Search Documents

Search Again

Search Again

Sort by

  • AIME
    Description of Operations - Mining and Treatment of Clay near Mt. Holly Springs, Pennsylvania (Mining Tech., Jan. 1944, T.P. 1655)

    By Richard M. Foose

    Five miles southwest of Mt. Holly Springs, Cumberland County, Pennsylvania, the Philadelphia Clay Co. has been mining and milling a white clay since 1896; for use in white cement, as a filler in rubbe

    Jan 1, 1948

  • AUSIMM
    Description of the Mond By-Product Gas Plant

    THE plant is one of the usual type of Mond plants, and contains no new features worthy of comment. A brief description of the process, however, with a few remarks on the working of the plant, may prov

    Jan 1, 1918

  • AUSIMM
    Description of the Sulphuric Acid, Nitric Acid, and Superphosphate Plants

    THE following paragraphs represent an endeavour to describe, briefly the equipment used for the manufacture of sulphuric acid and superphosphates by the Corporation.SULPHURIC ACID PLANTS.Two separate

    Jan 1, 1918

  • SME
    Description Of The Van Dyks Drift Low Ash Plant

    By Allen D. Graham

    The coal industry in South Africa is briefly outlined. Test- work carried out on bulk samples of coal in the laboratory and used in the design of the Van Dyks Drift washery are described. Factors affe

    Jan 1, 1982

  • AIME
    Description Of Tro-Pari Borehole Surveying Instrument

    By Charles Trotter

    AN instrument has recently been developed for determining the inclination and azimuthal direction of boreholes. This instrument is known as the Tro-Pari Instrument and is the invention of C. Trotter a

    Jan 1, 1947

  • SME
    Descriptive Commentary - Denver To Gunnison

    By Robert C. Handfield

    The trip from Denver southwest to Gunnison crosses seven main geologic and physiographic areas as shown on the accompanying map. These are: I Mesozoic and Tertiary sedimentary rocks of the Denver M

    Jan 1, 1983

  • ABM
    Desenvolvimento Da Especificação “astm-a653mss80cl1” Para Atendimento Do Mercado Norte-americano

    By Eduardo Macedo Junior

    O presente trabalho descreve o desenvolvimento de uma nova especificação para a Linha de zincagem numero 3 (LZC#3) da Companhia siderúrgica nacional (CSN), de grande demanda e aceitação, alta produtiv

    Aug 17, 2017

  • ABM
    Desenvolvimento De Aço Galvanizado A Quente (Gi) Com Pós-tratamento Para Aumento De Lubricidade

    By Juliana Porto Guimarães

    A crescente demanda por aços galvanizados com alta lubricidade tem impulsionado o desenvolvimento de pós-tratamentos que, aplicados sobre a superfície dos revestimentos, reduzem o atrito entre o ferra

    Jul 30, 2018

  • ABM
    Desenvolvimento Do Pino De Cisalhamento Eletrônico No Laminador 2 (Tl2)

    By Rodrigo Citrangulo Daniel Luiz

    Este trabalho tem como objetivo demonstrar por meio de estudos técnico- científicos e de casos, como foram eliminadas as falhas devido a quebras dos elementos de proteção de sistemas de transmissão de

    Jul 30, 2018

  • ABM
    Desenvolvimento E Implantação Do Modelo De Planejamento E Gestão De Estoques De Mro Através Do Lean Six Sigma Na Arcelormittal Tubarão E Vega

    By Ricardo Rodrigues Grizotti, Laudelino Cota Fonseca Junior, Marcio Basilio Xaviere

    O projeto tem por objetivo desenvolver a padronização e implantação de um Modelo de Governança de Planejamento e Gestão de Estoques de MRO (Manutenção, Reparo e Operação) bem como um Modelo de Reposiç

    Oct 1, 2019

  • ABM
    Desgaste Abrasivo De Revestimentos Cralsin Multicamada/gradiente

    By Vinícius Carvalho Teles

    Durante a estampagem, ocorre o desgaste na superfície da ferramenta devido ao deslizamento entre a ferramenta e a peça. A manutenção das ferramentas de conformação envolve o polimento das bordas ou, e

    Aug 16, 2017

  • NIOSH
    Design Analysis Of Underground Mine Ore Passes: Current Research Approaches

    By Stephen R. Iverson, Bill M. Stewart, Michael J. Beus

    The U.S. Mine Safety and Health Administration (MSHA) has identified ore pass hazards as a significant safety problem in underground metal mines in the United States injury and fatality data show that

  • SME
    Design And Application Of Rare-Earth Magnetic Separators

    By Peter L. Dunn

    With the advent of new high-strength magnetic materials, rare-earth magnetic separators have become more common place for processing heavy mineral sands. In many instances, rare-earth magnets have rep

    Jan 1, 1999

  • AUSIMM
    Design and Commissioning of a 40 Tonne per Day Flotation Concentrate Bio-Oxidation Treatment Plant at the Harbour Lights Mine

    By Carter A. J, Miller D. M, Holder N. H M, Van Aswegen P C

    The Harbour Lights Mine situated at Leonora in Western Australia, mines a refractory sulphidic gold ore. The main sulphide minerals are pyrite and arsenopyrite. Due to the association of gold with the

    Jan 1, 1992

  • CIM
    Design and Commissioning of Commercial Coal Preheating Plants

    By R. H. Chambers, L. Alderman

    "The paper is introduced by an examination of the factors which have led to the present world-wide interest in charging preheated coal to coke ovens. Various possible methods of preheating and chargin

    Jan 1, 1972

  • SME
    Design and Construction Aspects of CSO Tunnel and Pump Station Systems

    By Verya Nasri, James Sullivan, Alex Varas

    "INTRODUCTION Many major cities in the United States have a combined storm water and sanitary sewer network. Regular rainfall overwhelms the system capacity and results in millions of cubic meters of

    Jan 1, 2016

  • SME
    Design and Construction Aspects of Pneumatically Applied Concrete Final Tunnel Linings - Recent Experience at the East Side Access (ESA) Project in New York

    By Alfredo Valdivia, Jesus Schabib, Vojtech Gall, William Cao, Curt Cicileo, Andrew J. Thompson

    "The East Side Access Project (ESA) involves the construction of geometrically complex underground structures including a large number of caverns and bifurcations. Initially conceived as dual lined st

    Jan 1, 2016

  • SME
    Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023

    By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall

    The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana

    Jun 13, 2023

  • SME
    Design And Construction Of Earth Bottom Thickeners

    By Edward S. Hsia

    Pluor Utah has been closely associated with the engineering and construction of earth bottom thickeners for porphyry copper operations, for the counter-current decantation circuit of a gold cyanide pl

    Jan 1, 1977

  • DFI
    Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric Project

    By James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford

    "Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock

    Jan 1, 2017