Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    Control System Selection, Strategy and the Future at Pasminco Mining - Broken Hill's Southern Concentrator

    In 1987 the control strategies at the then ZC Mines' New Broken Hill Consolidated concentrator were a miscellaneous mixture of computer hardware and technology for ISA, grinding and residue thi

    Jan 1, 1991

  • SME
    Controlled Blasting At The CANMET Experimental Mine (PRI-PRINT 95-172)

    Controlled blasting experiments in small development drifts were conducted at CANMET's Experimental Mine, from August 1992 to November 1993. The objective of these experiments was to develop suit

    Jan 1, 1995

  • AUSIMM
    Controlled Blasting for Twin Tunnels with a Shallow Cover under an Operating Railway Line

    By G Gopinath, R Balachander, H S. Venkatesh

    This paper describes in detail the controlled blasting adopted and the measurements undertaken for the successful excavation of large twin tunnels under a shallow cover for a six-lane highway project

    Aug 24, 2015

  • CIM
    Controlled blasting practice at Cominco Copper Division's Valley Mine

    By J. Currie, J. McManus, R. Chenier

    "Cominco Copper Division's Valley Mine is located in the Highland Valley of British Columbia, approximately 275 km by air northeast of Vancouver. The nearest towns are Logan Lake, located IS km t

    Jan 1, 1985

  • SME
    Controlled Environment Through Plant Design At Asarco's Mission Crushing Plant

    By Scott L. Burrill

    In the past 100 years in the mining industry, many references are made to the "Widow Makers", 'Miners Con" and many other derogatory names related to physical hazards. They reflect the lack of un

    Jan 1, 1971

  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • ISEE
    Controlled Underwater Blasting in Santos Port, Brazil

    By Paulo José Costa Couceiro Junior, Manuel Lopez Cano

    The biggest Port of Latin America - the Santos Port in São Paulo, Brazil - has been drilled and blasted by controlled underwater techniques in order to remove around 40,000 m3 (52,318 cubic yard) of r

    Jan 1, 2016

  • AUSIMM
    Controlling Blast Related Fumes with Unconventional Explosives

    By J Rock, K Bambrook

    "Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th

    Nov 15, 2016

  • SME
    Controlling coal spontaneous combustion fire in longwall gob using comprehensive methods — A case study

    By ZHONGLING ZHAO, WANTING SONG, GUOZHONG LIU, LEIXIN SHI, ZUI WANG, YUANYUAN LIU, KE GAO, DONGHONG JIANG, WANG LUO, PEICHAO LU, Jianwei Cheng, WANCHENG ZHENG, Gang Zhao, YUNGANG WANG, JIANBING ZHAO

    Coal spontaneous combustion is one of the major disasters in coal mines, and it can have devastating effects on the normal mining and production activities of mines. This paper presents the field inve

  • SME
    Controlling crosscut damage in response to excessive levels of horizontal stress: Case study at the Subtropolis Mine, Petersburg, OH

    By Anthony Iannacchione, Tim Miller, Nicole Evanek

    The Subtropolis Mine is a room-and-pillar mine extracting the Vanport Limestone near Petersburg, OH. In February 2018, mine management began implementing a new mine layout to better control the negati

  • AUSIMM
    Controlling Factors in the Assay of Silver by Cupellation

    Silver is one of the three major metals produced from the Broken Hill mines. The accurate determination of the silver in these ores, therefore, is of economic importance.With due appreciation of the d

    Jan 1, 1940

  • SME
    Controlling Factors of the E-Field of Electrode-Based Through-The-Earth (TTE) Communication

    By L. Yan, C. Zhou, M. Reyes

    "The MINER Act requires the installation of post-accident, two-way communications and electronic tracking systems for all coal mines. One communication system which can satisfy this requirement is an

    Jan 1, 2017

  • ISEE
    Controlling Fragmentation and Ground Vibrations at Owensville Quarry

    By Rachel Bauer, Jacob Henderson, Dr. Catherine Johnson

    Capital Quarries in Owensville, Missouri faces several challenges when designing a blast that allows for ease of movement while maintaining controlled throw and compliant air over pressure. The primar

    Feb 6, 2023

  • TMS
    Controlling Of Foaming Phenomena During Copper Blow In Copper P-S Converter

    By Pengfu Tan

    Xstrata Copper at Mount Isa in Australia has operated one copper Isasmelt furnace and four P-S converters. The phenomena of foaming occur in above 10% of converter operations. A thermodynamic model of

    Jan 1, 2006

  • SME
    Controlling Open-Pit Slope Failures At Shirley Basin Mine ? Introduction

    By John T. Atkins

    Utah International's Shirley Basin Mine is located in the Southeastern High Plains of Wyoming at an elevation of about 7,100 feet. The Shirley Basin area is a gently rolling semi-arid land. The u

    Jan 1, 1973

  • ISEE
    Controlling Overbreak Through Vibration Monitoring

    By Kaushik Dey

    Bord and pillar is the most predominant method of wining of coal in Indian underground coal mines. Development heading in coal mines often encounters roof stability problem and results in roof overbre

    Jan 1, 2008

  • SME
    Controlling Slope Failures In Operating Open Mines

    By K. C. Ko

    The pit slope angle dictates the economics as much as the depth of the pit. Steeper slope provides more ore reserves, at the same time, the steeper slope presents higher probability of instability and

    Jan 1, 1977

  • AUSIMM
    Controlling Stope Ring Relief in Multi-Level Mass Blasting

    By Q Liu

    Open stoping is one of the widely adopted methods in underground bulk mining. In this method, fanned or parallel holes are often drilled from a top sill down to a sublevel in the ore zone and blasted

    Jan 1, 2005

  • DFI
    Controlling Thermal Stresses in Barrier Walls

    By Karsten Beckhaus

    Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee

    Sep 8, 2021

  • SME
    Controlling Ventilation For Safe Escape From Coal Mine Fires

    If a fire occurs outby an underground coal mine section, the immediate safe evacuation of miners from the working section should always take precedence. Unfortunately, in many cases, the dedicated esc

    Jan 1, 1997