Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Pongkor Gold Mine (Indonesia) ù Changing From Traditional Handheld Cut and Fill to Mechanical Cut and Fill

    The Pongkor Gold Mine employs 678 staff. The mine is owned by the Indonesian state company PT Antam Tbk and is located 100 kilometres south west of Jakarta, in Java, Indonesia. Mine and infrastructure

    Jan 1, 2002

  • AUSIMM
    QAQC – proactive Quality Management (QM) supporting reconciliation results

    By O Dominguez

    Significant value can be added to ore supplied from the mine to the mill by measuring its quality in real time and performing grade control additional to that within the mine. Responsibility for ore q

    Mar 22, 2022

  • AUSIMM
    Professional Development for Metallurgists – Improving Technical Skills

    By D Drinkwater

    In 2009, Peter Munro and Peter Tilyard examined the “human capital” in the mineral processing sector in a paper entitled Back to the Future (Munro and Tilyard, 2009). One of their major concerns was

    Aug 8, 2011

  • AUSIMM
    Mining Under Indonesia's New Environmental Law

    The new law on Environmental Protection and Management (Republic of Indonesia Law 32 of 2009) was passed by the Indonesian parliament in September 2009. This law aims to protect Indonesia's rapid

    Jun 1, 2010

  • AUSIMM
    Occupational Health in Mining and Metallurgy

    The patterns of occupational health pro- grammes in mining and metallurgy are discussed in relation to the impact of chemical and phy- sical hazards on the health of workers in these fields. Mining

    Jan 1, 1975

  • AUSIMM
    Measuring and Utilising Ore Quality Variability Using Real-time On-belt Elemental Analysis to Improve Mill Feed Quality

    By H Kurth

    "The focus of this paper is on measuring the composition to improve mill feed quality to minimise the processing of waste, optimise process performance, reduce processing costs and minimise the genera

    Oct 10, 2016

  • AUSIMM
    Ventilation monitoring using fibre optics

    By G B. French

    Post a serious heating event underground, and at the direction of the State Mining Safety Authority, a mining company needed to demonstrate the use of cutting-edge technology to mitigate future events

    Oct 12, 2022

  • AUSIMM
    Comparison of two quantitative mineral resource classification methods – a case study from a large copper porphyry-skarn deposit

    By C Artica

    Two quantitative methods for Mineral Resource classification have been applied to a copper skarn deposit beneath a large open pit that is mining a world-class porphyry complex. A drill hole spacing st

    May 24, 2023

  • AUSIMM
    Construction and monitoring of development access into highly stressed rock masses

    By R Talebi

    A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S

    Mar 29, 2023

  • AUSIMM
    Theory of Sampling and geostatistics – the ultimate link

    By D François-Bongarçon

    The link between geostatistics and Theory of Sampling (TOS) is examined again in view of new findings made while trying to compare predicted sampling variances and estimated grades (using geostatistic

    May 9, 2017

  • AUSIMM
    Dingo – an optimisation tool to solve complex short interval control at Telfer underground mine

    By S Graskoski

    The allocation of boggers and trucks at Telfer’s sublevel cave mine is currently assigned by manual techniques, with decision-making primarily dependant on the judgement of the operators and mine cont

    Oct 16, 2017

  • AUSIMM
    Core & Shell Pillar Recovery Stoping in Mount Isa Silver/Lead/Zinc Mine

    Mount Isa mine is the largest underground mine in Australia and is located 2,000 kilometres north-west of Brisbane. This mine has been in continuous operation since 1931 and in 1986/87 the silver/lea

    Jan 1, 1990

  • AUSIMM
    Why I don’t believe in reconciliation

    By S Dunham

    For decades we’ve been focusing on reconciliation as a tool to validate mineral resource estimates. And for decades we’ve been misleading ourselves. The concept of reconciliation is simple. Predict, m

    May 24, 2023

  • AUSIMM
    Brave New Mine – Examining the Human Factors Implications of Automation and Remote Operation in Mining

    By T Horberry

    This paper describes work conducted as part of an overall research project that aims to identify current and emerging trends in the development of automation and remote mining technologies, and to pro

    Nov 22, 2011

  • AUSIMM
    Mine Road Design and Management in Autonomous Hauling Operations – A Research Roadmap

    By R J. Thompson

    In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product

    Nov 22, 2011

  • AUSIMM
    The Development of the Aircore Sampling System

    By J M. Wallis

    Heavy mineral sand exploration drilling prior to the 1970s generally utilised open hole auger and air-blast type drilling. However, mining reconciliations were poor and limitations on accuracy and pre

    Oct 5, 2011

  • AUSIMM
    Assessment of approaches, data requirements and methodologies for estimating long-term pit lake water levels

    By H J. J Boshoff

    Pit lakes, as a final void after completing open cut mining, are in most cases unavoidable. Initial mine designs and approvals require consideration and assessment of closure objectives, legislation a

    Jul 25, 2018

  • AUSIMM
    Health and Safety in the Mining Industry

    The patterns of occupational health pro- grammes in mining and metallurgy are discussed in relation to the impact of chemical and phy- sical hazards on the health of workers in these fields. Mining

    Jan 1, 1975

  • AUSIMM
    Ethics in the Minerals Industry

    By L Brodie-Hally

    In the early-1990s, Tad Golosinski, the former the head of mining department at WASM participated in a review mining engineering courses in Australia. The review team asked various industry executives

    Jan 1, 2002

  • AUSIMM
    Building Partnerships with Indigenous People to Improve their Economic Circumstances to Achieve Social Cohesion and Social Licence to Operate û A Case Study of the West Pilbara, Australia

    The relationships between Aboriginal Traditional Owners and mining companies have often been mired in dispute, particularly since the High Court Mabo decision and the Native Title Act of 1993. In the

    Jan 1, 2009