Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Westwood Project Acceleration

    Westwood Quebec Long Life, Low Cost CONSTRUCTION UPDATE ? Shaft advanced to 840m (after 1 year), 3 km of down ramp and 2 km of exploration drift ? Head frame and hoist room structure completed ?

    May 1, 2010

  • CIM
    Process Mineralogy of Sudbury Platinum Group Minerals as Determined by Mineral Liberation Analyzer

    By Manqiu Xu, Andrew Lee, Frederick D. Ford, Cara Wercholaz

    "Platinum-group minerals (PGM) typically occur in such low concentrations that quantitative mineralogical evaluation is difficult or impossible. The FEI MLA system used by Vale Base Metals Technology

    Jan 1, 2011

  • CIM
    Tensile Strength Anisotropy of Barre Granite

    By F. Dai

    Granitic rocks usually exhibit strongly anisotropy due to pre-existing microcracks induced by geologic loadings. The understanding of the rock anisotropy in mechanical properties such as tensile stren

    May 1, 2009

  • CIM
    Brunswick Mine SAG Mill Liner Design and Wear

    By Chris Larsen, Ian Orford, Marilene Renaud, Mike Cooper, Lud Strah

    "An AG/SAG mill was commissioned at the Brunswick Mine concentrator in October 1998. This paper discusses the original liner design for the bi-directional AG/SAG mill, observed liner wear, subsequent

    Jan 1, 2003

  • CIM
    Mining the Retreat Zone Between Two Converging Pyramids at Noranda?s Bell-Allard Mine

    By Véronique Falmagne

    The mining sequence at Noranda?s Bell-Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modeling

    May 1, 2003

  • CIM
    Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests

    By A. S. Moghaddam

    The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe

    May 1, 2007

  • CIM
    Advanced Control for Mineral Processing: Better Than Expert Systems

    By Robert K. Jonas

    "Minerals processors can improve production by using the best available control technology to control their operations. Many mines use expert systems that can provide improved results over manual or b

    Jan 1, 2008

  • CIM
    The Mechanics of Operation of Column Flotation Machines

    By R. L. Amelunxen

    "In January 1983, Gibraltar Mines Ltd. started an exploratory program on Column Flotation with hopes of improving performance of the Molybdenum Cleaning circuit. The encouraging results led to a colum

    Jan 1, 1985

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • CIM
    Cyanide Elimination at Giant Yellowknife Mines

    By H. E. Pawson

    "COMMON METHODS OF ELIMINATION: The four methods most frequently used to dispose of cyanide wastes are:1. Oxidation2. Dilution with water or with cyanide free wastes3. Acidification and dilution of re

    Jan 1, 1973

  • CIM
    The Effect of Lump Ablation on Pressure Gradient in Oil Sand Hydrotransport Pipelines

    By D. Wolfe, K. Reid, T. Nunn

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. In order to minimize front-end rejects, and to allow for high throug

    Jan 1, 2014

  • CIM
    Assessing the Returns to Copper Exploration, 1989-2008

    By R. A. Leveille, M. D. Doggett

    "Economic returns for the copper industry have been assessed by building cash flow models for each of the 100 new mines brought into production over the past 20 years. Ninety-one of the 100 new mines

    Jan 1, 2009

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • CIM
    Improvement of Elements of Safety Culture in KGHM Glogów Copper Smelter

    By Gabka T., R. E. Gregorczyk

    Work to improve employees' behavior in Głogów Copper Smelter began in 2009. It has been noted that over 90% of accidents at work are attributable to human reasons. At that time, a series of external w

    Jan 1, 2019

  • CIM
    Factors Influencing the Expert System Profitability

    By Andy Fortin, André Vien, Christophe Bouché, Jeff McKay

    "The technology and equipment design of the Twenty-first Century permit us to exploit low-grade ore bodies with milled tonnages reaching 300,000 tpd. Because of their substantial operational costs (en

    Jan 1, 2003

  • CIM
    Application of the SART Process to Heap Leaching of Gold-Copper Ores at Maricunga, Chile

    By Kevan J. R. Ford, Chris A. Fleming, Robert D. Henderson

    "Kinross Gold Corporation’s Maricunga mine in Chile presents an ideal opportunity to apply the SART process to a heap leach operation. Given increasing levels of cyanide complexed copper in current pr

    Jan 1, 2008

  • CIM
    Including In-Process Inventories in the Metal Accounting of Flotation Plants

    "Increasing demand for timely and accurate information about flotation plant performance requires metal accountants to increase the scope and reporting frequency of plant production. This trend has br

    Jan 1, 2014

  • CIM
    Implementation of the management safety audit system

    By Claude MacDonald, John H. Ashburn

    "IntroductionIndustrial growth and technological change over recent years had been accompanied by two major sources of concern to management and employees: (a) increase in occupational injury and illn

    Jan 1, 1987

  • CIM
    Real Time Performance Management in Metallurgical Operations

    By O. A. Bascur, J. Patrick. Kennedy

    "The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic

    Jan 1, 2004

  • CIM
    Methodologies for Scale Up of Grinding and Flotation Circuits for New CVRD Projects

    By K. L. C. Gonçalves, V. K. Alves

    "CVRD’s Department of Development and Technology – GETEK has been developing and perfecting a general methodology for scaling up flotation and grinding circuits over several years. This methodology ha

    Jan 1, 2006