Search Documents

  • IMPC
    Effect Of LOI Content Of Iron Ores And Other Process Variables On The Reduction Properties Of Sinter

    By R. P. Bhagat

    The paper reports results on sinterability of iron ores from the mines of Tata Steel Limited. The objective was to improve tumbler index (TI) of sinter and its reduction parameters, reduction degradat

    Sep 1, 2012

  • CIM
  • AIME
    Improved Drill Shop Equipment at Morenci Branch of Phelps Dodge Corporation

    By AIME AIME

    AT the Morenci branch of the Phelps Dodge Corporation, of which Frank Ayer is manager, several new types of machines that have been developed by Charles Mitchell, shop foreman in the drill steel shop,

    Jan 1, 1930

  • IMPC
    An Experimental Investigation of Slag Foaming of High Fexo Slags

    By Susanna A. C. Stadler, Chris Aldrich, Jacques J. Eksteen

    Slag foaming occurs in several pyrometallurgical processes. These processes include steelmaking in basic oxygen steelmaking furnaces and electric arc furnaces as well as various non-ferrous operations

    Jan 1, 2003

  • AUSIMM
    Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation Drilling

    By M Goers, M Almond

    "The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w

    Aug 21, 2012

  • NIOSH
    RI 8927 - Cobalt Recovery From Copper Leach Solutions

    By T. H. Jeffers

    Significant amounts of cobalt, a strategic and critical metal, are present in readily accessible spent copper leach solutions. For example, recovery of cobalt at two major u.S. copper operations could

    Jan 1, 1985

  • SME
    The Henderson Mine

    By William G. Doepken

    GENERAL DESCRIPTION The Henderson mine utilizes a highly mechanized, continuous panel-caving system to extract ore from a deep, massive, molybdenum deposit. The mine site, lo¬cated 80.5 km (50 mile

    Jan 1, 1982

  • RMCMI
    Morning Session Wednesday, July 1, 1964

    President Heiner opened the final session of the Institute at 9:30 a.m. Frances Leonard read the report of the Auditing Committee. Motion made by Stan Shubart for acceptance of audit and approval.

    Jan 1, 1964

  • SAIMM
    Effect Of Residual Tectonic Stresses On Roadway Stability In An Underground Coal Mine

    By B. Unver

    Effective strata control is a prerequisite for maintaining an efficient mining operation. If the strata in the vicinity of an opening are not controlled effectively, it is impossible to perform a safe

    Jan 1, 1999

  • NIOSH
    RI 4485 Investigation Of The M.C. Zinc Mine Lafayette County, Wis.

    By G. A. Apell

    Completion of 18 churn-drill holes totaling 2,218 feet and 3 diamond-drill holes aggregating 421.5 feet of drilling in the M.C. mine area, near Truman, Wis., provided information indicating the existe

    Jan 1, 1949

  • SME
    Is Control of Fine Coal Circuits Necessary?

    By Randhir Sehgal

    If the primary purpose of a control system is to assure a fixed-quality product at maximum yield, the real issue involved in control of the fine coal cleaning circuit in a plant is to demonstrate that

    Jan 1, 1988

  • CIM
    Mirador Copper - Gold Project

    Mirador - Overview ? Located in Andean foothills of SE Ecuador ? Copper-gold porphyry hosted by calc-alkaline Late Jurassic granitic and porphyritic rocks ? 438 MT of 0.61% Cu and 0.19 g/t Au measu

    May 1, 2006

  • IIMP
    Gestión operativa del Centro Integrado de Operaciones de Quellaveco

    By Adderly Reeves, Renzo Dávila, Cinthya Lozano

    Anglo American Quellaveco S.A. inició sus actividades productivas en el año 2022 con un Centro Integrado de Operaciones (IOC) que centraliza el monitoreo y control de todas las actividades productivas

    Sep 29, 2023

  • AUSIMM
    The Character and Spatial Distribution of Epithermal Gold Mineralisation at the Ladolam Gold Deposit, Lihir Island, Papua New Guinea

    By N Javati, G D. Carman, D Kikiha, B Likia, K Dala, J McPhie, R Johnstone, D R. Cooke, J L. Blackwell

    The 40 Moz Ladolam gold deposit on Lihir Island, Papua New Guinea is the worldÆs largest, low-sulfidation, epithermal gold deposit, in terms of contained gold. The deposit has average grades of 2.42 g

    Jan 1, 2008

  • AUSIMM
    Continuous pH and Pulp Potential Measurements During Complex Sulfide Ore Flotation

    Continuous pH and Pulp Potential Measurements During Complex Sulfide Ore Flotation

    Sep 13, 2010

  • SME
    Dust Mitigation through a Program-Based Approach

    By S. R. Clark

    "INTRODUCTION Of all the natural resources being taxed by the needs of the modern world, perhaps the most important is the continually expanding demand for water resources. As water becomes scarcer, a

    Jan 1, 2018

  • ABM
    Melhoria Da Qualidade Do Dimensional Das Barras Redondas Laminadas No Lcp Na Votorantim Siderurgia

    By Izabelle Lannes Salgueiro Ferreira

    O presente trabalho teve como objetivo garantir a estabilidade no processo de conformação mecânica das barras redondas laminadas, visando reduzir a geração de produtos não conformes e o número de recl

    Aug 17, 2017

  • SAIMM
    Discrete Element Method Modelling Of Liner Wear In Dry Ball Milling

    By J. T. Kalala

    Energy consumption and wear of grinding media and liners are the major cost factors in milling plants. Since the beginning of the last century, much effort has been directed at the prediction of the p

    Jan 1, 2004

  • AUSIMM
    Engineering the New Olympic Dam Backfill System

    By A G. Grice

    WMC Resources Pty Ltd û Copper Uranium Division operates the large underground Olympic Dam Mine at Roxby Downs, South Australia. These operations mine and process the ore to produce refined copper, ur

    Jan 1, 2000

  • ABM
    Ajuste Do Modelo Matemático Dos Fornos De Reaquecimento De Placas Para Operação Com Gás Natural

    By Antonio Adel dos Santos

    Em agosto/2014 foi introduzido o gás natural, GN, na matriz de combustíveis dos fornos de reaquecimento de placas da Linha de Tiras a Quente, em Ipatinga, eliminando o óleo combustível deste processo.

    Aug 16, 2017