Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Expert Systems for Control of No. 4 Autogenous Mill Circuit at Wabush Mines

    By P. Cleyle, K. McDermott, M. Hall, C. A. Harris

    "This paper describes the implementation of an expert system for monitoring and control of the NO. 4 autogeneous mill and spiral circuits at Wabush Mines.This process control system incorporated the m

    Jan 1, 1992

  • CIM
    Mining at Depth

    "Many underground mines are achieving extended life and optimizing existing facilities by mining at greater depths. The challenges to do this require a sound engineering approach to mine design and mi

    Jan 1, 2004

  • CIM
    Summary of Investigation into Mechanical Loading, Transportation, etc., in Great Britain, Germany, and Holland, 1947

    By L. Frost

    Physical Conditions Great Britain The physical conditions in the mines investigated in Great Britain are similar to those found in the mines of the Dominion Steel and Coal Corporation, with the

    Jan 1, 1948

  • CIM
    Historical Notes on the Patio Process

    By T. A. Rickard

    FROM AN OLD MANUSCRIPT THE text for this contribution to the history of the Patio process is a page taken from a Spanish manuscript of Bartholomé Arzaj Sanches y Uela, now in the possession of the li

    Jan 1, 1935

  • CIM
    Laboratory and in situ investigations of tracking cutters for computer-aided design of shearer drums

    By B. Tiryaki, M. Ayhan, O. Z. Hekimoglu

    "This paper discusses the aspects of tracking cutters related to the computer-aided design of shearer drums. A comprehensive computer analysis of drum dynamic parameters for multi-tracking tool arrang

    Jan 1, 2003

  • CIM
    The effect of acidity ’at temperature’ on the morphology of precipitates and scale during sulphuric acid pressure leaching of laterites

    By D. H. Rubisov, V. G. Papangelakis

    Sulphuric acid pressure leaching is the process of choice to recover nickel and cobalt from laterites with variable iron and magnesium contents. The latter influences the acidity levels required for e

    Jan 1, 2000

  • CIM
    Wood Refuse Burning in the Central Steam Plant Hollinger Mine

    By E. T. Turner

    Introduction 1n assembling material for this paper on Wood Refuse Burning 1 turned first to the records of our early studies of the problem in order to learn how and why certain basic decisions were

    Jan 1, 1951

  • CIM
    The Geology of the Cluff Lake Uranium Deposits

    By Charles T. Harper

    The uranium deposits discovered by Amok (Canada) Ltd. in the Cluff Lake area of north western Saskatchewan occur at or near the southern edge of the uplifted basement core of the Carswell circular str

    Jan 1, 1978

  • CIM
    Discount rates and risk assessment in mineral project evaluations

    By Lawrence Devon Smith

    "The concept of risk is well established in the mining industry. It is acknowledged when estimates of reserves are expressed as proven or probable, when mining and metallurgical recoveries are applied

    Jan 1, 2003

  • CIM
    Commissioning of the BIOX and ASTER™ Processes at the Runruno Gold Project

    By M. Savella

    The Runruno Gold Project is located on the island of Luzon, approximately 200 km north of Manilla in the Philippines. The mine is a surface mine operation and use the proven BIOX® and carbon in leach

    Jan 1, 2017

  • CIM
    Update on Falconbridge's Sudbury Nickel Smelter

    By J. Chenier, M. Boissoneault, D. Ducharme, R. Schonewille

    The operation of Falconbridge's Sudbury nickel smelter has undergone significant change since the production was consolidated to a single electric furnace in 1994. In the late 1990's a capit

    Jan 1, 2005

  • CIM
    Westar Mining Ltd.-an overview of operations in southeast British Columbia

    By L. B. Hale

    "Introduction This paper will discuss the current operations of Westar Mining Ltd. and give a brief history of the company and of the Crowsnest Pass area. Westar is an integrated company involved in m

    Jan 1, 1985

  • CIM
    Some Aspects of Industrial Safety and Accident Prevention in Coal Mines

    By V. A. Cooney

    Introduction For the compliment paid me by the Institute's kind invitation to speak this afternoon, I am very grateful. For the astuteness of your officers in determining that encouragement sh

    Jan 1, 1946

  • CIM
    Symposium on Tailings Revegetation

    By E. Watkins, J. C. LeRoy, A. Vivyurka

    "TAILINGS REVEGETATIONWelcome to the Revegetation Session. My instructions are to introduce the Speakers and to provide a general introduction.I do the latter with humility not only because of a lack

    Jan 1, 1975

  • CIM
    Aboriginal Employment Panel

    By Linda Hodgson

    1. Introduction ?Northgate Minerals Corporation is a mid-tier gold and copper producer with mining operations, development projects and exploration properties in Canada and Australia. ?Kemess Mine i

    May 1, 2010

  • CIM
    Base-Metal Deposits of the Bathurst-Newcastle District: Characteristics and Depositional Models

    By Steven R. McCutcheon

    ABSTRACT - The Bathurst-Newcastle district, a subcircular area approximately 50 km in diameter, contains 37 massive-sulfide Zn-Pb-Cu deposits that have defined tonnages, and has 58 additional signific

    Jan 1, 1992

  • CIM
    Water Problems in the Cape Breton Coal Mining Districts

    By J. L. Bowlby

    Introduction In the following discussion, boiler-feed and mine waters will be considered from the point of view of the problems arising from the chemical nature of the mineral and gaseous impurities

    Jan 1, 1934

  • CIM
    Effect of Solids Loading on Gas-Liquid Mass Transfer Rates: An Analysis of Various Correlations

    By Larry M. Southwick

    Extraction of gold and other metals from ores suspended in liquid slurries often involves gases (such as oxygen) as a participant in the reaction. An important factor then in setting the rate of extra

    Jan 1, 1999

  • CIM
    Virtual Geologist ? Creating Photo-Realistic 3D Models of Underground Mines with instant Mine Modeller

    By Stephen Se

    Geological assessment of active mine faces enables ore grade control, geological modelling and exploration planning. Monitoring of the mine advancement at every drill-blast-muck cycle allows for effec

    Oct 1, 2009

  • CIM
    World’s Largest 28 MW AG Mills, Largest Shop Trial, One Piece Delivery & Installation (26e1b765-3ec1-447d-8206-6ab79dbb100f)

    By Rajiv Kalra, Ji Jiangang

    "This paper reviews the following aspects of the world’s largest manufactured Grinding Mill’s in terms of diameter and power, along with the world’s biggest shop assembly and trial run of the mills de

    Jan 1, 2012