Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Variograms Of In-Situ Coal Washability Data (6100c564-d6fe-4945-acf2-543712a574b5)By Young C. Kim
Because of the high cost of obtaining coal washability samples, it has been difficult to obtain washability variograms in the past. As a result. It could not be determined if geostatistical prediction
Jan 1, 1988
-
Field Verification Of Sham Resistance EquationsBy Justus B. Deen
Given that the majority of mine ventilation operating costs are imposed by shafts, the need to predict the resistance of a planned shaft with reasonable accuracy is important. During conceptual design
Jan 1, 1991
-
Improvements in conveyor belt fire suppression systems for US coal mines - SME Transactions 2010By J. H. Rowland, A. C. Smith, K. A. Teacoach
Current regulations for fire suppression systems in underground coal mines to protect conveyor belt installations have been in place since the Coal Mine Health and Safety Act of 1969 was enacted. Over
Jan 1, 2010
-
Automated Fine Coal Circuit Control: The Key to Improved ProfitabilityBy Richard D. Christie, K. Jay Pillai
In the past, it was not unusual for coal preparation plants to discard fine run-of-mine coal. This practice has changed due to increasing quantities of fine material, improvements in beneficiation met
Jan 1, 1994
-
Ice PillarsBy D. L. Kuck
Water ice pillars far underground mine roof support can be frozen and/or maintained and/or melted on demand. The system to do this consists of a refrigeration brine chiller, brine circulation system
Jan 1, 1988
-
Determinants Of Mineral Supply And Depletion Issues - Case Of Fossil FuelsBy K. H. Al-Rawahy
Mineral resources comprise of metallic, non-metallic, and fossil fuels. Our civilization, and the associated economic and industrial developments are inherently dependent on the availability and use o
Jan 1, 2007
-
Minerals Processing 1993In his keynote address at the 18th International Minerals Processing Conference (IMPC), R.P. King, director of the University of Utah Comminution Center, said "it will be the application of very funda
Jan 1, 1994
-
Update On Continuous Miner Dust Scrubber Applications (8d44e2eb-fdaf-48c0-8871-3f64a22e7bdf)By N. I. Jayaraman
Dust scrubbers on continuous miners are steadily gaining in popularity. Recent Bureau of Mines research on scrubbers is reviewed, with emphasis on the following areas: * Development of a new type of
Jan 1, 1989
-
Environmental Aspects Of Mining Developments In Papua New GuineaBy V 9. 0 / 300 dpi
Papua New Guinea (PNG) stretches from the equator to Latitude 12° South and from Indonesia's Irian Jaya Province in the west to the Solomon Islands in the east (Figure 1). The population totals 3
Jan 1, 1988
-
Cost Of Coalmine CatastrophesBy D. W. Alexander
Mine fires, explosions, spontaneous heating and inundations are among the leading causes of catastrophes (unplanned, temporary sealing and recovery of major mines). Many reports are available that de
Jan 1, 2003
-
Matching Longwall And Continuous Miner Productivity RequirementsBy R. L. Grayson, M. P. Miano, S. Yuan
Matching the productivity gains of continuous mining machines with the increasing performance levels achieved by longwall units has required creative thinking to assure that development is completed i
Jan 1, 1995
-
Construction Of First 20-Foot Diameter Machine-Bored Raised ShaftsBy R. A. Pond
Two 6.17 m (20 ft 3 in.) diameter raises, concrete-lined to 5.49 m (18 ft) inside diameter, were completed in 1978 at the Monterey Coal Company Number One Mine near Carlinville, Illinois, by Frontier-
Jan 1, 1979
-
Ultrasonic's Application To Fine Coal RecoveryBy H. E. Bonner
The recovery of fine coal has historically had limited success due to the intimate clay association on the surfaces of the coal particles. This clay presence has detrimentally affected conventional be
Jan 1, 1989
-
Back Analysis Of Plane And Wedge Rock Slope Failures Using Microcomputer ProgramsBy E. M. Frizzell
This paper addresses the use of the microcomputer programs BACKONE and BACKWEDG for an estimation of rock mass strength characteristics by back analysis of plane and wedge failures. The artificial sup
Jan 1, 1988
-
Assessment Of Pillar Load Transfer At Two Multiple-Seam Mine SitesBy R. J. Matetic
The Bureau of Mines, as part of a program to improve mine planning and development, is currently investigating the effects of pillar load transfer, which can impact mining operations within a multiple
Jan 1, 1989
-
The Role of Geology in the Design of Drilling ProgramsBy David R. Shaddrick
Ore reserves are based on sampling developed by drilling programs. Correct choices concerning the type of drill to be used, depth of drilling, hole orientation and sample spacing are not only critical
Jan 1, 1987
-
Variation in dust levels with continuous miner positionLittle knowledge is available that considers the effects of continuous miner position on the possible respirable dust exposure of the remote mining-machine operator. Such information could be very use
Jan 1, 2000
-
Marketing And Transportation As Related To The Feldspar IndustryBy S. Eugene Mills
Twenty-five years ago, when I began my sales life marketing minerals, there was little or no contact between sales people and production people. In those days, it was not uncommon for me, as a salesma
Jan 1, 1977
-
Conveyor Conversion Cuts CostsBy David G. Rasmussen
With low commodity prices and continuing high operating costs, the mining industry must revise planning and operating to take advantage of every tool available. Conveyors operated within open pits are
Jan 1, 1983
-
Grinding Mill Rubber Liner SystemsBy S. McTavish
Since mechanically suitable grinding mills were available in 1908, mill operators have been searching for the best material and design with which to line the mills. These liner systems had to fulfill
Jan 1, 1989