Search Documents

  • SAIMM
    How fine particles on haematite mineral ultimately define the mineral surface charge and the overall floatability behaviour - Synopsis

    By S. Montes

    Mineral floatability is strongly connected with mineral structure and composition. The complexity of mineral surfaces has meant that few attempts have been made to understand the effect of impurities

    Jan 1, 2007

  • SME
    Engineering The Health, Safety And Comfort Of Dump Truck Operators

    By N. Aouad

    Dump truck operators are exposed to whole-body vibration (WBV) levels that exceed the International Standard Organization (ISO) 2631-1. The WBV level measured by RMS acceleration value, for operator c

    Feb 27, 2013

  • AUSIMM
    Recycling of Sludge from the Production of Manganese

    Recycling of Sludge from the Production of Manganese

    Sep 13, 2010

  • NIOSH
    Thermodynamic Data For Mineral Technology

    By L. B. Pankratz

    Thermodynamic data on the elements, oxides, sulfides, halides, and selected hydrides, carbides, nitrides, carbonates, sulfates, silicates, and miscellaneous compounds were reviewed, evaluated, and com

    Jan 1, 1984

  • NIOSH
    RI 6785 Electrodeposition Of Aluminum From Fused-Salt Electrolytes Containing Aluminum Chloride

    By P. C. Good

    Work was done to determine conditions necessary for efficient electrodeposition of aluminum from fused chloride electrolytes. Aluminum was deposited from a molten chloride salt electrolyte over a temp

    Jan 1, 1966

  • NIOSH
    MLA 29-85 - Mineral Resources Of The Pinnacles Wilderness Contiguous Wilderness Study Area (BLM No. CA-040-303), San Benito And Monterey Counties, California

    By Lucia Kuizon

    The Pinnacles Wilderness Contiguous Wilderness Study Area (WSA) (CA-040-303) is 30 miles south of Hollister, CA, in San Benito and Monterey Counties. It is composed of five parcels of public land tota

    Jan 1, 1985

  • SME
    High-Pressure Roll Mill Comminution Of Heterogeneous Multicomponent Feeds

    By Oliver Gutsche

    High-pressure roll mill comminution of heterogeneous multicomponent feeds was simulated with artificial limestone-quartzite mixtures using a piston-die press. The influence of heterogeneous interactio

    Jan 1, 1995

  • CIM
    Arsenic Immobilization and Metal Recovery from El Teniente Smelter Dust

    By R. Ichimura

    This paper summarizes the results of a five-year project, which aimed at improving the current method to process the arsenic-bearing smelter dust of El Teniente. This project, which was started in 200

    Jan 1, 2007

  • AUSIMM
    A Geotechnical Investigation of Opal Mining Practices at Lightning Ridge

    By J M. Galvin, B J. McKinnon

    Lightning Ridge, Australia, is the largest opal producing area in the world. Most opal is mined from shallow underground mines by individuals or small partnerships with the industry having been protec

    Jan 1, 2002

  • IIMP
    Máximas demandas y consumos de energía eléctrica para la minería en planes regionales de electrificación

    By Juan Orellana Zuñiga

    Los planes regionales de electrificación primaria requieren la determinación de las máximas demandas y consumos de aplicaciones eléctrica en un plazo de 10 a 20 años. En este sentido, el objeto del te

    Jul 20, 1961

  • IMPC
    Yield and Energy Optimizations of Compressive Crushing

    By E. Lee

    With the growing environmental concern, as well as the increasing concern for sustainability of natural resources, the need of improving the performance and efficiency of today?s crushers is be-coming

    Jan 1, 2014

  • AUSIMM
    Closure Planning Lessons Learnt from the Century Mine

    By J Crosbie, M Lord, R Bitencourt, P Defferrard

    The MMG Century mine, which is the largest zinc/lead mine in Australia, began operating in 1999 and ceased mining from the open pit in July 2015, with processing completed in early 2016. Closure plans

    Jun 22, 2016

  • DFI
    Instrumented Load Tests On Closed-And Open-Ended Piles

    By Junhwan Lee

    Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p

    Jan 1, 2003

  • TMS
    Cation Exchange Properties Of Zeolites Obtained From Coal Fly Ash By Alkali Hydrothermal Treatment

    By Norihiro Murayama

    Syntheses of zeolitic materials were carried out from coal fly ash by alkali hydrothermal treatment as part of the reuse and recycle technologies of coal ash, For the obtained zeolites, the cation exc

    Jan 1, 2003

  • SME
    Save Your Energy and Improve Your Productivity

    By W. J. Kennedy, John D. Gardner

    Introduction During the past 10 years, energy costs in mining have risen from about 4% to as much as 25% of total production cost. When combined with declining ore grades, these costs exert inordinat

    Jan 11, 1983

  • AIME
    Notes On The Laramie Tunnel.

    By David W. Brunton

    (San Francisco Meeting, October, 1911.) MINE-DRAINAGE and the ever-increasing demand for water on the plains have within the past few years necessitated the driving of a great number of adits and tun

    Apr 1, 1912

  • SME
    Reducing Emissions Through The Use Of A Fuel Borne Combustion Catalyst

    By R. Curtis

    To achieve compliance with 2015 EPA Tier 4 Final regulations, which permit only around 10% of Tier 3 particulate matter (PM) and NOx emissions, a number of technologies are being implemented. Use of a

    Feb 27, 2013

  • IMPC
    Surface Broken Bonds: A Fast Way to Start Mineral Chemistry Studies

    By Zhiyong Gao, Ruiying Fan

    "Crushing and grinding are the prerequisite processes in many industries, such as minerals processing and powder technology. During crushing and grinding, minerals will cleave or fracture along the di

    Jan 1, 2018

  • NIOSH
    Reel-Mounted Hose And Cable For Loader - Objective

    Reduce accidents associated with handling of the electrical trailing cable and the water hose on mining equipment. Approach Two reels were mounted on a loading machine to store and release the

    Jan 1, 1978

  • DFI
    Dynamic and Static Load Testing: A Cost Savings Approach

    By Thomas Hyatt, Brandon Phetteplace, Camilo Alvarez

    A test pile program was undertaken at a project site in Ain Sukhna, Egypt for an import/export oil jetty. Two 1219 mm diameter open ended steel pipe piles were evaluated at two separate test locations

    Jan 1, 2019