Search Documents

Search Again

Search Again

Sort by

  • CIM
    Mathematical modelling of oxidative leaching of nickel concentrate magnetic fraction

    By M. I. Kalashnikova, Y. M. Shneerson, E. E. Zhmarin, Y. V. Degtiarev, E. M. Vigdorchik

    Separation of a magnetic fraction from nickel concentrate following matte flotation, and its treatment in a separate circuit enable reduces precious metals losses. The magnetic fraction is treated in

    Jan 1, 2005

  • TMS
    Mathematical Modelling of the Smelting Reduction of Iron: The Effect of Properties of Raw Materials and Blast Injection

    By Vladimir Panjkovic, Ostrovski. Oieg, Campbell Cripps Clark, John Truelove

    "Effects of properties of raw materials and blast on the performance of an iron bath reactor have been examined by a mathematical model. The model consists of three modules: 1) chemical reactions in t

    Jan 1, 1996

  • TMS
    Mathematical Simulation of Fluid Flow in Gas-Stirred Liquid Systems

    By Shoji Taniguchi, Lifeng Zhang, Kaike Cai

    "In the present paper, based on the two-phase (Eulerian-Eulerian) model, the 3D fluid flows in gas-stirred systems, i.e., air-stirred water vessel and argon-stirred liquid steel ladle, are simulated.

    Jan 1, 2000

  • ABM
    Mathematical Simulation Of The Slag Contamination In A Continuos Casting Tundish

    By Saul Garcia Hernandez

    The research work objective is to study a new ladle shroud internal design to reduce the slag emulsification in the tundish during ladle transient periods. A 3D mathematical model of the tundish was c

    Aug 17, 2017

  • AUSIMM
    Mathematical Simulation of Thermal Processes in Underground Workings of Mines Located in the Cryolitic Zone

    By A S. Kurilko

    For mines located in the cryolitic zone, thermal conditions are an important factor for all kinds of mining works, especially for ventilation of workings. In the present paper, some models of mine air

    Jan 1, 2005

  • CIM
    Mathematics Model and Programming Realization of the Varying-Rate Gas Drainage Process for a Sealed Lane

    By H. G. Wang

    The production process of a coal mine can often be interrupted by all kinds of events scheduled or unscheduled and thus often needs gas drainage for a temporary or long-term sealed area. Gas drainage

    Aug 1, 2013

  • CIM
    Mattagami River Refractory Clays

    By A. E. Hilder

    Introductory The following pages present the results of field investigations, laboratory and commercial tests, drilling, surveying, and preliminary development of the refractory clays which have been

    Jan 1, 1935

  • AUSIMM
    Matte Fuming of Tin from Sulfide Concentrates Containing Tin and Copper

    Recovery of tin and copper from concen trates containing cassiterite, stannite and chalcopyrite was studied in laboratory-scale tests designed to simulate continuous operation of the matte fuming p

    Jan 1, 1980

  • AUSIMM
    Maximising asset value through optimal block by block decisions on marginal material

    By F Phillips, E Deucker, J Kato

    It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari

    Mar 15, 2021

  • AUSIMM
    Maximising Payable Gold in Base Metal

    Breakwater Resources Ltd is a Canadian base metals producer with Cu-Pb-Zn operations in Canada, Honduras, and Chile. Two of its operations contain economical gold levels which are recovered in both gr

    Aug 1, 2010

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine using Cement Stabilisation

    By P R. Lock

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 km north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦ eas

    Jan 1, 1998

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine Using Cement Stabilisation (484a6aa7-9c11-440d-b7e3-51e52370c111)

    By Lock PR

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 kin north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦

    Jan 1, 1998

  • IMPC
    Maximising The Value of a Wealth of Information

    By Rob Morrison, Andrew Scott

    "Long before a modern mine commences operations it has already become a wealth of information. After start up, it can generate enormous quantities of data - especially with semi-automated data acquisi

    Jan 1, 2003

  • AUSIMM
    Maximising Value Through Maintaining Your Flotation Equipment

    By B Murphy, S O’Connell, J L. Heath

    In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat

    Sep 1, 2014

  • SME
    Maximization of Productivity Of Autonomous Equipment in Underground Mines

    By J. Paraszczak

    Underground metal mining involves many challenges. Economic slowdown, tough international competition and sometimes volatile metal prices put constant pressure on mine operators to increase productivi

  • CIM
    Maximize Opportunities in Milling Operations

    By K. Kim

    "All milling operations would like to achieve the best possible recovery in combination with the highest achievable throughput. Unfortunately, many operations have problems with low recovery, low thro

    Jan 1, 2019

  • CIM
    Maximizing Gravity Recovery through the Application of Multiple Gravity Devices

    By J. A. Abols, P. M. Grady

    Recovery via gravity is one of the oldest mineral processing methods available. Unfortunately, the use of gravity techniques for gold recovery has been in decline for the past century as more effectiv

    Jan 1, 2005

  • ISEE
    Maximizing Mining Recovery Through Advanced Blasting Techniques and Blast Movement Management

    By Aris Tambunan, Nella Lubis, Nurafrianti Saala, Komang Widhiayanto, Herry Saputra, Rudolf Sitorus

    Maximizing mining recovery rates and minimizing ore loss are pivotal objectives for economic efficiency and operational effectiveness. This study explores methods to address these imperatives by enhan

    Jan 21, 2025

  • SME
    Maximizing the processing of polymetallic concentrates via actinide separation and rare earth retrieval

    By Mona M. Fawzy, Ahmed A. Eliwa, Ebrahim A. Gawad, Ahmed H. Orabi, Amal E. Mubark

    The growing demand for rare earth elements (REEs) has led to numerous recent studies to recover these elements from various bearing ores and wastes. Therefore, the recovery of REEs from Ras Baroud pol

    Oct 1, 2024

  • TMS
    Maximizing the Values of Steelmaking Slags

    By Naiyang Ma

    Along with steel production, various steelmaking slags are constantly generated at considerably high rates. In general, steelmaking slags are not categorized into hazardous materials and do not cause

    Mar 1, 2017