Use Of Controlled Modulus Columns In Retail & Industrial Development ProjectsBy Frederic Masse
With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f
Jan 1, 2011
-
Design Of Axially Loaded Compression Piles According To Eurocode 7By Bauduin C. Besix
The Eurocode 7 "Geotechnical Design" is based on "Limit State Design", tackling the uncertainties as much as possible at their source through: - selection of characteristic values of variables (load
Jan 1, 2002
-
Disconnected Piled Raft Foundations Performance (DCPRF) With CushionBy Saeed Salehi Malekshah
In hybrid foundation system or piled raft foundation (PRF), the raft has adequate bearing capacity and piles are usually required to ensure overall stability of foundation and also to act as settlemen
Jan 1, 2011
-
Installation Of Augered Cast-In-Place Piles - Equipment (b596934a-6910-4dd1-8c4a-72745306d21b)By Tracy Brettmann
? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2001
-
Oldie But Goldie – Bi-Directionally Tested Foundation Piles With Base Enlargement As A Smart And Economical Alternative To Conventional Piles At Geneva, SwitzerlandBy Dipl. -Ing. (FH) Thomas Schmitt, Dr. Melvin England
Foundations in Geneva are difficult and expensive due a large overlayer of clay and silt above competent bearing material in the moraine. Common foundation schemes use deep barrettes or bored piles, f
May 1, 2022
-
Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult GeologyBy Steni Stefani, Sanjay Dave
"This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th
Jan 1, 2017
-
Dynamic Analysis Of Follower Driven Piles For The Venice Flood Gate ProjectBy Frank Rausche
Without doubt, driven piles are the most economical deep foundation element for a nearshore environment, providing for high bearing capacities and stiffness, quick installation times, assured quality
Jan 1, 2006
-
Pile Lateral Behaviour under Full Scale Lateral Load Tests in Thick Compacted Marine Carbonate Sand Fill of an Artifical IslandBy Challa Venkata Rami Reddy, Anindya Roy, G. R. Konni
This paper presents the results of pile lateral capacities obtained from both conventional design and fullscale pile lateral load tests. Conventional design using P-Y curve analysis is very commonly b
Sep 8, 2021
-
Small-Strain Behaviour of Artificially Cemented Sand in Deep Mixing ApplicationBy Stephen Darmawan, Mahdi M. Disfani, Arul Arulrajah, Alireza Mohammadinia
Deep mixing using cementitious compounds is an in-situ method of ground improvement for improving the strength, compressibility of loose sand. Artificial light cementation can increase the stiffness o
Jan 1, 1900
-
Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2007
-
Cost Effective Excavation Support in SeattleBy Richard D. Luark, Fernanda S. Madrona
Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure
Jan 1, 2019
-
Contribution of Inner Frictional Resistance to Bearing Capacity of Open-Ended PilesBy Janaka J. Kumara, Takashi Kurashina, Yoshiaki Kikuchi, Takahiro Yajima
"The inner frictional resistance of open-ended piles depend heavily on the degree of soil plugging. Many factors including pile diameter, relative density and end conditions of the piles influence the
Jan 1, 2017
-
Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
The Dutch Cone Penetration Test And Its Use In Determining The Pile Bearing CapacityBy C. Van der Veen
The use of the quasi static (Dutch) Cone Penetration Test (CPT) is described as a tool to predetermine the ultimate bearing capacity of the pile point. An analysis is given why a purely theoritical ap
Jan 1, 1989
-
Results Of Dynamic And Static Load Tests On Helical Piles In The Varved Clay Of MassachusettsBy Jorge Beim
Helical Piles are increasingly being used to support and rehabilitate structures subjected to compressive axial loads. Traditionally, empirical correlations between installation torque and load capaci
Jan 1, 2012
-
Three-Dimensional Numerical Modelling of Load Distribution and Settlement of Pile GroupsBy Onur Kacar
A numerical approach has been implemented to assess the settlements of pile groups bearing in clay. A three-dimensional finite element program has been utilized to model a vertically loaded spread foo
Jan 1, 2018
-
Pile Load TestsCase I- Timber Pile Test- 4 pages describe the pile driving record, the pile load test and the boring log. Case II- 24 inch square prestressed concrete pile-5 pages give details about the pile dri
Jan 1, 1988
-
Applications of Nondestructive Testing Methods for Mass Foundation Blocks - Feasibility StudyBy Hamed Layssi, Farid Moradi, Thomas Tingson
This paper describes the feasibility and pilot study of of using existing non-destructive testing solutions for evaluating structural integrity and mechanical performance of mass concrete foundations.
Sep 8, 2021
-
Case Studies Of Driven Tubular Steel Piles In Soils And Basalt On Woolgoolga To Ballina Pacific Highway UpgradeBy Henry Zhang
This paper presents two case studies of large diameter driven tubular steel piles for the ongoing Woolgoolga to Ballina Pacific Highway upgrade (W2B). This project forms part of Australia’s largest re
Nov 1, 2022
-
Determination of Coefficient of Modulus of Sub-Grade Reaction for Free Head Short PileBy Sumit Kumar Biswas, Moyukh De, Sibapriya Mukherjee
"The piles often are also subjected to lateral (horizontal) forces and moments. In fact, there are some structures where the primary function of piles is to transfer lateral loads to the ground. Prope