Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction of Hydrostatic Mine Shaft Liners Using Cast Iron Tubbing TechnologyBy J. Ouellet
The design of hydrostatic liner for a deep potash mine shaft in Saskatchewan poses tremendous technological challenges. Technology has evolved to a point where one could consider a new innovative appr
Aug 1, 2013
-
Design and Construction of Mixed Ground Working Platform for a CCR Surface ImpoundmentBy Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste
An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D
Jan 1, 2019
-
Design and Construction of Natural Gas Transmission LinesBy B. W. Snyder
INTRODUCTORY THE earliest known case of transmission of natural gas by pipe lines was early in the Christian era when the Chinese used bamboo pipes to transport natural gas from surface seepages to h
Jan 1, 1951
-
Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling MethodBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.
Jan 1, 2019
-
Design and Construction of Sydney’s South West Rail Link Hume Highway UnderpassBy B Chapman, R Nievergelt, J Hill
A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume
Sep 17, 2014
-
Design and Construction of Tailings Dams (ENVIRONMENTAL CONTROL )By Earle J. Klohn
"The design, construction and operation of tailings dams is rapidly becoming a major consideration for most new mining developments, as well as for many existing operations. In North America, under pr
Jan 1, 1972
-
Design And Construction Of The Deep Stations For The Copenhagen Metro - SynopsisBy David R. Beadman
This paper discusses how modern techniques of design and construction were used to create the deep stations for the Copenhagen Metro. The deep stations are located in small squares within the city adj
Jan 1, 2000
-
Design and construction of the Montana Tunnels tailings disposal facilityBy K. J. Brouwer, J. P. Haile
"Construction of the first stage of the tailings disposal facility for the Montana Tunnels Project was completed in October 1986. The project is located 37 km south of Helena, Montana, and involves mi
Jan 1, 1988
-
Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu
The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo
Jun 13, 2023
-
Design And Construction Of The Soudan 2 Detector LaboratoryBy D. Lee Petersen, Charles R. Nelson, Marvin Marshak
INTRODUCTION Construction is underway on a laboratory cavern 713 m below surface at the Soudan Mine, Tower-Soudan State Park, in northeastern Minnesota. The 13.9 in wide by 11.6 m high by 71.8 in l
Jan 1, 1985
-
Design And Construction Of Wyoming's First Major Sediment Control Reservoir Using Settleable Solids Effluent CriteriaBy P. Kim Carroll, D. Nick Tiffany, Doyl M. Fritz
Thunder Basin Coal Company received the 1987 Wyoming Excellence in Surface Mining Award for construction of the State's first major sediment control reservoir to be designed using the new settlea
Jan 1, 1989
-
Design and control of large hydraulic backfill poursBy John D. Smith, Robert J. Mitchell
"There is a world-wide trend toward underground bulk mining methods employing hydraulically placed backfill. This trend is recent and therefore there is little in the literature to assist an operator
Jan 1, 1982
-
Design and Delivery of Micropile Installation Leveraging Augmented and Virtual RealityBy Guilherme L. M. G. Carvalho, Zachary T. Fleming
In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser
Jan 1, 2019
-
Design and Engineering of Flotation Circuits (in Australia)By D Mcleod, S Brindley, S Green
The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit
Jan 1, 2005
-
Design and evaluation of the roof bolt corrosion test system in a simulated underground coal mine environmentBy Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat, A. J. S. (Sam) Spearing
Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst
-
Design and implementation of a polycarbonate safe haven wall in an underground coal mine - SME Transactions 2013By R. A. Meyr, K. A. Perry
Following three major mining accidents in 2006, the MINER Act of 2006 was enacted by the U.S.Congress. The U.S. Mining Safety and Health Administration subsequently released the Final Rule on Refuge A
Jan 1, 2013
-
Design and Implementation of Solar‑Powered Optical Fiber‑Based Illumination and Communication System for Underground Coal Mines - Mining, Metallurgy & Exploration (2023)By Dushasan Kundu, B. N. Shivakiran Bhaktha, Khanindra Pathak, Sarbojit Mukherjee
Mine safety and quality of life of miner working in underground mines depend to a large extent on mine illumination and communication. The provisioning of reliable, safe, and cost-effective illuminati
Apr 14, 2023
-
Design and Maintenance of Platework and Vessels in MinesBy A. J. Paul Laprairie
The process for which it is to be used is too often the only consideration in the design of a vessel. A de-sign allowing for practical manufacture and erection, as well as for proper maintenance, can
Jan 1, 1963
-
Design and Materials Selection of Autoclaves and Auxiliary EquipmentBy P. Cheung, J. Gulyas, R. Clary
Over the past 50 years, the use of autoclaves in the metallurgical industry has evolved from final metal recovery (hydrogen reduction) and purification (sulphide precipitate oxidation) to treating who
Jan 1, 2004
-
Design and operation of a laboratory packed-bed reactor and its use to study the decomposition of calcium carbonateBy A. Paulin, A. W. D. Hills
The work has shown that packed-bed behaviour can be predicted from the results of single-particle experiments, total reaction times being predicted somewhat more accurately than gas and solid temperat
Dec 1, 1971