  • AUSIMM
    Experience with Stress Control Methods as a Planning Tool Elouera Colliery

    By Quinn P, Huuskes W

    Continued extraction of the No. 3 Seam at Elouera Colliery required the driveage of a sequence of roadways within an area of significantly elevated horizontal stress. Initial roof conditions varied fr

    Jan 1, 1998

  • AUSIMM
    The Use of a Large-strain Drying and Consolidation Model to Optimise Multilift Tailing Deposits

    By P J. Vardon, L A. van Paassen, Y Yao, A F. van Tol

    Thin-lift atmospheric fine drying (AFD) is a technique used to dewater mine and oil sand tailings, which utilises both self-weight consolidation and atmospheric evaporation. The disposed layers underg

    Jul 27, 2015

  • AUSIMM
    Continuous Monitoring Techniques for Environmental Control of Waste Water Discharge at Northern Territory Mine Sites

    By Mine F. J, Woods P. H

    The Top End of the Northern Territory lies in the monsoonal zone and receives rain during the November-April period. Initially, at the start of the wet season, rain storms are localised, but, follow

    Jan 1, 1994

  • AUSIMM
    Designing and Operating Backfill Systems on a South African Gold Mine

    For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,

    Jan 1, 1998

  • AUSIMM
    Stakeholder Engagement and Social Sustainability in the Mining Sector

    By H Tran

    Local communities are undertaking an increased role in mine project decision making processes, associated with growing pressure and expectations from regulators, financiers and the general public. Thi

    Jan 1, 2009

  • AUSIMM
    Intersection reinforcement with self-drilling anchors for improved productivity at Kanmantoo

    By J Jardine

    An improved ground support method for development intersections, wide spans and stope brows was implemented at Kanmantoo mine. The method uses a jumbo to simultaneously drill and install self-drilling

    Mar 29, 2023

  • AUSIMM
    Mill Operators’ conferences – a 40-year retrospective and a vision for the future

    By P D. Munro

    On the occasion of the 14th Mill Operators’ Conference and marking 40 years since the first one was held in Mount Isa in 1978, it is fitting to review the history of the Conference and its development

    Aug 29, 2018

  • AUSIMM
    Continuity Risk in Narrow Reef Gold Deposits - Implications for Evaluation and Exploitation

    By I M. Platten

    Narrow reef gold deposits are generally less than 4 m in width and relatively complex geological phenomena. They often display variable geometry, attitude, continuity and internal architecture. Econom

    Jan 1, 2008

  • AUSIMM
    Notes on Ore Dressing Practive at North Broken Hill Limited

    CONTENTSIntroduction.Ore Bodies.Variations in Ore Dressing Practices.Stage I .Gravity Concentration for the production of a Lead Concentrate. 1909-1918.Stage Il Gravity plus Flotation Treatment for th

    Jan 1, 1948

  • AUSIMM
    Case Studies Demonstrating Value from Geometallurgy Initiatives

    By A R. Bye

    The mining industry is facing some key challenges that provide a compelling case for geometallurgy initiatives. Over the last 30 years, the average grade of Australian orebodies being mined has halved

    Sep 5, 2011

  • AUSIMM
    Measurement of Blast-induced Pressure in Bench Blasting and Deciphering Explosive Performance through Rock Mass Response Analysis – A Methodology

    By A K. Raina, V M. S R Murthy

    Rock mass response in blasting is an important element to determine the performance of a blast along with its other outcomes. The near-field monitoring for rock mass response analysis is vital for det

    Aug 24, 2015

  • AUSIMM
    The Waterview Connection Project – Progress to Date

    By S Hanke, J Burden, P Spies

    The Waterview Connection will complete Auckland’s long-planned Western Ring Route, a 48 km north-south motorway alternative to State Highway 1 that bypasses the central city to the west. The project i

    Sep 17, 2014

  • AUSIMM
    Real Option Value Optimisation

    By J Gould, T Elkington

    Mine operation strategies are commonly optimised with a net present value (NPV) maximisation objective. There are well known properties of a typical mining project optimised for NPV, including high pr

    May 24, 2012

  • AUSIMM
    Options for Incorporationg High-Pressure Grinding Rolls into Comminution Circuits

    By Weller KR

    A study of high pressure rolls grinding of a number of Australian ores and minerals has been carried out using a pilot-scale machine with rolls 300 mm diameter and 70 mm wide. The results from this

    Jan 1, 1991

  • AUSIMM
    Drilling and Blasting to Achieve Lower Costs for Deeper Stripping

    By Lemberg D. W, Friday R. G

    Potential means of lowering overall costs to permit deeper stripping include : 1. the use of larger diameter blastholes in highly-fissured strata (to reduce drilling costs); 2. dewatering from semi-

    Jan 1, 1981

  • AUSIMM
    A New Approach in Planning Gas Drainage Practices

    Both safety and productivity in underground gassy coal mines can be improved substantially if an appropriate gas management system is introduced. A strong direct relationship exists between the gas em

    Jan 1, 1998

  • AUSIMM
    Characterisation of In Situ Gold Particle Size and Distribution for Sampling Protocol Optimisation

    By I M. Platten, Y Xie

    Sampling protocols that are designed to suit the mineralisation style will result in a reduction of the nugget effect and hence resource risk. The a priori need for all sampling programs is the effect

    Jan 1, 2008

  • AUSIMM
    No entry mechanised presink of the Wira Hoisting Shaf

    By D Kilkenny

    This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min

    Mar 29, 2023

  • AUSIMM
    Recent Improvements to the Gravity Gold Circuit at Marvel Loch

    By A Bird

    Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme

    Aug 8, 2011

  • AUSIMM
    Reducing Crest Loss at Barrick Cowal Gold Mine

    By R Battison, R Duggan, S Esen, K Henley, P Dare-Bryan

    Increased catch bench crest loss has been observed in recent years at Barrick’s Cowal Gold Mine situated in central New South Wales, Australia. A project was initiated to diagnose the cause of the cre

    Aug 24, 2015