Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Criteria Of Hydrogen And Oxygen Potentials In Copper Melt For Making A Sound Casting Of Bar And Rod The Guide Of The Effective Use Of An Electrochemical Gas Monitoring SystemBy Norihiko Fukatsu
In order to use effectively the previously reported new sensing system for hydrogen and oxygen potentials in molten copper, the criteria of the potentials for getting sound castings have been determin
Jan 1, 2003
-
Progress And Problems In The Modeling Of Non-Ferrous Processes (Keynote)By Arthur E. Morris
Fifty years ago when Professor Yazawa began his career, the field of process simulation and modeling was in its infancy. Since then, tremendous progress has been made in our ability to model metal pro
Jan 1, 2003
-
The use of mixed integer linear programming for long-term scheduling in block caving minesBy G. van Hout, D. Rahal
Caving is a mass mining method that is normally applied to large, low grade orebodies because of its low production cost and high capacity. However, equipment breakdown and poor draw management can ca
Jan 1, 2003
-
Thermodynamics Of Removal Of Tramp Elements From Steel Scrap (Invited) (3246c56f-15a2-4991-ab8f-2582a9a94692)By Fumitaka Tsukihashi
Increasing amounts of steel scrap are being used as resources for steelmaking. Therefore. there has been a growing interest in the removal of handful tramp elements such as antimony, zinc, tin, arseni
Jan 1, 2003
-
The DE Wet Process for the Beneficiation of Zircon: Optimization of the Alkali Fusion StepBy Z. Kwela, A. Manhique, W. W. Focke, W. van der Merwe
"The main features of the de Wet improved alkali fusion process for the manufacture of AZST are: Fewer process are steps necessary; radioactivity is removed by leaching rather than by precipitation; f
Jan 1, 2003
-
The Valuation of Advanced Mining Projects & Opera Ting Mines: Market Comparable ApproachesBy Craig Roberts
"While various methods are available to estimate a mining project's value, value is only established through a transaction. Comparable methods allow the value estimated for a mining project to be benc
Jan 1, 2003
-
Some Questions Of The AUV Control In Surveying The SeamountsBy Mikhail D. Ageev
The paper concerns with some questions of Autonomous Underwater Vehicle (AUV) control system design, which allows a motion at rough undersea terrain. The AUV advantages reveal itself completely du
Jan 1, 2003
-
Virtual reality in improving mining ergonomicsBy P. Foster, A. Burton
Over the past decade there has been a great deal of research into the use of virtual reality (VR) and computer graphics in the mining industry. Much of this has led to developed applications including
Jan 1, 2003
-
A Rapid and Cost-Effective Method for Bench Screening of Geochemical Performance and Disposal Options for High-Sulfide TailingsBy M Logsdon, B Johnson, M Fordham
The underground Neves Corvo copper-tin mine in southern Portugal currently disposes of its tailings in a ætraditionalÆ wet tailings impoundment. With the development of new technologies for preparatio
Jan 1, 2003
-
Original Industrial Application Of Two Numerical Models In Concasting TechnologyBy Jan Dabrovska
Solidification and cooling of a continuously cast slab and simultaneous heating of a mould is a very complicated problem of transient heat and mass transfer. Nowadays, the solving of such a problem is
Jan 1, 2003
-
Effect Of Oxygen Enrichment On The Teniente Converter Productivity At The Ilo Smelter, Perú (67cdbd7e-3ac1-487c-b272-f30642fb3d30)By Jose Bengoa
Low metal prices and environmental restrictions are always a challenge for copper smelters operation and its productivity. Thus, in order to reduce production costs and control gas emissions, improvem
Jan 1, 2003
-
Solute Interactions With Dissolved Oxygen In Molten Copper Systems (Keynote)By Ragnhild Aune
In fire refining of copper, the affinities of various impurity elements on dissolved oxygen is of great significance. Further, in the design of oxygen probes in liquid copper, the influence of solute
Jan 1, 2003
-
Iron Removal of Yaliköy Sand Dunes (10886b65-8653-411d-a43d-c1682f2c69e7)By Güven Önal, Zeki Dogan, Neset Acarkan
In this study, it was aimed to produce glass sand with less than 0.15% Fe2O3 for window glass manufacture and glass ware grade with less than 0.05% Fe2O3 from Yalõköy sand dunes having 0.48% Fe2O3. In
Jan 1, 2003
-
The “Mill Redesign Project” at INCO’s Clarabelle Mill (54ceb038-1593-4f87-9a10-6e2a572d48df)By Jim Truskoski, Alain Bouchard, Andy Kerr, Germain Labonté, Jim Barrett
"Improving mill grade recovery relationships is always good business. INCO’s Clarabelle Mill has just undergone a $16 million process upgrade that was designed to improve nickel recovery by 2%. The “M
Jan 1, 2003
-
Thermodynamic Studies Of The Gold(III)/(I)/(0) Redox System In Ammonia-Thiosulphate Solutions At 25°cThe reported values of the standard reduction potentials of the Au(NH3)2+/Au(0) and Au(S2O3)23-/Au(0) couples are reviewed to emphasise the experimental difficulties associated with the measurement of
Jan 1, 2003
-
Installation Of Arsenic Removal In The Hematite ProcessBy H. Masuda
The lijima Zinc Refinery started operation in 1972, and has today an annual capacity of 200,000t-Zn. The hematite process was employed for the first time and the ideal of waste-free refinery has been
Jan 1, 2003
-
Effect Of P2O5 Or Na2O Addition On The Reaction Rate Of CO2 Dissociation With FexO Containing Molten OxidesBy Hiroyuki Matsuura
The effects of P20S or Na20 addition on the reaction rate of CO2 dissociation on the surface of FexO-base molten oxides was investigated at 1773K by isotope exchange methodl-6_ The rate constant decre
Jan 1, 2003
-
Modeling Of Transport And Chemical Rate Phenomena In Flash Combustion Of Municipal Solid Wastes (Invited) (8636b2e5-c481-4a4c-b7b7-31177f88aaa3)By Nickolas J. Themelis
Nearly thirty two million tons of municipal solid wastes (MSW) are combusted annually in over one hundred U.S. Waste-to-Energy (WTE) power plants, thus reducing the use of fuel oil by about 1.6 billio
Jan 1, 2003
-
Solar Thermal Extraction Of Copper From SulfidesBy Lenny Winkel
With the aim to develop a solar-driven process for the extraction of copper from sulfide concentrates research on the decomposition of copper sulfides under inert atmospheres has been initiated. Therm
Jan 1, 2003
-
Modeling And Control Of Dioxin Formation During Iron Ore SinteringBy Pengfu Tan
In order to understand and control the formation of dioxins and furans in iron ore sinter plants and to possibly avoid expensive end-of-pipe removal stages, thermodynamic calculations on the stability
Jan 1, 2003