    Tunneling Under the Norris Cut Channel - World Firsts to Overcome the Adverse Ground of Miami

    By Boris CARO VARGAS, Bernard Theron

    "In early 2014, Nicholson Construction Company was awarded, together with its tunneling sister company Bessac, the Norris Cut Miami Tunnel Project. The 2.5-meters diameter segmental lined tunnel, 1600

    Jan 1, 2016

  • SME
    Tunneling With Full Face Shielded Machines: A Study on the Backfilling of the Tail Void

    By Ravi Shah, Augusto Lucarelli, Daniele Peila

    "In mechanized tunneling the annular gap between the segmental lining and the surrounding soil caused by tunnel driving, must be backfilled almost instantaneously with an adequate grouting mortar. The

    Jan 1, 2016

  • SME
    Tunneling Yesterday, Today And Tomorrow

    By John F. Shea

    When Dick Robbins asked me to give a keynote address, I felt it might be in order to review some of the practices and techniques used in tunneling and work up to some of the concepts now used to mine

    Jan 1, 1976

  • NIOSH
    Tunneling: Recommended Safety Rules (Revision Of Bulletin 439)

    This publication is designed to be helpful in promoting health and safety in tunneling and related operations. The format has been selected and arranged to provide a condensed guide for safety personn

    Jan 1, 1968

  • IOM3
    Tunnelling '91, sixth international tunnelling symposium held in London, 14-18 April 1991: report of the proceedings of the symposium

    By G. E. Pearse

    Reports, discussions, a written contribution and two written replies are presented from 11 sessions on: Safety and compressed air; Ground movements; Geotechnical; Channel Tunnel (2 sessions); Machines

    Jun 13, 1905

  • AUSIMM
    Tunnelling in the Andes in Chile – By Drill and Blast and Tunnel Boring Machine

    By R Fletcher

    Pacific Hydro, a leading renewable energy company from Australia, is developing a series of cascading run-of-river hydro electricity projects in the Cachapoal Valley at the base of the Andes Mountains

    Mar 8, 2011

  • AUSIMM
    Tunnelling Induced Ground Deformations and their Effects on Adjacent Piles

    By H G. Poulos

    Prediction of ground deformation caused by soft ground tunnelling is an important problem facing design engineers. The ground deformations are caused by the closure of the gap formed around the tunnel

    Jan 1, 1999

  • SME
    Tunnelling on the South East Transit Project

    By T. W. Peglas, J. Doherty, R. A. Day

    The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,

    Jan 1, 2001

  • AUSIMM
    Tunnelling Projects in Singapore

    By A J. Burchell

    The introduction reviews the tunnelling carried out in Singapore since the early 1980s. Between 1983 and 1990, Phases 1 and 2 of the mass rapid transit system were constructed. These included some 20

    Jan 1, 1999

  • SME
    Tunnelling Under the Fraser River at 6 Bar - Design and Construction of the Port Mann Main Water Supply Tunnel

    By Tim Langmaid, Steve Skelhorn, Stephanie Robillard, Allen Mitchell

    "The Port Mann Main Water Supply Tunnel project provides a critical water main crossing of the Fraser River for the owner, Greater Vancouver Water District (Metro Vancouver). The project consists of t

    Jan 1, 2016

  • SME
    Tunnels - The Owners' Problems

    By T. J. Jr. Corwin

    This paper will cover the problems confronting an owner when planning and estimating the cost of a proposed tunnel. Three factors are known: the length, size and the time allocated for the completion

    Jan 1, 1974

  • CIM
    Turbo Pulp Lifter (TPL™) - An Efficient Discharger to Improve SAG Mill Performance

    By Sanjeeva Latchireddi

    "Deteriorating ore grade and high demand of metals has tremendously influenced the unit capacity of SAG mills. Pebble circuits have been added to the existing SAG circuits to increase their unit capac

    Jan 1, 2007

  • SME
    Turbulent Models for Pollutant Transport in Open Pit Mines under Stable Boundary Layer

    By R. V. Ramani, K. V. Raj

    "The air flow problems in open pit mines are complex. Computational fluid dynamics (CFD) models provide a detailed knowledge of the airflow pattern and velocity distribution, temperature, and pollutan

    Jan 1, 2015

  • SME
    Turbulent models for pollutant transport in openpit mines under stable boundary layer - SME Transactions 2015

    By R. V. Ramani, K. V. Raj, S. Bandopadhyay

    The air flow problems in openpit mines are complex. Computational fluid dynamics (CFD) models can provide detailed information regarding air flow pattern, velocity distribution, temperature, and pollu

    Jan 1, 2015

  • TMS
    Turning Blast Furnace Dust into a Source of Zinc and Lead Units: A Progress Report on Testwork at Corus Ijmuiden

    By S. q. Honingh, G. Van Weert

    Currently produced zinc-enriched blast furnace dust is stored on site at CORUS IJmuiden. To end this practise, a research program was started in 1996. Four technologies were studied: oxidative autocla

    Jan 1, 2000

  • SME
    Turning Gray into Green - Emphasizing the Sustainable Benefits of Tunnel Projects

    By Brian Gettinger, Jim Schlaman, Alston Noronha

    "INTRODUCTION The public understanding of green solutions today is based on the definition of sustainability adopted by the Brundtland Commission (World Commission on Environment and Development) in 1

    Jan 1, 2016

  • DFI
    Turning the Valley of Ashes into a Tennis Haven: The Development History of the USTA Site in Queens, NY

    By Athena C. Denivo, Pablo V. Lopez, Michael McMaster, Sissy Nikolaou, Alfred H. Brand

    "The paper presents the history of development of the United States Tennis Association (USTA) site, focusing on geotechnical, geoseismic, and foundation engineering challenges associated with it. The

    Jan 1, 2016

  • AIME
    Tuscarora Associates - Tuscarora, Elko County, Nevada

    The Tuscarora mining district, which has been highly productive of gold and silver ores in past years, is situated about 50 miles north- west of Elko, Nevada. The town of Tuscarora lies at an altitude

    Jan 1, 1981

  • CIM
    Tuyere Pressure Frequency Measurements In A Peirce Smith Converter

    By M. Kreuh

    An investigation of the pressure pulse spectrum generated by the gas dispersion processes in a Peirce Smith copper converter was undertaken via the simultaneous measurement of four tuyeres using high

    Jan 1, 2007

  • CIM
    Twelve Months' Milling at Noranda

    By C. G. McLaughlan

    The Noranda concentrator was placed in operation in October, 1928, and the object of this paper is to outline operations during the twelve months which have elapsed since that time. The ores milled