Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    A cost-effective tool to assess iron ore products and optimise their operations in blast furnaces towards decarbonisation – state-of-the-art CFD models

    By X Yu, Y Shen

    The iron ore products should be assessed in terms of in-furnace behaviour and overall furnace performance, their operation should also be optimised under industry-scale blast furnace (BF) conditions,

    Sep 18, 2023

  • ABM
    Simulação Matemática Do Escoamento Bifásico No Interior Do Modelo Físico Do Distribuidor De Lingotamento Contínuo

    By Larissa de Barros Machado Vilela

    O lingotamento contínuo é um processo de solidificação de aço líquido onde o conhecimento de suas variáveis é de extrema importância para a produção de aços de qualidade. Este processo contém um reato

    Aug 7, 2018

  • DFI
    Pullout Capacity of Pile Groups in Sand

    By S. P. Mukherjee, Smita Tung

    "Piles are generally subjected to uplift in case of under ground and water front structures. Sometimes piles are also to resist uplift loads in transmission towers, dry rock, and so on. Experimental i

    Jan 1, 2015

  • DFI
    Prescriptive Specification Design: The Impact on Cost and Constructability – Case History

    By Shawna Munn, Nadir Ansari, Allison Bennett

    "This paper outlines how specification driven design has made Toronto Area transit infrastructure projects more expensive than similar private projects, and provides a case study of the results of an

    Jan 1, 2017

  • DFI
    PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation Subcontractors

    By Alexander Filotti, Richard Kalson

    "1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti

    Jan 1, 2017

  • DFI
    Level Crossing Removal Project – Package 1

    By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong

    "The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin

    Jan 1, 1900

  • AIME
    Present Conditions In The California Oil-Fields

    By Mark L. Requa

    (San Francisco fleeting, October, 1911.) DURING the past two years California has developed a new and important oil-field : I refer to Midway. This field produced the famous Lake View gusher, which i

    Apr 1, 1912

  • AIME
    The One Hundred and Twenty-second Meeting of the Institute

    By AIME AIME

    THE 122d meeting of the Institute was held in the Lake. Superior Copper and Iron Country Aug. 20 to Sept. 3, 1920 with an approximate registration of 1100 members and guests. This is the 'first v

    Jan 1, 1920

  • DFI
    Full Scale Load Test Program Confirms the Design of a Rigid Inclusions Solution for the Support of an MSE Wall in Southern New Jersey

    By Susan Rafalko, Mike Walker, John Sankey, Sherif Aziz, Alex Potter-Weight, Mary Nodine, Frederic Masse

    "After several successful projects on the Garden State Parkway and New Jersey Turnpike for support of single-stage MSE (Mechanically Stabilized Earth) walls using rigid inclusions (Controlled Modulus

    Jan 1, 2015

  • ABM
    Effect Of Pre-quenching Process On Microstructure And Mechanical Properties Of Ultra-high Strength Dual Phase Steel*

    By Jianping Li, Fei Peng, Yunbo Xu, Jiayu Li

    In this study, in order to achieve ultra-high strength without reducing plasticity, a novel heat treatment involving a pre-quenching process prior to conventional intercritical annealing (P-IDP) was p

    Oct 1, 2019

  • ABM
    Fluxo De Líquido Num Molde De Beam Blank E A Remoção De Inclusões

    By Weslei Viana Gabriel

    Por meio do uso de técnicas de modelamento físico e matemático, caracterizou-se o fluxo de líquido, no interior de um molde de beam blank, quando alimentado por apenas uma válvula submersa constituída

    Oct 30, 2017

  • AUSIMM
    Accurate Underground Wireless Ranging and Tracking

    By M Hedley

    Tracking plant and personnel in underground environments provides multiple potential benefits for a mine including increasing safety, better monitoring of production, traffic control, and in the futur

    Mar 21, 2011

  • NIOSH
    RI 2449 Bureau of Mines Approval System as Applied to Permissible Storage-Battery Locomotives

    By H. B. Brunot, L. C. IlsLey

    The design , construction, inspection , and test for permissibility of a storage- battery locomotive outfit in accordance with the requirements of Schedule 15* represents a large amount of work, first

    Feb 1, 1923

  • NIOSH
    RI 6311 Use of a Sieve Bend and a Scalping Deck With a Vibrating Screen in Dewatering and Draining Dense Medium From Fine Coal

    By P. F. Sands, Michael Sokaski, M. R. Geer

    The purpose of this investigation was to determine the advantage of using either a conventional sieve bend ahead of a vibrating screen or of attaching a sieve - bend screen surface onto a vibrating sc

    Jan 1, 1963

  • NIOSH
    RI 6549 Metallic Binders for Zirconium Diboride Chromium Molybdenum and Tungsten

    By M. E. Tyrrell, C. W. Houck

    Mixtures of zirconium diboride and refractory metals of group VI were resistance sintered to high - density compacts using modified electric welding equipment . To evaluate the use of chromium , molyb

    Jan 1, 1964

  • NIOSH
    RI 6411 Magnetization Delay in the Separation of Minerals

    By Foster Fraas

    The response of minerals in magnetic separators is in accordance to dynamic rather than static magnetic susceptibility values . The dynamic value varies with respect to both passage speed through the

    Jan 1, 1964

  • DFI
    Seepage Barrier at Bolivar Dam

    By Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol

    "The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da

    Jan 1, 2016

  • DFI
    The Progress Of Jet Grouting In The Last 10 Years In Japanese Market

    By H. Yoshida

    Jet grouting was first introduced in Japan in the second half of the 1960s, approaching 50 years ago. By the end of the first 40 years, jet grouting from single to triple fluid systems had become a g

    Jan 1, 2010

  • SAIMM
    Isothermal titration calorimetry and density functional theory comparison study of xanthate, dithiophosphate and dithiocarbamate adsorption on pyrite surfaces M.G. Mulaudzi, J Taguta, B. McFadzean, and P.E. Ngoepe

    By J Taguta, B. McFadzean, P. E. Ngoepe, M. G. Mulaudzi

    Computational modelling methods and isothermal titration calorimetry (ITC) were employed to investigate the interaction of a pyrite surface with thiol collectors. Modelling work was conducted in the p

    Jan 1, 2020

  • SAIMM
    Increased liberation and flotation performance of bulk copper flotation concentrate following its regrinding in a stirred media mill, A. Stefanov, K. Grossman, V. Stoilov, A. Angelov, U. Peuker, and S. Gaydardzhiev

    By A. Angelov, U. Peukerd, S. Gaydardzhieve, A. Stefanov, K. Grossman, V. Stoilov

    Flotation concentrate originating from the Asarel-Medet porphyry copper mining and processing complex in Bulgaria has been subjected to regrinding using a Ro-Star mill; the effects of which on the dow

    Jan 1, 2020