Design of the Epping to Chatswood Rail Line, Sydney, AustraliaBy Jim Rozek, Robert A. Gee
The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc
Jan 1, 2005
-
Geotechnical Baseline Reports for Construction - Second EditionBy Randall J. Essex
The Construction Institute of the American Society of Civil Engineers recently published the second edition of a 1997 publication on geotechnical baseline reports. The new publication, called Geotechn
Jan 1, 2008
-
Rapporteur?s Report Session III: Exposure To Grunerite (Amosite) Asbestos: Historical Perspectives Of The Health EffectsThe development of information concerning mesothelioma in South Africa started with the 1959 finding of Dr. J. Christopher Wagner of cases of mesothelioma in persons living in the vicinity or working
Jan 1, 2008
-
Industrial Minerals 2004 – Fuller’s EarthBy R. L. Virta
Sixteen companies mined fuller’s earth in 11 states during 2004. Production during 2004, based on a preliminary survey of fuller’s earth producers, was 3.96 Mt (4.3million st) valued at $340 million.
Jan 1, 2005
-
Thermal Stability Of Low Melting Point NaNO3-NaNO2-KNO3 Ternary Molten Salts For Thermal Energy StorageBy T. Wang
A new generated NaNO3 ? NaNO2 ? KNO3 ternary thermal energy storage system which has low melting point as 124°C and high specific heat capacity was studied for the short and long?term thermal stabilit
Jan 1, 2012
-
Performance Monitoring Of Block Cave Mines Using Signal Processing And Waveform Analysis Of Gps DataBy D. Rutledge
Discrete (digital) signal processing techniques are proving to be very valuable tools for miners using the block cave method. Waveform analysis of different measured signals associated with active mi
Jan 1, 2008
-
The assessment of noise from block cutting machines using the P-wave velocityBy M. S. Delibalta, S. Kahraman, R. Comakli
The block cutting machine is one of the most important noise sources in the stone processing factories. In this study, the assessability of the noise from the block cutting machines in the stone proce
Jan 1, 2011
-
Value Creation Through Strategic Mine Planning and Cutoff Grade OptimizationThe OptiPit® software program is developed based on expertise gained at the Colorado School of Mines (CSM) using Mixed Integer Linear Programming (MILP) techniques. This program has been developed to
Jan 1, 2007
-
HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground - SME Annual Meeting 2024By D. Scott Scovira, Karl Dufresne
Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron
Feb 1, 2024
-
Short Tunnels with Shallow CoverBy David Smith
Construction of a new transportation link frequently requires crossing under an existing highway or railroad. Although traffic diversions may permit a cut and cover structure to be built, ‘zero impact
Jan 1, 2005
-
Development Of Matrix-stabilized Repository Backfill (Gesav-ii-project) And Further R & D Prospects - SME Annual Meeting 2022By H. Mischo, F. Daniela, L. Schaarschmidt, I. Paschke
In order to safely store radioactive waste long-term, HAW repositories in saliferous formations have to be backfilled. The main purpose of those backfill operations is the restoration of the geologica
Mar 2, 2022
-
Successful Completion of LA Metro Regional Connector Transit Project - RETC2023By Mike Harrington, Tung Vu
The Regional Connector Transit Project is a 1.9-mile-long underground light rail system that will connect LA Metro’s A (Blue), E (Expo), and L (Gold) Lines in downtown Los Angeles. This $1.75-billion
Jun 13, 2023
-
Semi-Autogenous Grinding Performance With Large Diameter Grinding BallsBy John S. Wakeman
The progress results of a pilot plant study on the effects of ball top size and other mill operating parameters are reported. Test series on taconite and quartzite crude ores using a 1.7m diameter pri
Jan 1, 1984
-
Tunneling?Pipe Jacking of Large Diameter Pipes in O?Hare International AirportBy Mohammad Djavid
The one-pass tunneling pipe jacking method has often been the most schedule and cost efficient method for the pipe line installation. The main challenges in jacking pipes larger than 108 inches and fo
Jan 1, 2008
-
Geostatistical Assessment And Quantification Of Uncertainity Of Methane In The Caved And Fractured Zone Of Longwall MinesBy C. Özgen Karacan
The formation of the gas emission zone in longwall mining and the potential amount of gas in this zone are factors of local geology and spatial variability within this geology. Therefore, geostatistic
Jan 1, 2012
-
Under Pressure: Geotechnical Forces and Conditions at Work on the Ohio River Tunnel Project - RETC2021By Ross Goodman, Jesse Salai
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges such as crown and invert instability due to the overstress condition affecting the strata above, below, and in the
Jun 13, 2021
-
Commodity Currency In The Third WorldBy F. H. Buttner
Commodity currency intrigues most of us because of the problems it offers to solve for the Third and the First Worlds. What problems might be solved, if commodity currency were to be adopted in the Th
Jan 1, 1978
-
The Scientific Rationale For A Lower Radon Daughter ExposureBy Rafael Moure
On April 21, 1980 the Oil, Chemical and Atomic Workers Union (OCAW) submitted a petition urging the revision of the Mine Safety and Health Administration (MSHA) permissible exposure limit to radon dau
Jan 1, 1981
-
Using Slope Design Fundamentals and Technology for Slope Steeping on a Final Wall at the Goldstrike OpenpitBy Jeff Mattern
"Slope performance monitoring, dependable operational practices and ongoing collection of geologic data in openpit slopes all provide valuable information for quantifying potential steepening of subse
Dec 1, 2018
-
Technical Note - Sizing bulk handling equipment for maximum outputBy G. T. Lineberry, L. Adler
Due to safety-imposed constraints on clearances for mobile bulk handling equipment, it is necessary to optimally select a unit based on speed and size. The unit cannot be both large and fast. Since ou
Jan 10, 1985