    High Energy Bulk Explosives and Mine to Mill Focus – the Mt Rawdon Story

    By D Morton, G Wallace

    "Evolution Mining is the sole owner of the Mt Rawdon open cut operation, located 75 km south-west of Bundaberg in Queensland, Australia (Figure 1). It is a massive, volcanically hosted, low-grade gold

    Nov 15, 2016

  • AUSIMM
    Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto Way

    By G Danckert

    The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat

    Jul 11, 2011

  • AUSIMM
    Characterisation and calculation method of friction resistance based on fractal theory of roadway rough surface

    By B Wu, C Zhao, B Lei

    At present, the friction factor is calculated by measuring pressure drop and airway configurations. However, the workload of on-site measurement is heavy, and the measurement results are easily distur

    Oct 12, 2022

  • AUSIMM
    The SNIM Guelb II Project in Mauritania – Process Design Challenges

    By G Cooper

    The Société Nationale Industriel et Minière (SNIM) is expanding its ore and concentrate production capacity in Mauritania, West Africa. This government-controlled mining company has bee

    Jul 11, 2011

  • AUSIMM
    Spontaneous combustion hazard assessment of McArthur River Mine waste rock

    By P Marianelli, J Theiler, B Beamish, A Spillman

    The presence of reactive pyrite in waste rock contributes to the hazard of spontaneous combustion in emplacement facilities as it acts as an initiator of self-heating at low ambient temperatures. Orga

    Jul 23, 2018

  • AUSIMM
    Clem Jones Tunnel – A Study of the use of Precast Concrete for Quick and Efficient Construction

    By M Hawkins

    The Clem Jones Tunnel (formally known as the North-South Bypass Tunnel), a A$2.88 billion road tunnel project in Brisbane, Queensland, was successfully completed almost seven months ahead of schedule.

    Mar 8, 2011

  • AUSIMM
    Do We Maximise the Value of Our Operations through Our Definition Drilling, Resource Estimation and Mine Planning Strategies?

    By S O’Connell, M Scholz, A Robertson, M L. Bloss

    The value created in any mining operation is a function of the mine plan. The quality of this plan is dependent on the strategies employed during definition drilling, resource estimation and mine plan

    Jun 22, 2016

  • AUSIMM
    Sustainability in Mining Engineering - Strategies Through Education and Research

    By A J. Gunson

    The Norman B Keevil Institute of Mining Engineering, or the Department of Mining Engineering (the Department), at CanadaÆs University of British Columbia (UBC) is addressing the integration of sustain

    Jan 1, 2009

  • AUSIMM
    Quantifying iron ore ‘handleability’ to reduce processing plant delays

    By P Cherepanskiy, G Elphick, R Hus, C Perring

    When an iron orebody nears its end of life, the extracted material can become increasingly problematic to handle. Higher moisture content occurs as larger portions of originally-below-water-table mate

    Jun 22, 2022

  • AUSIMM
    Application of three lines model in resource and reserve estimation and reporting

    By D Hope, D K. Mukhopadhyay, J D. Harvey

    South32 (S32), a globally diversified mining and metals company, is listed on securities exchanges around the world (ASX, JSE, LSE), with its primary listing being on the Australian Securities Exchang

    May 24, 2023

  • AUSIMM
    How Much Do We Need to Drill?

    By C Taylor, E Retz

    Sequential Gaussian conditional simulation of wide-spaced exploration data has been completed in order to optimise a drilling grid at Fortescue’s Eliwana deposit. The aim of this drill grid is to impr

    Jul 13, 2015

  • AUSIMM
    Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case Study

    By I Elias, E Moya, S Chaffer

    This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage

    Jul 13, 2015

  • AUSIMM
    Geological Modelling and Bench Face Survey to Improve Blasting Fragmentation

    By E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos

    Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio

    Aug 24, 2015

  • AUSIMM
    Effectively Installing and Commissioning Flotation Equipment

    By B Murphy, J L. Heath

    Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th

    Sep 1, 2014

  • AUSIMM
    A Paradigm Shift in Underground Raisebore Reamer Removal

    By P Viljoen, A Holland, C Parken

    In the raisebore industry, there are two known methods of removing large diameter reamer heads once the reaming of an underground shaft is complete: 1. Lower the reamer head to the base of the shaft a

    Mar 15, 2021

  • AUSIMM
    A new test method for directional propagation of type-I rock cracks

    By W Y. Guo, L X. Chen, D X. Zhang

    To obtain the rock type-I crack propagation process accurately, a novel fixture is used to make the prefabricated crack of rock propagation along the predetermined direction. In this study, the crack

    Nov 29, 2022

  • AUSIMM
    Discovery of the Corunna Downs Deposits

    By P J. Howard, P Darvall, J H. Mainwaring

    In less than a year, Atlas Iron’s Corunna Downs Project has moved from a new discovery to a substantial resource of high quality in an underexplored greenstone belt. Located approximately 170 km south

    Jul 13, 2015

  • AUSIMM
    The æSmoking GunÆ of Detailed Mine Closure Cost Over-Run - A Review Using Case Studies of the Real Costs Associated with the Demolition and Removal of Infrastructure in Mine Closure

    By A Hutton, C Dick, D Fletcher

    Mine and facility closure planning is a dynamic and rapidly evolving landscape. In this landscape, mining companies and industry consultants are generally good at estimating the associated earthworks

    Jul 10, 2012

  • AUSIMM
    Segmental Tunnel Lining Breakouts and Cross Connection Tunnels – Adelaide Desalination Plant, Australia

    By L Drowley

    The Adelaide Desalination Plant (ADP) draws raw sea water into the facility and returns saline concentrate to the Gulf St Vincent via subsea conduits. This paper describes the detailed design and cons

    Mar 8, 2011

  • AUSIMM
    Integrated Site Water Balances and Water Quality Models for Decision-making over Life-of-mine

    By R Strand, B Usher

    Environmental compliance and mine designs are increasingly including assessment of flows and water qualities as a key driver to decision-making over life-of-mine. Integrated site-wide water quality mo

    Jul 16, 2014