Search Documents

Search Again

Search Again

Sort by

  • TMS
    One-Step Extraction of Lead from Spent Lead-Acid Battery Paste via Reductive Sulfur-Fixing Smelting: Thermodynamic Analysis

    By Motang Tang, Chaobo Tang, Shenghai Yang, Lulu Guo, Yun Li, Yongming Chen, Jing He

    A new innovative process for one-step and cleaner extraction of lead from spent lead-acid battery by reductive sulfur-fixing smelting was presented. This paper summarized and discussed several potenti

    Mar 1, 2017

  • AUSIMM
    Online Cyanide Analysers Optimise Cyanidation and Ensure Cyanide Code Compliance for Plant Tailings

    By D Kotzen

    Online cyanide analysers have been successfully used to control free cyanide in the gold/silver leach process for over 15 years. Use of such analysers leads to cyanide savings and improvement in recov

    Jan 1, 2007

  • CIM
    Online Elemental Analysis of Slurry Using Laser-Induced Breakdown Spectroscopy

    By Tano Balbin, Valery Astakhov, Juha Timperi, Lauri Koresaar

    "Online elemental analysis is the basis of optimal flotation control in mineral concentrator plants. Traditionally XRF analyzers have been used as the online analysis method. However, online XRF analy

    Jan 1, 2017

  • SME
    Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel Project

    By Stephen M. Smading

    The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b

    Jan 1, 2009

  • CIM
    Onsite Data Acquisition Using Low Cost Open Source Microcontroller

    By Magdy Ibrahim

    This paper presents experimental design and development of a low-cost remote sensing hardware designed to support automated site data acquisition for near real-time progress reporting of construction

    Aug 1, 2013

  • IMPC
    Open access modeling tools for comminution processes

    By Jaime Sepúlveda

    "A broad diversity of critical operating conditions may influence, in very convoluted ways, the actual performance of any given mineral processing system, to the extent that it becomes nearly impossib

    Jan 1, 2014

  • CIM
    Open Access to Metallurgical Publications

    By R. T. Jones

    "Technical publications in the field of mining and metallurgy have existed for a long time. Recent developments in electronic publishing on websites make it possible to disseminate information more wi

    Jan 1, 2012

  • SAIMM
    Open Access To Metallurgical Publications - Synopsis

    By R. T. Jones

    Technical publications in the field of mining and metallurgy have existed for a long time. Recent developments in electronic publishing on websites make it possible to disseminate information more wid

    Jan 1, 2012

  • ISEE
    Open Face Design Optimization

    By Owen Collins

    In surface mining, designing patterns to reduce the probability of flyrock and optimizing fragmentation through powder factor calculations are important for safe, efficient blasts. The designed powder

    Jan 26, 2026

  • AUSIMM
    Open Issues in Tunnel Boring Machine Excavation of Deep Tunnels

    By G Barla

    In Europe, a major interest in the infrastructure and tunnelling fields is in the new crossings of Alps in the form of base tunnels, which are important components of the high-speed (for passengers)/h

    Mar 8, 2011

  • AIME
    Open Pit Forum - Truck Body Cleaning

    By C. A. LINDBERG

    Several new methods have been developed on the Iron Range to remove the material adhering to truck bodies in freezing weather. A machine known as a Gradall, incorporating the features of digging both

    Jan 1, 1949

  • CIM
    Open Pit Mind Dewatering- Knob Lake

    The purpose of this paper is to present the methods used in ground water control and the considerations that affected the development of these techniques. Production at Knob Lake is currently proceedi

    Jan 1, 1965

  • CIM
    Open Pit Mine Dewatering= Knob Lake

    The purpose of this paper is to present the methods used in ground water control and the considerations that affected the development of these techniques. Production at Knob Lake is currently proceedi

    Jan 1, 1965

  • AUSIMM
    Open Pit Strategic Mine Planning with Automatic Phase Generation

    By M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague

    A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope

    Nov 24, 2014

  • SME
    Open Pit TBM Driven Drainage Tunnel?Ok Tedi Mine

    By Tony Peach

    Project Description The Ok Tedi Mine is located approximately 18 km east of the Papua and New Guinea-Indonesia border, on the southernmost extremity of the Star Mountains Range, it is situated almost

  • AIME
    Open Stope - Mining Methods at Cornucopia, Oregon

    By Robert M. Betts

    The Cornucopia district is situated in northeastern Oregon 25 miles from the Snake River branch of the Oregon Short Line R.R. and 75 miles northeast of Baker City, in the Wallowa Mountains. The for

    Jan 1, 1925

  • SME
    Open-Air Sprays for Capturing and Controlling Airborne Float Coal Dust on Longwall Faces (045123de-356a-4cdc-8bb8-804d526a0d95)

    By M. R. Shahan, C. E. Seaman, Mischler S. E., T. W. Beck

    "Float dust deposits in coal mine return airways pose a risk in the event of a methane ignition. Controlling airborne dust prior to deposition in the return would make current rock dusting practices m

    Jan 1, 2018

  • NIOSH
    Open-Cut Metal Mining - Introduction

    By E. D. Gardner

    This bulletin, which discusses open-cut mining at the metal mines of the United States, is the last of a series of such papers by the Bureau of Mines describing the principal methods of mining.4 Open

    Jan 1, 1941

  • AIME
    Open-Pit Forum ? Range Mechanization Progresses

    By JOHN S. HEARDING

    ON the Minnesota Ranges, 600 million tons of material have been moved in the past three years to produce 172 million tons of direct-shipping iron ore. Increasing wage rates and cost of equipment and s

    Jan 1, 1949

  • CIM
    Open-Pit Planning at the Adams Mine

    By F. J. West

    This paper deals with Jones & Laughlin Steel Corporation's new Adams mine, near Kirkland Lake, Ontario. After a brief discussion of ore structure, type, reserve tonnages, etc., the main body of the pa

    Jan 1, 1966