Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    The Sir Adam Beck II Intake Tunnels—Homage To The Builders

    By Clair Murdock, David Heath

    The 1,280 MW Sir Adam Beck II Hydroelectric Project was constructed in the1950s, at Niagara Falls, Ontario, Canada. The twin intake tunnels total over 17 kilometers in length and pass deep below the C

    Jan 1, 2007

  • SME
    Concentrator Expansion at Freeport Indonesia’s Grasberg Operations

    By Rick Coleman

    PT Freeport Indonesia’s (PTFI) latest expansion has increased total mill throughput to 125kt/d (137,700 stpd). The most recent expansion included the installation of a semiautogenous mill (SAG) desig

    Jan 1, 1996

  • SME
    Design And Development Of The Northeast Layback Of The Betze-Post Open Pit

    By Nick Rose, Robert Sharon, Mark Rantapaa

    Development of the Northeast Layback of Barrick’s Betze-Post open pit commenced in June 2000 and was successfully completed to a height of 400m (1,300 ft) in January 2003. Following a brief exploratio

    Jan 1, 2005

  • SME
    Regulating Mechanism of the Coal‑Based Reduction Reaction Behavior of Jinchuan Ferronickel Slag: Equilibrium Phase Composition, Kinetics, and Phase Transformation

    By Yonghong Qin, Songbo Ma, Qi Zhang, Peng Gao, Jianwen Yu

    Herein, the coal-based reduction was proposed to utilize the ferronickel slag of Jingchuan company. An excellent index with metallization rate of 99.22%, iron grade of 77.91%, and iron recovery of 92.

    May 24, 2022

  • SME
    Steps outlined to ensure precious metals miners have good relationships with their refiners

    By P. D. Chamberlain, R. M. Nadkarni, D. J. Kinneberg

    Introduction The relationship between precious metal miners and gold refiners has been uneasy over the years. Reasons for this uneasiness and lack of trust include technical factors, economics of sca

    Jan 10, 1986

  • SME
    Tectonic Environment And Petrogenesis Of Gold-Bearing Volcanics Of Hutti Greenstone Belt, Dharwar Craton, India

    By M. S. Riyaz Ulla

    The Hutti Greenstone belt, located in the northern side of Dharwar Craton, India, contains several promising gold fields. It is predominantly composed of meta-volcanics with minor intercalations of me

    Jan 1, 1993

  • SME
    Enhanced Settling Of Fine Silica By Indirect A.C. Electrocoagulation

    By R. O. Ifill

    Alternating current electrocoagulation (AC/EC) may be an alternative to chemical coagulation in the thickening of tailings in the mineral, coal and petroleum industries. In the current study, ground s

    Jan 1, 2011

  • SME
    Small Mines Development in China's Gold Mining Industry

    By Xie Longshui

    INTRODUCTION The gold production is from the state-owned gold mines, the local gold mines and the by-product of metal mines. Since 1975, the small gold mines have developed in rapid strides. Curre

    Jan 1, 1987

  • SME
    Coal Availability Studies, Fruitland and Menefee Formations, San Juan Basin, New Mexico (5cdda138-97f6-47d0-aaa8-3acb0981a597)

    By G. E. Jones, G. K. Hoffman

    Through the USGS National Coal Availability pro-gram, two San Juan Basin studies have been completed. The study areas are in the northwest Bisti field, Fruitland Formation and in the eastern Standing

    Jan 1, 2000

  • SME
    2016 permeation test results for grouts made with ultrafine cement

    By Ali Nazem, Rennie Kaunda, Zoheir Khademian, Fei Wang, Raymond Henn, Alex Peretiatkol

    "The field demonstration portion of the Underground Grouting and Ground Improvement (UG&GI) short course offered by the Colorado School of Mines was held on May 18, 2016 at Baski Inc.’s Yard in Denver

    Mar 1, 2017

  • SME
    Developments In Continuous Vat Leaching

    By V. I. Lakshmanan, Dan A. Mackie

    Traditional vat leaching methods have had limited success, primarily due to the high cost of loading and unloading the vats. In general, such batch methods are labor-intensive and costly. Heap lea

    Jan 1, 1990

  • SME
    Selection, Design, And Procurement Of North America?s Largest Mixshield TBM For Portland, Oregon?s East Side Cso Tunnel

    By Christof Metzger

    This paper discusses the process utilized by the Kiewit?Bilfiger Berger Joint Venture (Contractor) to select, design, and procure the largest mixshield tunnel boring machine (TBM) ever implemented in

  • SME
  • SME
    An Evaluation Of The Strength Of Slender Pillars

    Pillars with width to height ratios of less than 1.0 are frequently created in underground hard rock mines. The strength of slender pillars can be estimated using empirically developed equations. Ho

    Jan 1, 2006

  • SME
    Variable Speed Drives For Semiautogenous Mills (cde19d26-f38d-4e52-95a2-cfbef9b9a1b7)

    By John H. Bassarear

    Large scale equipment can reduce both capital and operating costs for concentrators. Large semiautogenous mills can be effectively utilized in big mills but they must be kept fully loaded to take adva

    Jan 1, 1985

  • SME
    Deep Soil Loosening Equipment For Prime Farmland Reclamation

    By Yoginder P. Chugh

    The control of soils has been found to be one of the highest priority factors influencing the return of reclaimed prime farmland to production. The compaction of soil is primarily a result of the move

    Jan 1, 1985

  • SME
    Bougainville Copper Concentrate Slurry Pumping System ? Introduction

    By Robert D. Coale

    This paper will describe the copper concentrate slurry pipeline and pumping system between the concentrator and the port at Bougainville Copper Ltd. The operations of Bougainville Copper Ltd. are loca

    Jan 1, 1974

  • SME
    Design and Construction of Dulles Airport Tunnels

    By Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field

    With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn

    Jan 1, 2007

  • SME
    Long-Term Changes In Selected Spoil Characteristics On Reforested Surface-Mined Land

    By P. Conrad

    Experience has shown that, since the passage of the Surface Mining Control and Reclamation Act, over-compaction of spoil during the reclamation process has severely limited tree growth on reclaimed la

    Jan 1, 2008

  • SME
    What You Told us about Mining Engineering and You

    By Marianne Snedeker

    In January we published a questionnaire asking about the content of MINING ENGINEERING and about your interests. At the same time we hired an outside firm, READEX Inc., of St. Paul, MN, to send the sa

    Jan 6, 1982