Search Documents

  • DFI
    Construction Of Deep Open Foundations For Airoli Road Bridge On Thane Creek In New Bombay - Synopsis

    By A. R. Jambekar

    City of Bombay has been developed out of former 7 islands. Landmass of 434 sq.km. of Bombay, started looking inadequate for further growth and expansion of Bombay City. In order to develope twin city

    Jan 1, 1996

  • CIM
    Metalliferous sub-marine sediments of the Atlantis-II-Deep, Red Sea

    By Zuhair A. Nawab, Muhammad A. Al-Marhqun, Mehmet Guney

    "The Atlantis-Il-Deep is a stratified metalliferous deposit located along the median valley of the Red Sea at a water depth of about 2200 m. The metal-bearing mud contains sulphides of zinc, copper an

    Jan 1, 1988

  • CIM
    MLA: The New Sherlock Holmes of the Mining and Metallurgical Engineering Industry

    By Paul Miranda, Corby Anderson

    "The Center for Advanced Mineral and Metallurgical Processing (CAMP) has recently obtained a Mineral Liberation Analyzer (MLA). CAMP has utilized the technology for several projects with excellent res

    Jan 1, 2007

  • DFI
  • NIOSH
    OFR-161(1)-77 Stope Mechanization - Vein Mining

    By J. Bootle

    Marrow vein deposits will continue to be an important source of valuable minerals. Productivity per manshift is not keeping pace with operating costs. Increased mechanization of stoping operations mus

    Jan 1, 1977

  • NIOSH
    Using Proximate Analysis to Characterize Airborne Dust Generation from Bituminous Coals

    By Steven J. Page, John A. Organiscak

    The amount of airborne respirable dust generated from break- age of different coals varies widely. This research was conducted to identify the facets of airborne respirable dust liberation from the co

  • AUSIMM
    Concentration and Hydraulic Transport of Heavy Mineral Concentrate with Automatic Control

    Titanium and Zirconium Industries Pty. Ltd. separates rutile and zircon from heavy mineral concentrate recovered from sand dunes on the east coast of North Stradbroke Island, Queensland. Separation pl

    Jan 1, 1962

  • SME
    Planning and Preliminary Design of the North-South Bypass Tunnel, Brisbane, Australia

    By Tony Peglas, Harry Asche, Eva Wood

    The North-South Bypass Tunnel is a new $AUD1.5 billion underground traffic route in Queensland, Australia, a project of the Brisbane City Council. The tunnel is approximately 5.2 km long, bypassing th

    Jan 1, 2005

  • AUSIMM
    Tackling the Gorillas - Hairy Scary Complacency to Safety in Mining or a Banana Packer's Story

    Shane is enjoying his new work. Six months ago, he was stocking shelves at his local supermarket and decided to make the big move to a job in mining with more challenge and, of course, more dollars. H

    Jun 1, 2010

  • SME
    Impacts Of Ground Convergence On TBM Performance In Ghomroud Tunnel

    By Ebrahim Farrokh

    Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided

  • AIME
    Minerals Beneficiation - Relation of Magnetic Susceptibility to Mineral Composition

    By David R. Mitchell, Ernest M. Spokes

    There is evidence that study of minerals now considered to have susceptibilities too low for magnetic separation should be continued. Present concepts may be false. INFORMATION on magnetic properti

    Jan 1, 1959

  • AUSIMM
    Coal and Coal Mining in New South Wales

    The State of New South Wales is highly favoured in having vast deposits of coal adjacent to and within easy reach of the coastal Ports. Not only is the quality of the fuel generally superior to any fo

    Jan 1, 1904

  • AUSIMM
    The New System of Structural Analysis in Drillcore

    A comprehensive analysis of rock structures in non-oriented (axially oriented) drillcore is now available (Laing, in press). The system embodies new concepts which better equip the geologist and engin

    Jan 1, 1990

  • AUSIMM
    Factors Determining Lead Yields During Electrolysis of PbS Dissolved in Molten Chlorides

    A study of the electrolysis of PbS in molten PbCl2 showed cathode efficiencies which increased with current density at fixed sulphide concentrations, and decreased with increasing sulphide concentrati

    Jan 1, 1973

  • AUSIMM
    Energy Conservation in the Indian Mining Industry - An Overview

    The last one decade in India had witnessed phenomenal growth in the coal, lignite, iron ore, limestone and many other minerals. To meet the production of minerals, the energy requirement is also very

    Dec 6, 2010

  • AUSIMM
    The Copper-Clay Deposits at Mount Lyell, Tasmania

    The copper-clay deposits consist largely of goethite and clayey mudstones carrying native copper, cuprite, and chalcocite. The mudstones are of Ordovician age, are interbedded with Fe-Mn carbonates, a

    Jan 1, 1969

  • IIMP
    Sistema de izaje con winchas de fricción "Koepe" en la mina Casapalca

    By Jaime Tumialán

    El presente texto describe el diseño y ejecución del sistema con winchas de fricción" Koepe" del pique central de Casapalca, dado que será uno de los más modernos del Perú y su aplicación se realizará

    Jan 1, 1983

  • NIOSH
    RI 2743 Coal Mining Royalties And Leasing Conditions In Vermilion And Edgar Counties, Illinois (District VIII) (ff64c1c3-266d-4549-969a-69f8d415a2e0)

    By L. D. Tracy

    "This paper represents work conducted by the Bureau of Mines in cooperation with the Illinois Geological Survey and the Engineering Experiment Station of the University of Illinois.IntroductionThe pre

    Apr 1, 1926

  • SME
    Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74

    By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy

    This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660

    Feb 24, 1997

  • SME
    A 4.75m Contractor Manufactured EPB Machine

    By Bruce Richardson

    A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec

    Jan 1, 2008