Innovative Drilled Shaft Installation Process Through Existing Bridge FoundationsBy Tracy Brettmann
The Highway 146 Bridge Expansion Project across the Clear Creek Channel in Houston, Texas was designed on driven precast concrete piles. However, during construction, the piles along one side of the b
May 1, 2022
-
Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case StudyBy M. Kumaran, A. Vetriselvan, A. Purantharan
"This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con
Jan 1, 2017
-
Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich BridgeBy Andrew Peterson
The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi
Jan 1, 1999
-
DFI and NDT – Parallel Histories and Mutual BenefitsBy Bernard H. Hertlein
"When the Deep Foundations Institute (DFI) was founded, quality assurance and quality control (QA/QC) of foundation construction was rudimentary. Nondestructive testing (NDT) was a nascent technology,
Jan 1, 2017
-
Static And High Strain Dynamic Test Co-Relation Studies On Cast-In-Situ Concrete Bored Piles - SynopsisBy N. V. Nayak
Maharashtra State Road Development Corporation Ltd., has initiated a scheme for construction of 55 flyovers in Mumbai in India. To ensure speedier completion of projects several new technologies were
Jan 1, 2000
-
Experiences From The Italian High Speed Rail Network AV ConstructionBy Vincent Jue
In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.
Jan 1, 2010
-
Ground Support And Its ToolboxBy G. Sauer
"More Skill is needed to avoid rather than to handle heavy ground loads." This finding, from a tunneling engineer of the nineteenth century, is still relevant today with all advanced sequential excava
Jan 1, 2003
-
Lateral Load Testing Micropiles To Evaluate The Impact Of Threaded Joints And Casing Embedment On Short Micropiles In Shallow RockBy J. Brian Anderson
Jointed micropiles were investigated to support bridge foundations where shallow rock was present. In this application, micropiles would have some amount of unsupported length, and would be subject t
Jan 1, 2011
-
Augered Cast-In-Place Piles Deep Foundations Institute (DFI) 1988 Annual Meeting - Ritz-Carlton Hotel In Atlanta (Buckhead), GeorgiaBy James J. Neate
The augered cast-in-place pile system came into use in the late 1940's where various techniques were tried using pressure grouting methods. In the early development stages some piles were install
Jan 1, 1988
-
Ground Freezing Combined Method for Urban Tunnel ExcavationBy Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto
"The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three
Jan 1, 2015
-
A Cut And Cover In Stiff Clay In Eurre-France - SynopsisBy R. Stenne
This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly
Jan 1, 2000
-
Söderströmstunneln – An Immersed Tunnel Founded on Steel Core PilesBy Frank Haehnig, Kjell-Åke Averstad, Johannes Glückert
"AbstractThe Söderströmstunneln is part of the Citybanan project that is currently under construction in the centre of Stockholm. Main part of the lot Söderströmstunneln is a 300m long immersed tunnel
Jan 1, 2014
-
Threading Piles Past Underground Assets In Central LondonBy Alexander Nikolic
The paper presents the foundation design and construction of a landmark urban redevelopment scheme in central London, UK. The scheme comprises the new Tottenham Court Road Underground station, Crossra
Jan 1, 2011
-
Holding Back The Watchung MountainsBy Ryan C. Linthicum
A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains
Jan 1, 2003
-
Static-Load Hydraulic Piledriving: An Alternative System For Noise & Vibration-Sensitive Applications ? IntroductionBy Robert A. Field
Static-Load Piledriving systems utilize hydraulic push to advance piles into the ground. Dynamic systems (ie. hammers and vibratory equipment) utilize impact, or vibration, to advance the piles. S
Jan 1, 1995
-
Material Properties for Analysis of Deep Mixing Support SystemsBy Alex Grenoble, Alex Reeb, George Filz, Farzad Abedzadeh
"This paper summarizes available information on the characteristics and properties of deep-mixed soilcement produced by the wet method. The topics covered in this paper include: unit weight, unconfine
Jan 1, 2015
-
High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case StudyBy James Weaver
During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari
Jan 1, 2011
-
Urban Legends: Two Case Studies That Redefine "Impossible"By Grant R. J. Bearss
Due to environmental concerns in urban construction, many typically simple projects become very complex or feasibly impossible. The introduction of relatively new concepts has redefined "impossible",
Jan 1, 2002
-
Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building TechnologiesBy P. Arz
With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al
Jan 1, 1989
-
Caisson Design And Construction, Upstream Guide Wall, Locks And Dam No. 26By E. C. Demsky
This paper describes the large diameter caisson foundation for the upstream guidewall at the Lock and Dam No. 26 (Replacement) Project. The guidewall is supported on two rows of 1.8-m diameter concret