OFR-146(1)-82 Sprayfan System - Installation And Operation Manual - Volume IIBy Steven K. Ruggieri
This report describes the use of the sprayfan auxiliary ventilation system for methane and dust control on continuous miner sections to potential users. The sprayfan auxiliary ventilation system is a
Jan 1, 1981
-
OFR-146(2)-77 Comparative Coal Transportation Costs: An Economic And Engineering Analysis Of Truck, Belt, Rail, Barge And Coal Slurry And Pneumatic Pipelines - Volume 2 ? Unit Trains ? 2.1 IntroductionBy Michael Rieber
The increase in f.o.b. mine prices of coal from $5/ton to over $18/ton in five years [1] has increased the significance of transportation costs. Coals produced in the vicinity of the consumer bear a m
Jan 1, 1977
-
OFR-146(3)-77 Comparative Coal Transportation Costs: An Economic And Engineering Analysis Of Truck, Belt, Rail, Barge And Coal Slurry And Pneumatic Pipelines ? Volume 3 ? Coal Slurry Pipelines ? 3.1 IntroductionBy Michael Rieber
An analysis of coal slurry pipelines was presented in our May 1976 study, Route Specific Cost Comparisons: Unit Trains, Coal Slurry Pipelines and Extra High Voltage Transmission (4]. The present study
Jan 1, 1977
-
OFR-146(5)-77 Comparative Coal Transportation Costs: An Economic And Engineering Analysis Of Truck, Belt, Rail, Barge And Coal Slurry And Pneumatic Pipelines - Volume 5 ? Conveyor Belts ? 5.1 IntroductionBy Michael Rieber
In this study a generalized specification and costing model for high tonnage coal carrying conveyor belts of 3.5 to 100 miles is presented. These belt systems, in modular units or flights, of up to 9
Jan 1, 1977
-
OFR-146-80 Environmental Effects Of Slaking Of Surface Mine Spoils Eastern & Central United StatesBy D. E. Andrews
The objective of this study was to investigate the environmental effects of slaking of surface mine spoils. To accomplish this, both field and laboratory programs were undertaken, supplemented by a th
Jan 1, 1980
-
OFR-146-81 Massive Sulfide Tailing Disposal Using The Thickened Discharge Method - 1.1.0 The Crandon Ore Body - Introduction - 1.1.1 DiscoveryBy Gerald M. Bandholz
Exxon Minerals Company, a division of Exxon Corporation, has been exploring for base metal deposits in the Precambrian volcanic rocks in northern Wisconsin since 1970. Aerial electromagnetic surveys o
Jan 1, 1981
-
OFR-147-81 Technological Investigation To Develop Design Criteria For The Optimum Size Of Oil And Gas Well Blocks ? Phase IIIBy Kenneth Wardell
Criteria have been fully developed for determining the optimum size of oil and gas well blocks. The criteria lead to the formation of well barrier pillars which are, of themselves, inherently stable a
Jan 1, 1980
-
OFR-147-84 Front-End Loader Training SystemBy Jane Applegate
This report documents efforts to design, develop and test a training approach which would assist front-end loader operators in the acquisition of skills and awareness to reduce the probability of thei
Jan 1, 1983
-
OFR-149-81 Development Of An Explosion Proof High Voltage Cable ConnectorBy H. E. Dresch
This report summarizes the work accomplished under Bureau of Mines contract H0188068. The contract required design and construction of a high voltage (7.5 KV) explosion proof cable connector for use o
Jan 1, 1981
-
OFR-14A-87 Research Study To Determine The Applicability Of New Methodologies In Mine Accident InvestigationsBy Louis Schaffer
The purposes of the research were to assess the applicability of new accident investigation methods to mining accidents, and to adapt those found to be applicable in the development of a new methodolo
Jan 1, 1986
-
OFR-15(1)-82 Area Terrace Pit Coal Mining Systems - Volume 1 - Technical & Economic Evaluation Of Terrace Pit Mining SystemsBy Fred Leonard
This report is principally concerned with the engineering and economic feasibility of area surface coal mining systems other than draglines. This analysis evaluates shovel/ trucks, shovel/crusher/conv
Jan 1, 1980
-
OFR-15(2)-82 Area Terrace Pit Coal Mining Systems - Volume 2 - AppendicesBy Fred Leonard
This report is principally concerned with the engineering and economic feasibility of area surface coal mining systems other than draglines. This analysis evaluates shovel/ trucks, shovel/crusher/conv
Jan 1, 1980
-
OFR-15-72 Solid Sap - A Static Analysis Program For Three Dimensional Solid StructuresBy Edward L. Wilson
A general computer program is given for the linear elastic static analysis of complex structural systems. These elements have special advantages for the analysis of massive underground structures such
Jan 1, 1971
-
OFR-15-74 Standardization Of Controls For Underground Electric Face Equipment - Section 1. Introduction - BackgroundBy William G. Hedling
The operation of electric face equipment in underground coal mines has proven to be extremely hazardous to mining personnel, including equipment operators and others working in the vicinity of active
Jan 1, 1974
-
OFR-15-75 The Application Of Polymers For Rock Bonding And Reinforcement Of Coal Mine Structures ? 1. IntroductionBy R. A. V. Raff
Although falls of roof, face and rib (or side) of coal mines were the third ranking cause of disabling accidents in 1966, the accidents from these falls resulted in the most serious injuries and accou
Jan 1, 1973
-
OFR-15-76 Study Of Mine Fire Fighting Using Inert Gases - SummaryBy Rudolf E. Greuer
This report contains a theoretical study on the usefulness of fighting mine fires with inert gases. Four introductory chapters review the role of fires in the mining industry; the conventional fir
Jan 1, 2012
-
OFR-15-77 Design Modification Of Femco Model 702909 Wireless Ground MonitorBy Leonard P. Vitt
This report details the work done to provide the U.S. Bureau of Mines with a customized Wireless Ground Monitor Wireless Ground Monitor was modified as follows: 1. A voltage regulator was added to
Jan 1, 1976
-
OFR-15-80 Technical And Economic Evaluation Of Underground Disposal Of Coal Mining WastesBy M. F. Bucek
This report summarizes the activities performed and the results achieved during a two-phased investigation of the technical and economic feasibility of disposing of coal mine refuse underground in act
Jan 1, 1980
-
OFR-150-81 Demonstration Of A Dust Control System For Boom-Type RoadheadersBy Mackenzie Burnett
This program was initiated by USBM to quantify the respirable dust problem caused by the use .of roadheaders in underground metal/nonmetal mines with special emphasis on this problem in uranium mines.
Jan 1, 1981
-
OFR-151-77 The Physical And Chemical Characteristics Of Available Materials For Filling Subsurface Coal MinesBy James R. Dunn
Samples were taken of industrial mineral waste materials which are potentially capable of being used for filling underground coal mines for subsidence control in the Pittsburgh and the Scranton-Wilkes
Jan 1, 1977