentrates - Part II: Development Of Direct Electrowinning And An Acid-Autogenous Process

    By J. O. Marsden

    Part I in this series of papers considered the chemistry of medium-temperature pressure leaching of copper sulfide concentrates and reviewed the metallurgical testing and initial process development f

    Jan 1, 2007

  • SME
    The application of nitrogen to control a spontaneous combustion event during a longwall face salvage

    By Leeming. J. R.

    In the UK, powered supports are normally salvaged from longwall faces on completion of production, for reuse on the next unit. Where a spare set of supports are held, the salvaged supports are often s

    Jan 1, 2009

  • SME
    Availability Of Coal For Efficient, Low-Cost Underground Mining In Illinois – Preprint 97-162

    By C. Treworgy, C. Chenoworth

    Geologic and technical factors such as coal seam thickness, stripping ratios, roof conditions, partings, faults, and size and geometry of the reserve block greatly impact the availability of Illinois

    Feb 24, 1997

  • SME
    Water-Jet-Assisted Roadheaders

    By Bradley V. Johnson, Robert J. Timko, Edward D. Thimons

    Water-jet-assisted cutting involves the use of a mechanical cutting bit in combination with a high-pressure water jet directed just in front of the bit tip. Such a jet can offer benefits in terms of i

    Jan 1, 1987

  • SME
    Exploration: Both a Boom and Bust Year - 1980 Annual Review

    By Paul Russell, M. M. Kimberley, Erick F. Welland, Louis Cope, C. C. Mosher, William M. Shepard, William C. Larson, Graham Closs

    Exploration activities in 1980 felt the effects of unstable economic conditions and oscillating metal prices. In the cyclical, boom-or-bust precious metals and uranium markets, precious metals activit

    Jan 5, 1981

  • SME
    Technology News - More P&H Shovels Operate in Canadian Oil Sands

    P&H MinePro Services Canada is supplying Syncrude Canada three more of its model4100BOSS electric mining shovels. The shovels will be delivered during 2003. Syncrude’s oil sands operations already u

    Jan 1, 2003

  • SME
    Practical Tunnel Lining Design Methodology and Guidelines—A Series of Tunnel Design Papers

    By Bradford F. Townsend, Colin R. Speers

    INTRODUCTION This is the first in a series of papers addressing practical tunnel lining design. The format for this and future papers is to present a particular topic and support the presentation o

    Jan 1, 2005

  • SME
    Leaching Of Sarcheshmeh Copper Oxide Ore In Sulfuric Acid Solution

    By H. Razavizadeh

    The recovery of copper from oxide ores containing from 2% to 4.1% acid-soluble copper from the Sarcheshmeh mine in Kerman province of Iran was investigated by agitation leaching in sulfuric acid media

    Jan 1, 2008

  • SME
    Constructing the Airside Road Tunnel, Heathrow Airport

    By John Corcoran

    INTRODUCTION Content of this Report The 1300m long twin-bore 8.1m diameter Airside Road Tunnels (ART) were excavated beneath the busy taxiways and stands of Heathrow Airport between 2002and 20

    Jan 1, 2005

  • SME
    Safety Framework for Programmable Electronics in Mining (a95116c1-d58d-432f-ad32-8ea419ca1fb8)

    By John J. Sammarco

    Mining has one of the highest annual average fatality rates among major US industries. Health and safety dangers have been inherent to mining since the early days of picks and shovels. Even though mi

    Jan 1, 1999

  • SME
    “Shake And Slip To Survive” - Tunnel Design

    By Drupad B. Desai, Bruce Chang, Jay L. Merritt

    This paper reviews difficult ground conditions encountered along the alignment of large-diameter sewage tunnels for the City of Los Angeles. It offers a detailed one-of-a-kind solution to a unique pro

    Jan 1, 1989

  • SME
    High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case History

    By Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta

    Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang

    Jan 1, 2005

  • SME
    Rochester Mine Reaches 100 Million Ounces of Silver Production

    The Coeur Rochester Mine is one of the largest and lowest cost primary silver mines in the United States. In January, the mine surpassed 3.1 kt (100 million oz) of historic silver production. Rochest

    Jan 1, 2004

  • SME
    Non-Invasive Exploration In An Environmentally Sensitive World

    By K. E. Livo, D. H. Knepper

    Modern remote sensing provides a means for locating and characterizing exposed mineralized systems in many parts of the world. These capabilities are non-invasive and help target specific areas for mo

    Jan 1, 2004

  • SME
    Parbati Hydroelectric Project Stage II, India—Two Inclined Pressure Shafts with a Honeycomb Segmental Lining Driven by a 5m Hard Rock Double Shield TBM

    By Wolfgang Gütter

    India is targeting to boost its electrical capacity from 100 GW to 200 GW within the next 10 years. The National Hydroelectric Power Corporation (NHPC) has decided in2001 to take execution of the 800

    Jan 1, 2005

  • SME
    A Dynamic Systems Modeling Approach To Evaluating Backfill Designs

    By M. Wickham

    Design of an open pit backfill requires an understanding of highly varied processes including slope stability, hydrogeology, pit lake chemistry, climate, runoff, and mine waste behavior. Dynamic syst

    Jan 1, 2001

  • SME
    Record Performance Of TBM In The 13.5 Km Amlach Tunnel, Austria

    By Hans Janzon, Ernst Buechi

    INTRODUCTION The headrace tunnel in Amlach is part of a hydro electric power scheme near the city of Lienz in south west Austria. The project is owned and developed by Tiroler Wasserkraftwerke AG,

    Jan 1, 1987