Critical process design considerations from test work to operationsBy A Dennis, T Hunter, R Coleman
For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin
Sep 11, 2017
-
Safety of a Tailings Storage Facility against Dam InstabilityBy D Veneziano, J Van Dyck, R Snow, W Pytel, O Zanoli
Best practice standards generally recommend assessment of the environmental and societal risks posed by tailings storage facilities, but they rarely specify how the analysis should be made. As a case
Jul 27, 2015
-
Engineering the New Olympic Dam Backfill SystemBy A G. Grice
WMC Resources Pty Ltd û Copper Uranium Division operates the large underground Olympic Dam Mine at Roxby Downs, South Australia. These operations mine and process the ore to produce refined copper, ur
Jan 1, 2000
-
Commissioning of the Kanmantoo Copper ConcentratorBy J Seppelt
The Kanmantoo Copper Project is owned and operated by Hillgrove Resources Limited and is situated in the Adelaide Hills region in South Australia. Mining in the area has taken place off and on over th
Oct 29, 2012
-
Computer Assessment of Grades and Tonnages in an Operating Open-Pit MineDigital computers, by virtue of their capacity for high speed repetitive calculation at low cost, are finding increasing application to routine calcula- tions in the mining industry. In this paper te
Jan 1, 1971
-
Incorporation of Pebble Crusher Specific Energy Measurements for the Optimisation of SABC Grinding Circuit Throughput at TelferBy X Zheng, P Manton
Pebble recycle crushing circuit performance at Telfer has historically fallen significantly short of the design product P80 of 12 mm. An investigation was undertaken to evaluate the current pebble cru
Jan 1, 2009
-
Research and Application of Total Tailings Backfill at Zhangmatun Iron Mine (163a2830-6e6a-4b23-b34c-e44378a86b18)By Aiming Z, Shenyi S, Xialei W
Zhangmatun Iron Mine is situated in the suburbs of Jinan city. Shandong, China. Because of surface environmental constraints, no suitable site can he selected to dispose of mill waste. The full mill
Jan 1, 1998
-
High-Density Sludge Process for Treating Metal Bearing Acid and Metalliferous Drainage WastewatersBy A Dal-Corobbo
Traditional acid and metalliferous drainage (AMD) wastewater treatment focuses on the iron co-precipitation/adsorption process as this is a very effective method of reducing heavy metals, including co
Nov 26, 2013
-
Selective Extraction Dynamic Cone Algorithm for Three-Dimensional Open Pit DesignsBy Mogi G, Akaike A, Yamaguchi U
A new algorithm has been investigated for three-dimensional open pit designs to improve the dynamic cone approach which utilises the dynamic programming technique. The conventional dynamic cone met
Jan 1, 1995
-
Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai MineBy D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah
Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected
Aug 24, 2015
-
Optimisation of Wash Water on an Iron Ore Spiral to Improve GradeBy C M. Ramotsabi, F Bornman, W Erasmus
Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine
Jul 13, 2015
-
Bentonite and Fuller's Earth Deposits of New South Wales: I. Occurrence, Mineralogy and Physical PropertiesBy See G. T
Bentonites and fuller's earths from seven localities in N.S.W. have been analysed with respect to occurrence, mineralogy and physical properties and areas for future prospecting have been indicat
Jan 1, 1959
-
The Nature of Shear Zones Formed During Extension in Eastern Papua New GuineaGoodenough and Fergusson Islands, in eastern PapuaNew Guinea, lie in an area of crustal extension on the western end of the Woodlark Basin seafloor spreading system. The islands are made up of a numbe
Jan 1, 1990
-
Thernodynamic Properties and Phase Diagram of the Copper-Lead BinaryAlloy SystemABSTRACTFor the binary system copper-lead two relationsEquation 1andEquation 2have been derived for the activities of copper and lead at compositions and absolute temperatures within the liquid region
Jan 1, 1971
-
Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons LearntBy M Weeks
Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen
Mar 8, 2011
-
Iron Sinter Process Control Using X-ray DiffractionBy U König, N Norberg
Traditionally, quality control of iron sinter has relied on time-consuming wet chemistry. However, the mineralogical composition that defines the physical properties, such as strength or reducibility,
Jul 13, 2015
-
Study on Paste Tailings Capping Ecology Reclamation on Acid Mine Waste Rock DumpBy Z Lianbi, Z Yibin, Z Youhong, P Bin
Without adequate soil available, it is difficult to rehabilitate a large area of acid mine waste dump with sustainable plant communities, which has a strong potential acid generation. In the present p
Jul 10, 2012
-
The Association Of Tourmaline-Bearing Rocks With Mineralisation At Broken Hill, NSWTourmaline-bearing rocks are a rare rock type of Suites 3, 4 and 5 at Broken Hill. Minor laminated plagioclase-quartz-tourmaline rocks occur in association with the quartz- magnetite rocks of Suite
Jan 1, 1983
-
Effects of Shear on the Behaviour of Polymer-treated SlurriesBy D Reid, A Fourie
The in-pipe treatment of slurries with polymer addition shortly prior to deposition is a noteworthy emerging technology of increasing popularity. Although polymer treatment has been shown to substanti
Jul 27, 2015
-
Monitoring Rock-Support Interaction Around TunnelsBy Thompson AG, Cadby GW
The New Austrian Tunnelling Method (NATM) is a proven concept for the safe and economic construction of underground facilities. This is especially true for tunnelling activity where changing groun