Search Documents

Search Again

Search Again

Sort by

  • CIM
    The New Sidbec-Dosco Six-Strand Billet Caster

    By H. W. Leon, F. J. Ellis

    "This paper covers the new six-strand curved-mould billet casting machine at the Contrecoeur Works of SidbecDosco. It commenced production of 3 Yz-in. square billets at the beginning of January 1972.

    Jan 1, 1973

  • SME
    Investigation on the use of Chemical Dust Suppressants on Ash Emissions Due to Fort McMurray Wildfire

    By W. V. Liu, D. Omane, H. Yu, Y. Pourrahimian

    "A large-scale wildfire had broken out at Fort McMurray in Alberta, Canada during May 2016. Many oil sands mining activities were affected due to the wildfire and the associated ash emissions. In part

    Jan 1, 2017

  • SME
    Optimization Of Grade Control Sampling Based On Conditional Simulation

    Conditional simulation provides a model of the ore body that represents variability in the data. This can be used to determine the impact of various grade control and mining strategies. A number of tr

    Jan 1, 1999

  • CIM
    Gowganda Silver Area: The Occurrence of its Veins and Ore-shoots; with Some Notes on Milling at the Castle-Trethewey Mines

    By Angus D. Campbell

    Introduction Gowganda forms part of the general Cobalt area. Its rocks and ores are very similar to those of the other parts of the area. While its total production of silver is only 4 per cent of

    Jan 1, 1930

  • TMS
    Improving Copper Smelting Process, Capacity, and Costs- The Answer is Outokumpu Flash Smelting

    By M. Jortikka

    The smelting process of the old reverberatory furnace including its capacity has been improved over the years in different ways eg. with oxy-fuel burners, parallel reactors with the reverb or with var

    Jan 1, 1994

  • CIM
    Economic Recovery of Uranium from Low-Grade Pulps via Resin-In-Pulp

    By D. Auerswald, M. Kotze, V. Yahorava, T. Udayar

    Uranium can be recovered from lower grade uranium ores (<800 mg/kg U3O8), leach residues, and waste dumps cost-effectively via resin-in-pulp (RIP). Using this technology, no solid/liquid separation or

    Jan 1, 2014

  • SME
    Geochemical Effects On The Hydrology Of In Situ Leach Mining Of Copper Oxide Ore At The Cyprus Casa Grande Mine, Arizona

    By Drummond Earley III

    The hydrology of in situ leach mining operations is being studied by the U.S. Bureau of Mines using a variety of techniques, and the Bureau has made significant advances in tracking and modeling the f

    Jan 1, 1992

  • NIOSH
    OFR-61-77 Preliminary Design Study Of Braking System For 10-Ton Coal Mine Rail Haulage Cars

    By Lee M. Manna

    Approximately 10,000, 10-Ton, 4 wheel, 2 truck, coal mine cars are in general service in U. S. Mines. None are equipped with an automatic braking system. Very few are equipped with hand or parking bra

    Jan 1, 1976

  • NIOSH
    IC 6134 Safeguarding Electrical Equipment Used In Gassy Mines European Practice: I - Great Britain ? Introduction

    By L. C. IlsLey

    Cooperation between the United States Bureau of Mines and the Safety in Mines Research Board of Great Britain, continuous since 1924, has made possible this and other papers on safety subjects. Gratef

    Jan 1, 1929

  • SME
    Mining in the Future: Mind Matters

    By M. Javier

    Mining is most vital to our civilization. The current model of extraction technologies was designed without an expiration date and therefore generates environmental effects that are severe. Mining res

    Jan 1, 2019

  • SME-ICGCM
    Barrier Pillar Design for Safe and Productive Longwall Mining

    By Stephen C. Tadolini

    Effective barrier pillar design is an essential component for safe and productive underground coal mining. Barrier pillar design methodologies that incorporate sound engineering judgment have been use

    Jan 1, 2013

  • IIMP
    Acuerdos de Impacto Beneficio: metodología para lograr licencia social para operar, experiencia en Canadá

    By Andrés Recalde

    Dado que el riesgo social se ha convertido en uno de los principales factores de éxito o fracaso para un proyecto minero, las familias, comunidades y gobiernos locales en la zona de influencia se cons

    Sep 30, 2017

  • NIOSH
    IC 7030R List Of Respiratory Protective Devices Approved By The Bureau Of Mines

    By H. H. Schrenk

    One phase of Bureau of lines work in health and safety is promotion of the use of safe, satisfactory, and reliable respiratory protective devices. To insure that devices embodying these features will

    Jan 1, 1941

  • SME
    Computer Evaluation Of Surface Mine Parting-Handling Methods

    By Thomas E. Finch

    Engineering mine design encompasses a range of situations, and each situation has its own range of detail and fineness. The most time consuming, and perhaps repetitive design situation involves evalua

    Jan 1, 1978

  • CIM
    Developments in Mine Hoist Design

    By J. M. Whatley

    "IntroductionIN UNDERGROUND mining operations, the mine hoist has become one of the most important and one of the most expensive single pieces of equipment. As the means of transporting men and materi

    Jan 1, 1953

  • SME
    New Improvements to MFIRE to Enhance Fire Modeling Capabilities (01bba2b5-efaa-4332-97d3-264d786a685e)

    By L. Yuan, A. Smith

    "NIOSH’s mine fire simulation program, MFIRE, is widely accepted as a standard for assessing and predicting the impact of a fire on the mine ventilation system and the spread of fire contaminants in c

    Jan 1, 2016

  • SME
    Dewatering Precipitate Copper In Plate And Frame Filter Presses

    By W. Joseph Schlitt

    The use of plate and frame filter presses for dewatering cement copper at Kennecott&apos; s Bingham Canyon precipitation plant is described. The dewatering process begins by periodically flushing a di

    Jan 1, 1977

  • CIM
    ISO Management Systems and the Mining Industry

    By Andrew Abraham

    Continual improvement is the key to success in today?s competitive global arena. You require tools that promote dynamic quality management, deliver cost savings to your bottom line and provide the fou

    May 1, 2003

  • CIM
    Compositional Block Kriging for Geometallurgical Optimization

    Adaptive processing is often related to the mineral composition of the mining block currently processed. The portions of waste, ore and secondary product minerals considered are always positive and ty

    Aug 1, 2013

  • CIM
    Roasting and Smelting Practice at the Thompson Plant of The International Nickel Company of Canada, Limited

    By J B. McConnell

    The Thompson smelter has three unique features which form the basis ~f its design: fluid bed roasters which treat nickel concentrate filter cake from the mill, as well as the flux, in order to achieve

    Jan 1, 1963