The Carbon In Pulp Process For Recovering Gold From Acid Plant Calcines At President Brand ? SynopsisBy G. J. C. Young
The paper describes the replacement of a conventional filtration, clarification and zinc precipitation plant by a carbon in pulp (CIP) electrowinning plant, with the objective of improving the recover
Jan 1, 1982
-
New Methods in Mined-Land ReclamationBy Rodney R. Krause
In attempting to tell the general public about the coal industry's land reclamation efforts, we have often said, "We're not doing things by the book, because we're still writing it." Li
Jan 1, 1970
-
A Theoretical And Experimental Study On Air Leakage Through StoppingsBy Dai Wang
Stoppings are necessary ventilation control devices for effective air distribution underground. However, one of the major problems underground mining has is that every stopping is a potential leaking
Jan 1, 1998
-
Investigations Of The Influence Of Block Caving Upon Adjacent Mine Openings ? IntroductionBy Stephen Utter
This report summarizes the results of preliminary investigations concerning the influence of block caving mining upon adjacent mine openings and discusses possible methods for reducing critical rock p
Jan 1, 1962
-
Feed-Forward Control For Grinding Circuits ? IntroductionBy Stephen J. Swan
Feed-forward control (i.e. the forward flow of information in a control system ) is a simple and flexible approach to over-all control of a ball mill-rake classifier grinding circuit. The system descr
Jan 1, 1970
-
Utilization of lignite fly ash as hydraulic binder and backfill materialBy I. Gombköto, G. Földing, G. Mucsi, B. Csoke, J. Faitli, B. Kovács
This paper summarizes the main achievements of our previous project entitled "Development of a technological system producing quality guaranteed fly-ash based binder". Furthermore, this study deals wi
Jan 1, 2011
-
Mine Planning And Emission Control Strategies Using Geostatistics ? IntroductionBy Francis Martino
There are numerous techniques and predictive models used by geologists and mining engineers to define coal reserves and plan mines. The traditional reserve estimation methods commonly used include the
Jan 1, 1983
-
What Happens In Vegas: The Apex Tunnel Geologic InvestigationBy Ann L. Backstrom
The Apex Tunnel is part of the Southern Nevada Water Authority?s proposed Clark, Lincoln, and White Pine Counties Groundwater Development Project. The project is intended to develop unused Nevada grou
-
Evaluation of engineering controls at bagging operations to reduce exposures to respirable crystalline silica dustBy Justin R. Patts, Andrew B. Cecala, A. KYLE LOUK, Emily J. Haas
The U.S. National Institute for Occupational Safety and Health (NIOSH) and the former U.S. Bureau of Mines (USBM) have put significant effort over the past four decades into researching and developing
-
Geophysical Measurements Related To TunnelingBy Sigmund D. Schwarz
INTRODUCTION In late 1970, an experimental geophysical program was undertaken at the Lake Huron Tunnel for the purpose of developing a geophysical technique that could be applied to determining the
Jan 1, 1997
-
Biological Sulfate Removal And Metal Recovery From Mine Waters (c1afde92-fe36-4599-8994-f5dec7cd867f)By A. L. de Vegt
For the past ten years Paques has been engaged in the development and installation of treatment systems based on biotechnological processes to remove sulfur compounds from water, air and gaseous strea
Jan 1, 1997
-
Rock Mechanics Implications Of Secondary Recovery Under Highwalls - IntroductionBy K. F. Unrug
An overview of the history of mining technology, both past and present, shows that some of the new concepts being successfully applied have changed the reserve categorization and are having an overall
Jan 1, 1983
-
Rochester - Nevada's Newest And Largest Precious Metal Project - Introduction And HistoryBy M. R. Carter
The Rochester Mining District is located some twenty-five miles NE of Lovelock, Nevada. The District was discovered and named in the 1860's by prospectors from Rochester, New York. For a number
Jan 1, 1987
-
Managing The Drill And Blast ProcessBy L. W. Berry
Drill and blast planning is critical to successful mine production, both in timing and in results. However, typical planning, reporting, and information exchange usually involves large quantities of d
Jan 1, 2011
-
Shaft Sinking In Difficult Ground Conditions For The LEP Project, Geneva, SwitzerlandBy F. Dieu, C. Laughton
CERN, the European Laboratory for Particle Physics, is, at present, constructing an underground tunnel and cavern network to house a Large Electron Positron (LEP) colliding beam machine. This paper
Jan 1, 1987
-
Muestreo De Lin Yacimiento De Mineral Para Los Estudios De Viabilidad Y Pruebas MetalurgicasBy A. J. Sinclair
Los métodos de desmuestre para estudios de viabilidad dependen de las características geológicas del yacimiento que ha de ser evaluado. Se requiere un estudio geoestadístico preliminar, teniendo en cu
Jan 1, 1982
-
Distribution Of Injected Oxygen In A Large Underground Flooded Region Of Broken OreBy R. L. Braun
In situ chemical mining of primary sulfide ore requires distribution of injected oxygen in a large underground flooded region of broken ore. Although the maximum oxygen content of the leach solution w
Jan 1, 1974
-
Past And Present Trends For Mine Power SystemsBy John A. Dunn
The history of underground coal mining has developed through the years from a manual digging and loading process to the highly mechanized pro- cess that it is today through the use of electric power.
Jan 1, 1964
-
Evaluation Of Postmining Land Use Plans Using Fuzzy Set Analysis (3898e7dd-f300-4013-8291-f19d0d631f37)By R. J. Sweigard
Estimated costs and revenues can be used in the evaluation of post- mining land use alternatives. However, post-mining land use decisions have to be made in an environment complicated by several addit
Jan 1, 1986
-
Responsible coal sourcing - taking the next stepBy R. Strandahl
As one of the largest private utilities globally, E.ON currently operates hard coal fired power stations in with a total installed capacity of some 20.000 MW: These thermal power plants consume domest
Jan 1, 2011