Construction of Coxwell Bypass Tunnel Project in Toronto, ON - RETC2023By Ehsan Alavi, Eren Kusdogan
The City of Toronto’s Coxwell Bypass Tunnel is currently being constructed by North Tunnel Constructors ULC, a joint venture of Jay Dee Canada, C&M McNally Tunnel Constructors and Michels Canada. This
Jun 13, 2023
-
Design Aspects of the Minneapolis Central City Parallel Tunnel - RETC2023By Randall C. Divito, Craig R. Eckdahl, Bruce D. Wagener, Joseph Klejwa
The existing Central City Tunnel was built primarily in the 1930s with a small portion as old as the 1880s. It conveys stormwater in downtown Minneapolis. It is a 4,400-ft long tunnel located 80 feet
Jun 13, 2023
-
Gateway Program—Cut and Cover Tunnels in Manhattan - RETC2023By Drew Bazil, David Smith, Matteo Ferrucci, David Pittman
The Gateway program will provide additional rail capacity between New Jersey and Manhattan. This paper describes how a 70-foot-deep section of cut and cover tunnel was designed to directly support fut
Jun 13, 2023
-
Planning for State-of-Good Repair, Hazard Mitigation, and Resiliency for San Diego County Water Authority’s 2nd Aqueduct Water Supply Infrastructure - RETC2023By Paul Taurasi, Mahmood Khwaja, Anjuli Corcovelos, William Brick
California’s San Diego County Water Authority provides a safe and reliable water supply to more than 3.3 million residents through twenty-four member agencies. The 2nd Aqueduct pipelines, a critical i
Jun 13, 2023
-
Using GIS Application for Inlet/Outlet Tunnel Geologic Mapping for Ground Support (CH Reservoir Case Study) - RETC2023By Cory Bolen, Nadav Bar-Yaakov, Eric Zimmerman, Gregory Raines
The Chimney Hollow Reservoir Project broke ground in August 2021, constructing the tallest Asphalt Core Dam in North America, intending to improve reliability of drinking water supply to Northern Colo
Jun 13, 2023
-
Wireless Optical Displacement Sensor for Convergence and Divergence Monitoring - RETC2023By Raphael Victor
The construction and modification of tunnels brings a requirement for precise measurement of convergence and divergence to safeguard the structure, maintain safety and provide the assurance needed to
Jun 13, 2023
-
Acclimatization: Adapting Conventional Tunnel Lining Techniques to Overstress Rock Conditions - RETC2023By Ross Goodman, Jean-Luc des Rivières
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges which, continuing to develop over time, hampered excavation completion and impacted the cast-in-place final lining
Jun 13, 2023
-
Steep TBM Challenge for the Limberg III Pump Storage Power Plant Project - RETC2023By Karin Bäppler
Hydropower produces almost two-thirds of the world’s renewable electricity generation and delivers a major contribution on the ambition of the Paris Agreement and Sustainable Development Goals (SDG) w
Jun 13, 2023
-
Qualifications and Design of Waterproofing Systems for Underground Structures - RETC2023By Enrico Pavese, Tim Kearney, Stefan Lemke
Watertightness is of central importance in hydraulic and underground structures but has always been associated with a risk, as demonstrated by the very high impact that water inflows have on the damag
Jun 13, 2023
-
Cohesive Soil Conditioning Practice for Earth Pressure Balance Tunneling - RETC2023By Diana Diaz, Rakshith Shetty, Vitaly Proschenko, Mike Mooney
Cohesive clay soil poses a significant risk to earth pressure balance tunnel boring machines (EPBM) due to unstable face pressure, clogging potential, high cutterhead torque, poor muck flow, low advan
Jun 13, 2023
-
Gravity Sewer Tunnel Liner Corrosion Protection—Part Two - RETC2023By Jon Y. Kaneshiro, Eric Dawson, Pooyan Asadollahi, Steven Hunt
This paper provides updates to the paper published by the lead author at RETC 2011 with a summary of developments in technologies, products, and approaches to corrosion analyses of gravity sewer tunne
Jun 13, 2023
-
Bad Bergzabern Bypass Tunnel—NATM Tunneling Through Vineyards - RETC2023By Ralf Plinninger, Pafos Busch, Richard Gradnik
This paper presents the details of the Bad Bergzabern tunnel project. This tunnel is the main part of the B427 federal road bypass, intended to improve the regional traffic infrastructure and to reduc
Jun 13, 2023
-
Second Narrows Water Supply Tunnel—Conventional Deep Shaft Excavation in Variable Weak Rock - RETC2023By J. Andrew McGlenn, Brian McInnes, Bruce Downing, Murray Gant
The Second Narrows Water Supply Tunnel crossing beneath Burrard Inlet is an important component of the Greater Vancouver Water District’s plans to increase seismic resilience and meet increasing water
Jun 13, 2023
-
Tunneling for High-Energy Physics in Menlo Park, CA - RETC2023By Irene Bendanillo, Canon Cheung, Justin Lianides, Derek Penrice
The SLAC National Accelerator Laboratory’s two-mile-long particle accelerator generates the world’s brightest X-rays from its Linac Coherent Light Source (LCLS) freeelectron laser. This facility has d
Jun 13, 2023
-
Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall
The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana
Jun 13, 2023
-
Large Diameter Shaft Excavation Support Design and Blasting Methods in a Dense Urban Environment for the Pawtucket Tunnel Project - RETC2023By Frederic Souche, Andrew R. Klaetsch, Brian Hann, Nick Goodenow
This paper describes support of excavation (SOE) design and construction for three large diameter shafts excavated through glacial soil and controlled blasting in complex sedimentary rock formations.
Jun 13, 2023
-
Flood Resilience for San Francisco - RETC2023By Eva K. Fernandez, Paul Y. Louie, Derek S. Adams, Renée L. Fippin
The Folsom Area Stormwater Improvement Project is part of SFPUC’s flood resilience efforts under the Sewer System Improvement Program. This 4,000-foot-long, 12-footinside- diameter tunnel will help re
Jun 13, 2023
-
Submerged Penetrations Through a Frozen Soil Shoring System - RETC2023By Kyle Amoroso, Aaron K. McCain
Frozen soil shoring has been used for decades in the tunneling industry to provide temporary support of excavation for shafts and cross-passage excavations. However, horizontal penetrations through th
Jun 13, 2023
-
New Water Supply—Oslo - RETC2023By Ingunn Opland, Silje M. Tinderholt
Drill and blast project in Norway’s capital. The contract consists of 7 rock caverns (350–950 m2), 9.2 km tunnels, and four shafts. With 110 blue-collar and 31 white-collar, the project produces an av
Jun 13, 2023
-
Innovative TBM Launching in Urban Areas - RETC2023By Fabrizio Fara
The Ship Canal Water Quality Project (SCWQP) includes a 2.7-mile long, 18'-10" internal diameter tunnel which is located inWest Seattle. Tunneling in urban areas and soft ground conditions (Till and T
Jun 13, 2023