Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Use Of Pre And Post Processing In Analysis Of Grinding Mill ShellsBy Fred L. Myers
The use of finite element programs for evaluating large grinding mill shells is becoming increasingly popular. However, large scale, detailed analysis can become a burdensome task when one is required
Jan 1, 1979
-
Trenchless Utility Relocation Addresses Environmental Impact for Channel Crossing - NAT2022By John D. Hanifin, C. Kevin Moon, Eric C. Wang
Value Engineering on Connecticut DOT’s Walk Bridge selected the trenchless option for utility relocation to address the channel crossing’s environmental concerns. The design and construction considera
Dec 1, 2022
-
Under Pressure: Geotechnical Forces and Conditions at Work on the Ohio River Tunnel Project - RETC2021By Ross Goodman, Jesse Salai
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges such as crown and invert instability due to the overstress condition affecting the strata above, below, and in the
Jun 13, 2021
-
Planning for Emerging Technology Underground Connection Between Rancho Cucamonga Metrolink Station and Ontario International AirportBy Mike Wongkaew, Brandon Kluzniak, Per Vilhelmsson
Rail access to Ontario International Airport (ONT) has long been a goal of San Bernardino County Transportation Authority (SBCTA) to increase public transit options to ONT and provide incoming ONT pas
Dec 1, 2022
-
The Role of Small Diameter Tunneling for Pipeline Installations - RETC2021By P. Schmäh
Nowadays, small diameter tunnels are increasingly considered in pipeline projects as an alternative for sensitive crossings or when soil conditions limit the use of conventional pipeline installation
Jun 13, 2021
-
Agglomeration -Skin Flotation Of Coarse Phosphate RockBy Brij M. Moudgil
Flotation was introduced in phosphate rock processing in the late twenties and since then it has been an important part of the concentration process. More than two thirds of the rock produced in Flori
Jan 1, 1977
-
A Hydrometallurgical Process For Beryllium Recovery From Spors Mountain Ores, UtahBy J. K. Grunig
A process consisting of leach, continuous countercurrent decantation, resin-in-column ion exchange, evaporative crystallization of beryllium sulfate, and decomposition of the sulfate was developed for
Jan 1, 1982
-
Kramer Tunnel—Challenging NATM Tunnelling in Germany’s Alps - RETC2021By Roland Arnold, Richard Gradnik, Martin Zeindl
This paper presents the details of the Kramer tunnel project in the Federal State of Bavaria, Germany. This road tunnel, which has been under construction since December 2019, is the key component of
Jun 13, 2021
-
Large-Scale Explosion Propagation Testing of Treated and Non-treated Rock Dust When Overlain by a Thin Layer of Coal Dust "Mining, Metallurgy & Exploration (2021)"By Inoka E. Perera, Robert Hildebrandt, Gerrit V. R. Goodman, Krzysztof Cybulski, Zdzisław Dyduch, Michael J. Sapko, Marcia L. Harris
To prevent coal dust explosion propagations, rock dust needs to be lifted and suspended in the air with the coal dust during an explosion. The addition of anti-caking agents prevents caking of rock du
Jan 20, 2020
-
Determination Of In Situ Modulus Of Deformation In Hard Rock Mines Of The Coeur D'Alene District, IdahoBy Michael J. Beus, Jan G. Patricio
INTRODUCTION The U.S. Bureau of Mines, Spokane Mining Research Center, has been conducting and documenting rock mechanics research in the Coeur d’Alene mining district for the past ten years (1, 2,
Jan 1, 1977
-
Newmont Gold Company's Mill No 3, Plant Design From An Operator's ViewpointBy James J. Komadina
INTRODUCTION Newmont Gold Company's Rain operations are located in Elko County, Nevada, approximately 9 miles southeast of the Town of Carlin.The property was submitted to Newmont Exploration Li
Jan 1, 1990
-
Anaconda's Experience With Percussion Longhole Drilling In Butte, MontanaBy P. J. G. du Toi
Anaconda's experience with percussion longhole drilling in Butte, Montana, has consisted of six phases: 1. Drilling horizontal blast holes in stopes with push feeds. 2. Ring and parallel blast
Jan 1, 1970
-
Phosphate And Florida's EnvironmentBy R. S. Hearon
The image of the open-pit miner in the eyes or the Environmentalist has never been very outstanding. The phosphate industry, whose history in Florida reaches back to the late 1800's, can-not be c
Jan 1, 1978
-
Solvent Extraction Of Iron (III) From Acid Sulfate Solutions With Eichrom's Dipix ExtractantBy S. S. Xue
A study has been conducted to remove iron from sulfate solutions using Eichrom's Dipex® extractant, P,P?-di(2-ethylhexyl) methanediphosponic acid (H2DEH[MDP]). It is found that this extractant ca
Jan 1, 1999
-
Survey Of Electromagnetic Emissions In Underground Coal Mines - SME Annual Meeting 2022By N. Damiano, C. Zhou, R. Jacksha, J. Srednicki
Modern electronic devices and systems used to enhance miner safety and health are becoming commonplace in underground coal mines. The ability for these devices and systems to function properly in the
Mar 2, 2022
-
Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN - NAT2024By Christian Heinz, Doug Harding
TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM wa
Jun 23, 2024
-
Using Event-Based Imaging and Deep Learning to Generate 3D Surface Maps for Autonomous Roof Bolting - SME Annual Meeting 2024By Andrew J. Petruska, Rik Banerjee
This study explores implementing a machine learningbased system to generate a 3D surface repre- sentation of the roof and support straps in the mine. Event cameras have been chosen for their performan
Feb 1, 2024
-
Accelerating Plant Commissioning: Unlocking Early Profits Through Strategic Planning - SME Annual Meeting 2025By Daniel Roy, Danielle Bouffard, Antoine Berton, Simon Gariépy
Commissioning a mineral processing plant has always been a challenging task. The process includes pre- operational verification, dry and wet commissioning, and a gradual ramp-up to full production, al
Feb 1, 2025
-
Designing a Rockfall Testing Program for Open-Pit Mines to Investigate Runout and Bench Catchment - SME Annual Meeting 2024By Sean Warren, JOSEF BOURGEOIS
The potential of rockfall at open-pit mines presents a continuous hazard to mine workers and is typically mitigated by designing catch benches at empirically determined widths. The National Institute
Feb 1, 2024
-
Grouting Aggressive Ground in Qatar - NAT2024By Hernan Fernandez, Khalid Saif F S Al- Khayareen, Volkan Salepciler, Jacek B. Stypulkowski
Wakrah and Wukair Drainage Tunnel, WWDT is 13 km long with a 4.5 m ID sewer water tunnel about 50 to 60 m below ground surface. Integral to the project are several adits with provisions for future con
Jun 23, 2024