Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures (a3ef629c-b178-4045-bc88-d04c273fd2c0)

    By Ewan Selers, Gary Cavanough

    Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech

    Jan 1, 2016

  • ISEE
    Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power Plant

    By Thierry Bernard, Philippe Dozohne

    May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate

    Jan 1, 2001

  • ISEE
    Rebuild of a Flash Smelting Furnace Using Explosives

    By Scott G. Giltner, Terry Millar, Ben Bringhurst

    "Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo

    Jan 1, 2016

  • ISEE
    Driving Continuous Improvement Through Blast Design Technologies in a Surface Quarry

    By Toby Forney, Joshua Schoonover

    In typical surface quarry operations, productivity and efficiency related to pit development begin with drilling and blasting efforts. By embedding technology within drilling and blasting operations,

    Feb 6, 2023

  • ISEE
    Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in Canada

    By Scott King, Norm Patterson, Ruilin Yang

    The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w

    Jan 1, 2018

  • ISEE
    Maximizing Rotary Blast Hole Drills

    By John W. Brown

    The purpose of this paper is to describe different methods of evaluating the performance of your current rotary blast hole drills. To properly evaluate a drill rig's performance you should include a c

    Jan 1, 1998

  • ISEE
    Physics Based 3D Rock Blast Movement Modelling

    By THOMAS BAMFORD, Dale S. Preece, Amir Behbahanian, Mick Lownds

    An important aspect of blasting is rock movement and final muck configuration. Computer modeling of this process has been done in 2D for many years, revealing insights into the blasting process and en

    Jan 26, 2026

  • ISEE
    Geospatial Modelling Methods to Incorporate Subdrill in Powder Factor Calculation and Mine to Mill Analytics

    By Stephen Mansfield

    In open-pit mining operations, the drill and blast processes have a significant impact on the downstream operational performance of crushing and grinding of ores and recovery of metal. The blast patte

    Feb 6, 2023

  • ISEE
    Reducing eyebrow break caused by rock blasting in Malmberget mine

    By Zong-Xian Zhang

    In sublevel caving mines, serious eyebrow break usually gives rise to lower ore recovery, higher dilution, and worse safety for the people working in the field. For example, chargers must go near the

    Jan 1, 2011

  • ISEE
    Journal: History of ISEE – Timeline / 35 Years

    1974 The Society of Explosives Engineers officially formed to “advance the art and science of explosives engineering” on August 20, 1974 in Pittsburgh, Pennsylvania.

    Jan 1, 2010

  • ISEE
    Underground Mega Mass Blasting with Electronic Initiation Near Urban Area (d4770d5b-0062-4b3c-9658-460485a3a3f4)

    By Jean-Francois Lagueux, Andre Pomerleau

    Goldex Mine is an underground mine located near the town of Val-d’Or. Multiple innovations were required to work the mine. Due to its low grade, it was important to develop a bulk mining method to eco

    Jan 1, 2011

  • ISEE
    Implosions as Mitigations for Offshore Oil Disasters: Risk Decision Matrices

    By Mohammed Alkazimi, Katie Grantham

    The purpose of this paper is to quantify the risk to both the environment and surrounding infrastructure from a pipe sealing implosion. Both accuracy and the precision in determining how a submerged i

    Jan 1, 2013

  • ISEE
    Underground Blast Doors: Measured Pressure Drop and Human Exposure Safety

    By Matthew Hirsch, Jason Connot, Nathan Rouse, Srivatsan Jayaraman, Akash Adhikari, Brent Meins, Purushotham Tukkaraja

    The Deep Underground Neutrino Experiment (DUNE) is a world-class particle physics research project currently being constructed 4,850 ft, 1,478 m underground at the Sanford Underground Research Facilit

    Feb 6, 2023

  • ISEE
    A New Method of Shaft Sinking

    By John Cowin, Dan McCutchen

    Cowin & Company has specialized in underground construction since 1924. This paper reviews the sinking of two shafts in the Alabama coal fields using bulk-loaded explosives. Each shaft is eighteen hun

    Jan 1, 2000

  • ISEE
    Plug Blast for a Powerhouse Intake Using an Unusual Technique

    By Terry Matts, Bruce Ripley, Clark Fletcher, Paul Rapp, Stan Holtby, Jim Dent

    The Stave Falls Project of BC Hydro, situated 65km east of Vancouver, BC, Canada, involved the construction of a new two-unit 9OMW hydro-electric facility to replace an existing powerhouse. The final

    Jan 1, 2000

  • ISEE
    Technology for Risk Management and Decision Making in Civil Explosives

    By Johan Hawinkel

    This paper explores the journey through time of technology in the civil explosives market to provide testing, measurement, analysis and control tools. This ultimately leads to better decision-making,

    Feb 1, 2020

  • ISEE
    IMESAFR Sensitivity Studies

    By Tyler Ross, John Tatom, Lon Lantis

    The Institute of Makers of Explosives (IME) began development of a Quantitative Risk Assessment (QRA) tool, IMESAFR (Institute of Makers of Explosives Safety Analysis for Risk), in 2005 as a technolog

    Jan 1, 2014

  • ISEE
    Use of Basic Statistics for the Overlapping Timing Analysis of a Single Blast Hole

    By Lifent Li, Jhon Silva-Castro

    Since millisecond-delay detonators were first introduced, at least two variables, among others, have been more closely considered when timing a mining blast: the accuracy and the precision of the init

    Jan 1, 2015

  • ISEE
    Evaluating Explosive Type and Water-Casing for Demolition Kicker Charges

    By Rachel L. Bauer, Catherine E. Johnson

    Explosive demolition involves first, the use of cutting charges to sever a column and second, kicker charges to move it out of alignment. Dynamite is the traditional explosive used in kicker charges a

    Jan 21, 2025

  • ISEE
    Public Relations for Drilling and Blasting Projects

    By Mark Fritzen

    Drilling and blasting near residential or business inhabited areas may expose people to blast induced vibration. Many of these people have never been exposed to blast vibration and airblast which can

    Jan 1, 2000