Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-129-85 Refinement And Evaluation Of Basic Longwall Dust Control TechniquesBy J. A. Kost
The contract objective was to evaluate the effectiveness of available dust-control technology for double-drum shearers. Eight underground surveys were conducted to evaluate drum design, drum spray noz
Jan 1, 1985
-
OFR-13-70 Advisory Conference On Tunnelling - IntroductionBy Thomas E. Howard
Man has been engaged in the construction of tunnels in. rock for several thousand years. During that time, methods of tunneling have changed drastically. Hordes of men chipping away at the tunnel face
Jan 1, 1970
-
OFR-13-74 Solutions To Problems Of Pollution Associated With Mining In Northern IdahoBy Dale R. Ralston
This investigation was divided into two major phases. Phase I of the study was an examination of the occurrence and production of acid water within the Bunker Hill Mine in northern Idaho. The second p
Jan 1, 1973
-
OFR-13-76 Development Of A Fluorescent Cap Lamp System ? 1.0 IntroductionPrier to the date of this contract, Ocean Energy had developed and demonstrated a high efficiency fluorescent caplamp which operated from a standard 4 volt miner's caplamp battery. This unit prod
Jan 1, 1975
-
OFR-13-82 Engineering Property Changes And Environmental Effects On Coal Mines Wastes Due To SlakingFresh coal refuse was sampled at 21 US mines. Five of the sites were drilled, sampled and tested more extensively. Field tests included Standard Penetration tests, and in-situ density determinations.
Jan 1, 1981
-
OFR-13-86 Development Of Environmentally Attractive Leachants Volume IV, A Minitest Of An In-Situ Uranium Leach SolutionBy Robert S. Schechter
A minitest of the new potassium chloride-potassium carbonate two-stage in-situ uranium leach process has been carried out at the Intercontinental Energy Corporation (IEC) Zamzow project site in South
Jan 1, 1985
-
OFR-13-87 Demonstration Of Minos Coal Clearance System - Final Report: Installation, Operation And Assessment Of Results Of The MINOS System At Barnes & Tucker No 20 MineBy G. S. Beaumont
This report presents a programme of work to demonstrate the use of a surface-based centralised computer control system for the remote monitoring and control of underground conveyors in a US coal mine.
Jan 1, 1986
-
OFR-130(2)-85 High Reliability Miner Hydraulic System - Volume I - Part II - Section III - G Valves - IntroductionOperator efficiency and control capability along with cost effectiveness have been the quest of mining, industrial, and mobile hydraulic engineers for years. The majority of the functions in present d
Jan 1, 1983
-
OFR-130(3)-85 High Reliability Miner Hydraulic System - Volume II -Mining Hydraulics Manual ? 1. Introduction ? 1.1 GeneralHydraulic fluid power systems are advantageous whenever power output must be accurately and safely controlled. The load movers, cylinders, jacks, rotary actuators and hydraulic actuators in these syst
Jan 1, 1982
-
OFR-131-76 Feasibility Of Using Large Tractor Dozers In The Surface Mining Of Coal And The Reclamation Of Mined Areas ? SummaryThis study was conducted to determine the feasibility of using large tractor dozers in land reclamation of strip-mined areas. The procedures used are patterned after engineering models developed for e
Jan 1, 1975
-
OFR-131-81 The Implementation Of UHF Radio Communications And CCTV Monitoring Systems In A Room And Pillar Metal/Non-Metal Mine Final ReportBy R. A. Isberg
This report describes the design and implementation of UHF radio and closed-circuit television systems in the Black River room and pillar limestone mine near Butler, Pendleton County, Kentucky. Prior
Jan 1, 1981
-
OFR-132-85 A Borehole Probe For In-Situ Neutron Activation AnalysisBy J. A. Baicker
A prototype borehole probe for ore grade determinations by means of in-situ neutron activation analysis was designed, built, and tested in a two-phase program. Phase I dealt with the design and fabric
Jan 1, 1984
-
OFR-133(1)-81 Free Fall Testing Of Single Tooth Safety Dogs On Keruing Guides ? Vol. IBy F. A. Penning
A number of highly instrumented free fall tests were performed on an arrestment system for a man cage in a vertical shaft. Tests were conducted in the U.S. Bureau of Mines free fall test tower at the
Jan 1, 1980
-
OFR-133(2)-81 Study Energy Absorption Characteristics Of A Pit Bottom Buffer - Vol. IIBy F. A. Penning
An experimental and analytical investigation was conducted on a recoverable pit bottom buffer. Work was conducted at the Colorado School of Mines using the U.S. Bureau of Mine-s free fall test tower.
Jan 1, 1980
-
OFR-133-85 A Study Of Design And Development Of A Coal Injector For Coarse Slurry TransportBy Boyd Wise
A jet pump injector was developed and successfully tested, thereby demonstrating the feasibility of a jet injector for introducing coarse coal into an operating slurry face haulage system: In Phase I
Jan 1, 1985
-
OFR-133A(1)-77 Longwall-Caving Mining Method For Thick Coal - Design And Feasibility Study - Final Report, Volume IBy M. G. Wallis
This report presents the results of a study to develop a detailed mining method design based on longwall mining with sublevel caving. The method is applicable to low-dipping coal seams 20 or more feet
Jan 1, 1977
-
OFR-134-77 Development Of Emergency Escape Systems Guidelines For Underground Metal And Nonmetal MinesBy D. Randolph Berry
This report describes a study to develop a detailed set of guidelines and equipment recommendations to be used as a guide for mine operators, mine inspectors, and equipment manufacturers in implementi
Jan 1, 1976
-
OFR-134-78 Electromagnetic Guided Waves In Mine Environments - Proceedings Of A WorkshopA unity of viewpoint emerged from the workshop. The concept that transmission is via characteristic modes was a common theme in many of the presentations. Also, the confusion an the meaning of monofil
Jan 1, 1978
-
OFR-134-80 Electrical Practices In Metal/Non-Metal Mines And Mills - Mine Power Systems, Mill Power Systems, Federal Regulations, Electrical AccidentsBy David Bendersky
The principal objectives of this study are to: (1) survey electrical practices in metal and non-metal mines, (2) survey electrical practices in metal and non-metal mills, (3) clarify the federal regul
Jan 1, 1980
-
OFR-134-81 Outcrop Barrier Design Guidelines For Appalachian Coal MinesBy Mary L. Pearson
Ibis report summarizes the results of the contract. Included are summaries of existing legislation pertaining to outcrop barriers and a state-of-the-art survey of outcrop barrier designs and related,
Jan 1, 1981