Search Documents

  • SME
    Passive mine blast attenuators qconstructed of rock rubble for protecting ventilation seals - SME Transactions 2009

    By M. R. Hieb, J. R. Britt, S. P. Harteis, M. J. Sapko, E. S. Weiss, R. K. Zipf

    The design requirements for mine ventilation seals have undergone a radical transformation in recent years, and these revisions have greatly increased the cost of the seal designs and their constructi

    Jan 1, 2009

  • DFI
    Guide to Drafting a Specification for Micropiles (XXII International Mineral Processing Congress)

    By Joint Micropiles Committee

    "The three types of specifications which are used for micropile work are: • Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must

    Jan 1, 2004

  • CIM
    Reliability analysis as a tool for surface mining equipment evaluation and selection

    By J. Wong, M. G. Lipsett, L. K. Daneshmend

    "Current trends of increased size, complexity, and automation of surface mining equipment necessitate more comprehensive and objective techniques for equipment comparison and selection. The field of r

    Jan 1, 2000

  • DFI
    Guide to Drafting a Specification for High Capacity Drilled and Grouted Micropiles for Structural Support

    By Donald Bruce

    The three types of specifications which are used for micropile work are: ? Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must

    Jan 1, 2004

  • SME
    Design of the University Link Tunnels and Stations

    By Daniel N. Adams

    The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter

    Jan 1, 2008

  • SME
    Selecting a Conveyor System

    By Leroy O. Gieseke, John B. Begley

    If the particles produced and transported in your plant are as chunky as rough crushed coal or as fine as cement, there are probably several conveying and elevating systems suitable for your operation

    Jan 12, 1980

  • SME
    Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill Grout

    By Lorenzo Pellegrini

    The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and

  • SME
    Development Of An Automated Drill And Blast System

    By Dennis P. Martin, Michael M. Fitz, James E. Friant

    Methods for reducing the cyclic nature of drill and blast tunneling operations have been long needed. A miniature blasting system using 10 mm (.375 in.) holes, 0.91 m (36 in.) deep, and blasting only

    Jan 1, 1989

  • CIM
    The Electrical System of the Hudson Bay Mining and Smelting Company, Limited

    By G. F. Cross

    INTRODUCTION THE electrical system associated with the mining development of the Hudson Bay Mining and Smelting Company, Limited, at Flin Flon, Manitoba, may be conveniently divided into three main p

    Jan 1, 1935

  • NIOSH
    RI 7003 A Two-Constant Equation For Helium From 300 To 1,473°K

    By Jonnie M. Estes

    A two-constant equation is presented for helium from 30° = T = 1,473° K. This equation is developed by modifying a generalized equation of state originally presented by Redlich and Kwong (20).3 The mo

    Jan 1, 1967

  • AUSIMM
    The Use of Major Ion Analysis and Stable Isotopes dO18 and dH2 to Distinguish Groundwater Flow in Karijini National Park, Western Australia

    By W Dodson, S Dogramaci

    Isotopes and hydrochemistry were used to define groundwater flow systems and better understand the hydrogeological setting of the Karijini National Park, which is in the Central Pilbara region adjacen

    Jan 1, 2009

  • NIOSH
    RI 2281 The Recovery Of Unburned Fuel From Boiler Furnace Refuse

    By Thomas Fraser

    About 24 per cent of our total production of bituminous coal is used in industrial power plants. As regards fuel conservation, therefore, the recovery of unburned fuel from furnace refuse presents int

    Jan 1, 1921

  • SAIMM
    Multicriteria Selection For An Alumina-Cement Plant Location In East Azerbaijan Province Of Iran

    One of the most important factors leading to the success of a cement plant is its location. A multicriteria decision-making method is used to rank alternative plant locations. The set of criteria is e

    Jan 1, 2005

  • NIOSH
    RI 5027 Effects Of Variations In Bulk Density On Coking Time ? Introduction And Summary

    By John B. Gayle

    The coking time has considerable influence on the throughput of a coke oven, and for this reason a large number of papers dealing with the relationship between coking time and the different operating

    Jan 1, 1954

  • AUSIMM
    Rehabilitation of the Collapsed Panel 1K North in the Deep Ore Zone Block Cave Mine

    By A Kurniawan, A Sjadat and M Akhasyah

    PT Freeport Indonesia’s Deep Ore Zone (DOZ) is a block cave mining operation that has been in production for 15 years. DOZ is located approximately 900 m below surface and has an average production ra

    May 9, 2016

  • NIOSH
    RI 7946 Coal Mine Dust Incombustibles Content Analyzer Using a Gamma-Ray Backscatter Technique

    By F. E. Armstrong

    An instrument using a gamma-ray backscatter technique for determining the weight-percent incombustibles content of coal dust and rock dust mixtures in coal mines has been built and tested. The unit gi

    Jan 1, 1974

  • AIME
    Reservoir Engineering – General - A Numerical Method for Computing Recovery of Oil by Hot Water Injection in a Radial System

    By K. P. Fournier

    This report describes work on the problem of predicting oil recovery from a reservoir into which water is injected at a temperature higher than the reservoir temperature, taking into account effects o

    Jan 1, 1966

  • SAIMM
    Valuation Of A Mineral Resource That Has A Compound Metal Content Distribution: An Example Based On The Merensky Reef At Wesizwe Platinum Limited?s Pilanesberg Project

    By D. R. Young

    Drilling exploration over the Wesizwe Platinum Limited?s Pilanesberg Project has identified the Merensky Reef at depths varying from 594 m to 1 552 m depth. Merensky Reef thickness varies from 0.05 m

    Jan 1, 2006

  • AIME
    The Effect Of Water On The Mechanical Properties And Microstructures Of Granitic Rocks At High Pressures And High Temperatures

    By Ove Alm

    Wet and dry specimens of three rocks of approximately granitic composition were deformed at different experimental conditions. These experiments were carried out in order to study the extent to which

    Jan 1, 1982

  • CIM
    The Lithium. and Beryllium Pegmatites of Southeastern Manitoba

    By J. F. Davis

    Pegmatite dykes containing lithium minerals and beryl occur dose to the borders of intrusive masses of granitic rock in the Winnipeg River area of Manitoba. Both vertical and flat-lying dykes are pres

    Jan 1, 1958