Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Considerations Regarding the Development of an Economic Mathematical Model for Optimizing the Technological Variants in the Coal Mine Faces

    By Dolea Gabriel Gheorghe

    In the present paperwork is proposed an economical-mathematical model (fuzzy) that aims optimize the technological variants of the mechanized coal face. By fuzzification, the issues to solve become mo

    Oct 1, 2009

  • CIM
    A Contribution to Chloride Hydrometallurgy: Regeneration of Superazeotropic Strength HCL via Reactive Crystallization

    By T. Feldmann, G. P. Demopoulos

    The feasibility of chloride leaching processes depends on interfacing them with cost-effective HCl regeneration technologies. This paper summarizes the most important findings of research conducted in

    Jan 1, 2014

  • CIM
    The Frothbuster - Innovative Thickener Froth Reduction Technology

    By Karla Kaboth, Brad Garraway

    "The surface of many concentrate thickeners has traditionally looked like that of a flotation cell. Over the last three years Normandy Golden Grove Concentrator, in partnership with Outokumpu Technolo

    Jan 1, 2001

  • CIM
    Geometallurgical Modeling of the Dumont Deposit

    "The Dumont deposit is a large (1066 Mt probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporation acquired t

    Jan 1, 2013

  • CIM
    Radon emanation rate studies: Inter-laboratory standard reference materials and the effects of powdering and pelletizing

    By R. H. McCorkell

    Radon emanation rates. J. and compositions of materials from the Canadian Certified Reference Materials Project (CCRMP) indicate that the fraction of the Rn produced that escapes, E, is usually 1% to

    Jan 1, 1986

  • CIM
    Small-scale mining using the modular gold processing unit at the Granada mine, Rouyn-Noranda, Quebec (d2911615-1db3-4ddc-ae0e-f3be18f048cf)

    By P. Trudel, É. Cabot, L. Cabot

    "A modular gold processing unit (MGPU) was designed, installed and operated over an eight-month period by RSW-Béroma at the Granada mine located near Rouyn-Noranda, Quebec. A description of the projec

    Jan 1, 2003

  • CIM
    Mining Methods at Copper Mountain

    By Walter I. Nelson

    THE geology of the Copper Mountain mine has been ably described by Dr. Victor Dolmage in Memoir 171 of the Geological Survey. Reference is invited to that paper for a more extended description of the

    Jan 1, 1941

  • CIM
    Increased ZnS Flotation Response Due to Slime Removal with Methanol Treatment

    By E. V. Manlapig, M. A. Hampton, M. E. Holuszko

    Methanol treatment of ZnS particles has been found to remove slimes and facilitate flotation. The removal of slimes renders the ZnS surface more hydrophobic, resulting in an increase in the hydrophobi

    Jan 1, 2009

  • CIM
    Extraction of No. 2 East Pillar at Waite-Amulet Mines, Limited

    By M. A. Cawley, J. W. Jordan

    "IntroductionTHE ORE PILLARS in the lower ""A"" ore body of Waite Amulet Mines, Limited, can be divided into two groups, those mined in the open by sub-level blast-hole methods, and those to be mined

    Jan 1, 1955

  • CIM
    Trends in the use of Computers in the Mineral Industry in the 1980's

    By D. N. Madge

    The use and development of industrial process control computers in the mineral industry during the 1970's has been sluggish. This cautious approach is due to lack of commitment by senior manageme

    Jan 1, 1979

  • CIM
    Highland Valley Copper's in-pit crushing and conveying system

    By M. D. Scott

    "Highland Valley Copper recently installed a semi-mobile in-pit crushing and conveyor system designed to feed both the Bethlehem and Lornex concentrators with a feed averaging 120000 tonnes per day. T

    Jan 1, 1988

  • CIM
    Processing history at Vale Canada’s (Inco’s) Ontario nickel-copper smelters pre-1950

    By B. R. Conard

    Occupational epidemiology of the nickel-producing industry has found that inhalation exposures to certain nickel-containing substances are linked to respiratory cancers and to nonmalignant respiratory

    Jan 1, 2012

  • CIM
    Quantifying Solidification Path in Rapid Solidification Using 3D Measurements

    By Hani Henein

    Most metals and alloys processed undergo a solidification processing step. Increasingly, there is a growing number of solidification processing routes that involve rapid solidification of the alloy.

    Jan 1, 2016

  • CIM
    Metals

    By Lawrence Bragg

    WE associate metals with hardness, toughness, and strength. But a curious paradox lies at the root of the valuable mechanical proper-ties of the metallic state: in order to be strong, a metal must be

    Jan 1, 1943

  • CIM
    Hydrophobic-Hydrophilic Separation (HHS) Process for Simultaneous Recovery and Dewatering of Fine Particles

    By Minerals Refining Company, Gerald Luttrell, Biao Li, Robert Bratton, Roe-Hoan Yoon, Stan Suboleski, Nikhil Gupta

    Flotation is regarded as the best available method of upgrading coal and mineral fines in the mining industry. However, its efficiency deteriorates rapidly with decreasing particle size. Furthermore,

    Jan 1, 2016

  • CIM
    Comparative Stability Analysis of Tailings Storage Facilities

    By Mosquera. J.

    Tailings Storage Facilities (TSFs) are vast structures that respond to site-specific characteristics, rate of production, placement techniques, and the physical and mechanical properties of tailings.

    Aug 1, 2013

  • CIM
    Production of Paste from Total Tails in a Deep Cone Thickener A Case Study

    By Gregg Hodges, Fred Schoenbrunn, Steve Slottee, Chad McCleary

    "In December, 1999 Stillwater Mining Company (SMC) commissioned a new paste /cement backfill plant to supplement the existing sand backfill system for the cut and fill mining operation at it’s Nye, Mo

    Jan 1, 2001

  • CIM
    A review of binder materials used in stabilized backfills

    By J Petrolito

    "To improve the economic and environmental performance of underground mining operations, it is common practice to return the metallurgical waste material underground as backfill. This is called hydrau

    Jan 1, 2005

  • CIM
    Toward the 24 hour large SAG Mill Reline

    By John Russell

    "Faster, safer, grinding mill relining offers the obvious attractions of reduced mill relining times with the knock-on incentive to reduce all other maintenance down-time, opening the possibility for

    Jan 1, 2008

  • CIM
    Operation of La Mine Doyon

    "At a current mining rate of 3,750 tons per day, La Mine Doyon is currently the largest gold mine in Canada. La Mine Doyon is an open pit gold mine located in the Abitibi area of Northwestern Quebec.

    Jan 1, 1984