Extraction of Tin-Problems and DevelopmentsThe main features and recent developments in the processes of benefication and extractive treatments of tin ores are reviewed. The need for development of processes to recover fine tin, tin from low-g
Jan 1, 1992
-
Computer Methods for Mine Geology at HellyerBy Kuipers A. J
Aberfoyle has been applying computer methods to mine geology in small to medium-sized underground mines since the early 1980's. Recently, the installation of DATAMINE software at the Hellyer Mine
Jan 1, 1990
-
Applicability of NATM to Water-Bearing Sand LayersBy Kurihara M
In Japan, shield tunneling method is generally used to drive a tunnel in sand layers around the urban area. In this report, appli- cability of NATM (New Austrian Tunnelling Method), which uses rock
Jan 1, 1987
-
Preassembly Concepts to Reduce Project Capital CostsBy Kruse JW, Kjar AR
Recently there has been increased recognition o'f the cost savings that can be achieved by the greater use of offsite preassembly for the construction of industrial plants. Preassembly is a me
Jan 1, 1983
-
Suspension Roasting of Pyrite and Copper ConcentrateBy Soma T
Pyrite and Cu-concentrate were roasted in vertically suspended state in an externally heated tube. Tubes of three different lengths of reaction zone were used for three different reaction times. R
Jan 1, 1980
-
Lower Levels Project Development at the C.S.A. Mine, CobarBy Grant BPM
The lower levels at the CSA Mine have been developed to mine reserves between theNo.7 level and No.9 level.Work on major excavations for the project began during 1982 with the develop-ment of the crus
Jan 1, 1985
-
Systhesis of Stochastic Recovery Prediction Cut-off OptimisationBy Vassiliev P
Cut-off optimisation, based on the work of Lane (1988), can be used to maximise the NPV (Net Present Value) of a mine by the judicious manipulation of cut-offs and the use of stockpiles. Apart from
Jan 1, 1998
-
Quality Control Procedures in a Large Iron Ore Open Pit (c7b65b85-9b1f-4f7e-9a27-3d4c3118e681)By Firmin K
The Mt. Tom Price orebody of Hamersley Iron Pty. Limited consists of a folded hematite - shale sequence capped by a layer of goethite. Consequently, variations in iron content occur within the oreb
Jan 1, 1980
-
Instantaneous Outbursts of Coal and GasThe phenomenon of Instantaneous Outbursts, although not new to Australia, was sharply drawn to the attention of the local coal-mining industry by two isolated fatal occurrences on widely separated fie
Jan 1, 1958
-
Pipe Jacking Experience in Tunnelling Through Variable Soils, Brisbane, QLD.By Baczynski NR, Fagan MJ
A 3050m long section of a 1.65m internal diameter tunnel is presently under construction in the Brisbane area by means of the pipe-jacking method. The soils along the alignment had been deposited
Jan 1, 1987
-
Sampling of the Perseverance Nickel DepositBy Allchurch P. D
At Perseverance a reserve of 45 million tonnes at 2% Ni was indicated by drilling. Holes were drilled in trellis pattern on section lines 61m apart to assess shallow mineralization. To explore at
Jan 1, 1976
-
"What do Geostatistics and Cut-Off Grade Optimisation have to do with Real Options Applied to Mine Project Evaluation?"By J Araya, O Leiva
The mine evaluation process, composed of the designing, planning and valuation of a mine project, is, among other variables, based on an estimated orebody model. However, as the information from the d
Sep 26, 2011
-
Results From Induced Polarisation Surveys Over the Beruang Copper-Gold Deposit in Central Kalimantan,IndonesiaThe Beruang Copper-Gold Deposit is located very near the centre of Kalimantan in Indonesia. It is a dacitic tuff hosted deposit currently being explored by Kalimantan Gold Inc of Canada. Exploration a
Jan 1, 2004
-
Pulp Density Soft-Sensor for a Grinding CircuitBy Torres F, Cerda I, Gimenez P, Gonzalez G, Castelli L
Slurry density measurement, specially in cyclone feed streams, is fundamental to grinding circuit control. With the purpose of increasing the availability of such a measurement, the design of a soft
Jan 1, 1995
-
Keynote Address The Problems of Strong Roof Beds and Water Bearing Strata in the Control of Longwall FacesThe difference between a hypothetical and a theoretical approach is considered and the advantages in using a hypothesis is discussed. Virgin horizontal stresses play an important role in stabilisin
Jan 1, 1986
-
Partial Automation of a Dragline Working in Conjunction with a Hopper/Crusher/Conveyor Overburden Removal SystemBy Susanto A
As part of the current NERDDC funded project studying Dragline/Hopper/ Crusher/Conveyor systems for overburden removal, an investigation was carried out to assess the feasibility of automating the
Jan 1, 1989
-
Selective Mining at Ok Tedi - Past, Present and FutureSelective open pit mining for gold has been in progress at Harbour Lights since the onset of mining in March 1985. Selective mining techniques used are similar to those in other recently opened gold m
Jan 1, 1986
-
The Evolution of Cut and Fill Mining at Isa MineBy Wright J
Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t
Jan 1, 1988
-
Mining Methods at Mount LyellTHE millng methods employed in the Mount Lyell Mining and Railway Company's mines are, perhaps, less known to the milling world than those of other important districts, due to the geographical re
Jan 1, 1915
-
Planning for Access to the Deep Copper Orebodies at Mount Isa Mines LimitedBy Slater R
The initial planning and detail design phase leading to the development of a 7.5 m internal shaft to service the deep 3000 and 3500 copper orebodies at Mount Isa, Queensland is well advanced. The
Jan 1, 1982