Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Incorporation Of Ore Grade Uncertainty Into The Push Back Design ProcessBy J. Gholamnejad
In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi
Jan 1, 2007
-
Financial Impact Of Resource/Reserve UncertaintyIn constructing a financial model of a project significant effort is expended on capital and operating cost estimation, commodity price forecasts, and choice of discount rates while uncertainty in the
Jan 1, 1999
-
Exploration Strategy And Application At Ashanti?s Obuasi OperationsBy J. A. Cox
The Ashanti mine is located within the Lower Proterozoic Birimian of Ghana, and covers a concession of 474 square kilometres at its Obuasi operations which comprise large scale underground, surface an
Jan 1, 1999
-
Activity Based Costing: Challenging The Way We Cost Underground Coal Mining SystemsBy G. H. Lind
This paper discusses the traditional costing approach currently used in the underground coal mining industry. Activity Based Costing (ABC) is identified as being a potentially more effective manner in
Jan 1, 2001
-
Optimisation Of Specific Power Consumption In The Production Of Ferro Alloys Through Rationalisation Of Charge DistributionBy S. Ranganathan
Production of ferro-chromium in the submerged-arc furnace is highly energy-intensive. Several process rates have been attempted to reduce the specific energy consumption in the production of this allo
Jan 1, 2007
-
Accelerated Kimberlite Weathering - The Role Of Cation Type On The Settling Behaviour Of FinesBy E. T. Boshoff
Paper written on project work carried out in partial fulfilment of B. Eng. (Metallurgical Engineering) The weathering of kimberlite can be accelerated with cations in solution if swelling of the ki
Jan 1, 2005
-
The Residue Waste Disposal Facility For Iscor?s Hillendale Project In KwaZulu-NatalBy J. R. G. Williamson
The Mining Division of Iscor, an integrated minerals and metals company, has recently completed a feasibility study for the establishment of a new heavy minerals mine and smelter in the Richards Bay a
Jan 1, 1997
-
Evaluation of roof rating systems being used in South AfricaBy T. Dlokweni
Several Rockmass classification systems have been developed and used in Civil Engineering design and for underground mining operations. Some of these rockmass classification systems have been modified
Jan 1, 2003
-
Measurements and analyses of blasting vibrationsBy J. Werfling, J. R. Kiehl
SUMMARY: The effects of blasting on structures are assessed on the basis of the maximum amplitudes of the occuring vibration velocities. If the standard values in the German Standard DIN 4150 are not
Jan 1, 2003
-
Annual General Meeting of the InstituteThe Annual General Meeting of the South African Institute of Mining and Metallurgy was held in Kelvin House on Wednesday, 24th August, 1977. Dr M. D. G. Salamon (President) was in the chair and dec
Jan 1, 1978
-
Strengthening Of A Cold Worked 17% Cr Ferritic Stainless Steel (Type 430) By Heat TreatmentBy M. Sephton
Slat-band chains, currently manufactured from Type 430 ferritic stainless steel, are used as conveyors in various industries. A process to strengthen these chains?with the aim of prolonging the lifeti
Jan 1, 1997
-
Leaching of Copper SulphidesBy Marko Lampi, Marc Nicolle, Janne Karonen, Kari Valkama
"In the ten years from 2003 to 2013 global mine production of copper has increased by over 23% to meet demand while the weighted average head grade has dropped from 0.9 to 0.7% Cu. These divergent tre
Jan 1, 2015
-
Factors Affecting The Quality Of Tunnel Infrastructure At Premier Diamond MineBy M. S. Smith
Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree The condition of tunnels at Premier has deteriorated to such an extent that an objective viewpo
Jan 1, 2004
-
Rockpass Stability And Rehabilitation At AngloGold Ashanti?s Tau Lekoa MineBy G. B. Dukes
Scaling of rockpasses was problematic at Tau Lekoa Mine prior to production commencing in 1991. High horizontal stress levels relative to the host rock mass strength have been instrumental in causing
Jan 1, 2006
-
The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)By V. Mathebula
Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv
Jan 1, 2004
-
CFD modelling of methane movement in minesBy D. Whittles, C. J. Lea, T. X. Ren, A. Kelsey
A methodology for the simulation of methane drainage combining geotechnical modelling and computational fluid dynamics (CFD) will be described. Geotechnical modelling was used to predict the developm
Jan 1, 2003
-
Technical Note: Reduction Of Waste From Fabrication ProcessesBy J. Bongardt
Ecologically acceptable techniques are described for the handling of waste materials from the fabrication industry. New production methods and the recycling of sludges from grinding and other waste ma
Jan 1, 1997
-
The Effect of Solids Suspended in a Nickel Electrolyte on Deposit MorphologyBy K. G. Matshika
"Nickel electroplating from sulphate electrolyte is an efficient process. To achieve good quality cathode, however, parameters such as temperature, nickel concentration, pH, electrode alignment, elect
Jan 1, 2015
-
A Decade Of Change - Mineral Exploration In West Africa - IntroductionBy D. Pohl
The past decade has seen rapid expansion in the West African mineral exploration environment. This expansion has been largely driven by changes in ?Political climate ?Fiscal and legal regimes ?Ex
Jan 1, 1998
-
Sawability Prediction Of Carbonate Rocks From Brittleness IndexesBy O. Gunaydin
Performance measurements of large-diameter circular saws were conducted on eight different carbonate rocks in marble factories located in some areas of Turkey. Rock samples were collected from these f
Jan 1, 2004