Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Incorporating Set-Up Into Reliability-Based Design Of Driven Piles In Sandy SoilsBy Luo Yang
It has been known that after initial pile driving, pile capacity gain over time (set-up) could constitute a significant portion of the total pile capacity. In the past, there has been very little guid
Jan 1, 2006
-
An Innovative Approach To Load Testing Of High Capacity PilesBy P. Bermingham
A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma
Jan 1, 1989
-
Innovative Use Of Piles For Retaining Sides Of Deep Excavations ? SynopsisBy D. V. Karandikar
Contiguous bored piles have been used in the past for retaining the sides of deep excavation. An innovative version of this method was adopted successfully in two prestigeous projects in Bombay in whi
Jan 1, 1996
-
Nonlinear Response of Piles with Rigid Embedment: Lessons Learned from a Reduced- Scale ExperimentBy Camilla Favaretti, Benjamin Turner, Anne Lemnitzer
Pile foundations are extensively used in the construction of various types of superstructures, including tall buildings, bridges, freeways and offshore structures. A fully constrained tip embedment su
Jan 1, 2018
-
Evaluating Excavation Support Systems To Protect Adjacent Structures (The 2010 Michael W. O?Neill Lecture)By Richard J. Finno
This paper presents an overview of methods that can be used to predict damage to buildings as a result of excavation-induced ground movements and describes an adaptive management approach for predicti
Jan 1, 2010
-
Load Transfer And Capacity Of Drilled Shafts With Full-Depth CasingBy Rolf Katzenbach
Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we
Jan 1, 2007
-
Practical Experiences On Pile Dynamic Measurement In Shanghai - SynopsisBy J. Pei
The studies of dynamic measurements using stress wave theory has commenced in China. This paper introduces some practical experiences using "CASE method" in Shanghai showing applications of dynamic me
Jan 1, 2010
-
Kinematic Load Tests On A Model Pile In ClayBy Michael J. Brown
Load testing is important for controlling the quality of piled foundations. The Statnamic test is an alternative to existing testing methods with a load duration that lies between that for static and
Jan 1, 2002
-
High Capacity Rock Anchors At The Bear Mountain BridgeBy Frederick C. Rhyner
This paper describes the design and construction of two high-capacity rock anchors to restrain a supplementary backstay for the Bear Mountain Bridge, which is a suspension bridge spanning the Hudson R
Jan 1, 2010
-
Davison Freeway Reconstruction Utilizes Design/Build Retaining WallsBy Thomas C. Anderson
Thirty-four retaining walls are part of the $46 million upgrade of a 1942 depressed highway in Highland Park, Michigan near Detroit. This project will close a missing link between two newer roadways,
Jan 1, 1999
-
A Contribution To The Behaviour Of Piled Raft FoundationsBy H. L. Jessberger
In recent years piled raft foundations of multi-storey buildings on weak soils have generated much interest and discussion. By taking account of the effects of each component of the system - the pile
Jan 1, 1991
-
Impact Of Environmental Regulations On Pile Foundation Design And Construction Using Diesel HammersBy R. D. Short
Environmental regulations for noise and air pollution are directly affecting the type of equipment and construction techniques being utilized for pile driving construction using diesel hammers in Cali
Jan 1, 1989
-
Integrity Testing - Friend Or Foe?By Bernard H. Hertlein
Transportation system structures have come under very close scrutiny in the last couple of years, largely due to the damaging effects of disasters, both natural and man-made. In the Pacific northwest
Jan 1, 1998
-
Challenges And Uncertainties Relating To Open CaissonsBy Fathi Abdrabbo
Open caissons are used for many geotechnical engineering applications. Open caissons may be used as deep foundation elements bypassing weak soils to tip in firm deeper strata, and in rivers and mariti
Jan 1, 2012
-
Displacement And Pore Pressure Monitoring During Installation Of Drilled Displacement PilesBy Lisa M. Splitter
Drilled displacement piles were constructed as the foundation for a proposed 10-story building in San Francisco, California. At the study location, the stratigraphy consists of 14 to 21 feet of fill
Jan 1, 2009
-
Rehabilitation Of Tilted Large Drainage Caisson ? SynopsisBy M. A. El-Sohby
The paper describes some problems encountered with the foundation of a deep drainage caisson constructed on the Nile Bank in Cairo. The use of suction dredging while sinking the caisson led to a pipin
Jan 1, 2010
-
Foundations For Offshore Wind Energy Converters - A Review Of Some Current Scadinavian Development ProjectsBy K. Viking
This article deals with some of the civil engineering related problems to be encountered when offshore wind energy projects transform from prototype offshore wind energy converter farms, developed and
Jan 1, 2005
-
Bending Strength Of Threaded Micropile ConnectionsBy Steven R. Musselman
The bending strength and flexural stiffness of a micropile at its threaded connection is less than its intact strength and may fail due to thread slippage or by fracture through the pin (reduced cross
Jan 1, 2007
-
Rapid Vibratory Pile Driving Hammer For Deep FoundationBy Li Tiemin
It is one of important tasks in research of vibratory pile driving to increase speed of pile driving and depth of pile driving -- this means to increase capability of penetrating hard layer. In genera
Jan 1, 1991
-
Soldier Pile Installation Light Rail Rapid Transit Buffalo, New York - Project DescriptionBy Daniel J. Rider
In 1980 the Niagara Frontier Transportation Authority contracted for three miles of cut and cover box structure and station construction in Main Street, Buffalo, New York. Project depths ranged from
Jan 1, 1987