Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Molybdenum Supply ForecastingBy Rex E. Loesby
The dramatic increase in molybdenum prices from the low of less than $2.50/lb in 1999 to more than $40/lb in 2005 has caught the attention of molybdenum mine owners and exploration project developers.
Jan 1, 2007
-
Geographic Information Systems And Industrial MineralsBy M. J. Price
The usage of Geographic Information Systems (GIS) is increasing rapidly throughout the Mining Industry, especially in the Industrial Minerals sector. GIS provides an efficient and robust link between
Jan 1, 2001
-
Developing A New Process Design For The Southwestern Oregon Industrial Mineral Bearing Placer System Via Practical Study Of The Unique Deposition, Mineralogy, And Dry Tailing Requirements - Introduction - Preprint 09-038By J. Drew
Oregon Resources Corporation (ORC), an industrial minerals mining company, is currently engaged in the development of a new process design that will allow the unique paleo-beach placer deposits of sou
Jan 1, 2009
-
Application Of Propeller Fans At Wisconsin Industrial SandBy Albert Adu-Acheampong
Fairmount Mineral's Maiden Rock underground sand mine historically delivered air to ventilate diesel-powered equipment at its working faces through high-resistance, 381-mm- (15-in.-) diameter PVC
Jan 1, 2008
-
Optimal Strategies For Leach Pad Injection OperationsBy J. Winterton
Cripple Creek and Victor Gold Mining Co. is developing a full-scale pad injection program as part of the overall operational plan for the Valley Leach Facility. As part of the development process the
Feb 27, 2013
-
Effect Of Microwave Treatment On The Flotation And Magnetic Separation Properties Of Pyrite, Chalcopyrite, Galena And SphaleriteBy N. M. Can
The effects of microwave treatment on the floatabilities and magnetic susceptibilities of some sulfide minerals, namely, pyrite, chalcopyrite, galena and sphalerite, were studied. Pure mineral samples
Jan 1, 2007
-
Probable Cost Estimating and Risk ManagementBy John Reilly
Costs of complex/underground projects have been consistently underestimated and delivery on time and on budget has been problematic. This has been attributed, to inadequate cost estimates and unidenti
Jan 1, 2008
-
Subsea Massive Sulphide Mining - Technology Test ProgramBy J. Hunter, E. Jackson
This paper describes work done by Placer Dome Technical Services Limited, a subsidiary of Barrick Gold, and Nautilus Minerals Inc. in support of the conceptual design of a subsea mining system. It d
Jan 1, 2007
-
Development Of A High Blow Energy Hydraulic ImpactorBy Wm. Ross Wayment, Innes P. Grantmyre
INTRODUCTION It has been recognized for some time that major changes in mining methods will be required in the near future. Two types of factors contribute to this need for change. Intrinsic factor
Jan 1, 1976
-
The Atlanta West Area CSO Storage Tunnel and Pumping Station Project—15 Months of Design Accomplished Within 10 MonthsBy Refik Elibay, Lawrence A. Williamson, George D. Barnes
Under an extremely aggressive schedule, final design of 13.5 km (8.4 miles) miles of 8.2 m (27 ft) diameter deep rock tunnel, 322 ML/day (85 million gallons / day)submersible pumping station and assoc
Jan 1, 2005
-
Handling Infiltration Into Underground StructuresBy Edward D. Graf
Once the heavy work of mining, supporting and completing an underground structure is finished, there is frequently the problem of handling unwanted water infiltration into the opening. Methods of cont
Jan 1, 1987
-
Geology Of The Storm Gold Deposit, Northern Carlin Trend, NevadaBy R. Hipsley, D. Arbonies, P. J. Dobak, M. Visher
The Storm deposit is a high grade breccia hosted “Carlin-type” gold deposit located at the north end of the Carlin Trend. Storm consists of 3 smaller deposits: 1) 49er Zone, 2) End Zone, 3) Discovery
Jan 1, 2001
-
The Hallandsås Dual Mode TBMBy Werner Burger
The Hallandsås project with a long history, first started in 1991, is well known in the tunneling community. In the past it has been stopped twice for technical and environmental reasons. The third at
-
Dewatering for the Lenox Avenue Subway Reconstruction ProjectBy Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin
The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr
Jan 1, 2001
-
Progress Toward A Deep Underground Science And Engineering Laboratory At The Homestake Mine In Lead, South DakotaBy Cathleen J. Webb, Arden D. Davis
The Homestake Gold Mine at Lead, South Dakota, has been proposed as the host site for the Deep Underground Science and Engineering Laboratory. The laboratory will house neutrino experiments in mine w
Jan 1, 2005
-
Optimizing Usage Of Installed Size Reduction Power At Minera PeñasquitoBy S. Dixon
The Peñasquito deposit in Mexico is one of the largest grassroots precious metal discoveries developed in recent years. Goldcorp Inc. acquired the gold-silver-lead-zinc property with the acquisition o
Jan 1, 2012
-
Rare Earths: A Magnet Producer?s Perspective - IntroductionBy S. Constantinides
Over the past 100 years we have witnessed a revolution in permanent magnetic materials. Prior to 1932 electrical machinery depended upon steels for both the soft and the permanent magnet structures.
Jan 1, 2011
-
Recent Developments In Dense Medium Cyclone Circuit Design – PreprintBy L. Watters, R. Terry, D. Placha
Dense medium cyclones are the preferred means for cleaning 1/2 in. x 14Mesh to 28Mesh (12.7 mm x 1.0 mm to 0.6 mm) raw coal and are becoming a common choice for cleaning raw coal from a nominal top si
Feb 24, 1997
-
Exploration (692d4533-e846-4408-ba93-9ba3d3c0a995)By D. R. Wilburn
The worldwide budget for non fuel mineral exploration was expected to increase by 27 percent in 2003 from the 2002 budget, according to the Metals Economics Group (MEG) of Halifax, Nova Scotia. The i
Jan 1, 2004
-
TBM Tunneling At The Ashlu Hydropower Project, Squamish, BCBy Serge Moalli
The Ashlu Creek Hydro-electric project, located north of Squamish, BC, at the confluence of Ashlu Creek and the Squamish River, comprises a 49 MW run-of-river project and features a 4.08 m diameter, 4