Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo Simulation

    By D Wyborn, P A. Dowd

    The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r

    Sep 26, 2011

  • AUSIMM
    Syama Gold Mine – the Journey towards a Class-leading Gold Mine

    By R Sinclair, D Landwehr, I Hunter

    "The Syama Gold Mine, located in southern Mali, was established in 1990 by Broken Hill Propriety Limited (BHP). The operation began treating oxide, and in 1994 it transitioned to processing hard and r

    Oct 10, 2016

  • AUSIMM
    Differential Flotation at Warrego Concentrator

    Warrego copper ore characteristically contains 0.05-0.2% bismuth, which on upgrading produces a concentrate of approximately 1.3% bismuth. Early smelting of this concentrate (1973) was accomplishe

    Jan 1, 1984

  • AUSIMM
    Production and Utilization of Uranium in Nuclear Reactors

    A brief descri;tioki is given of nuclear power reactors and their fuels. These fuels are made from a variety of uranium compounds such as uranium dioxide, and uranium carbide as well as uranium meta

    Jan 1, 1968

  • AUSIMM
    ACARP Belt Press Filter Design, Operation and Maintenance Handbook

    By D Eschebach, D Mathewson

    A belt press filter (BPF) handbook containing practical information for the reference of plant designers and operators has been created as part of Australian Coal Association Research Program project

    Jul 27, 2015

  • AUSIMM
    Pilot Scale Study of De-silverising and De-bismithising of Lead by Fractional Crystallisation with Reflux

    By Iley J. D, Siviour N. g, Moffatt R. J

    The process of desilverising by fractional crystallisation with reflux was investigated through laboratory batch tests and continuous laboratory bench scale tests at CSIRO Clayton, to a 300 kg/hr p

    Jan 1, 1989

  • AUSIMM
    Waste Recycle in the Catalytic Waste Converter

    By T C. Hughes, R Hughes

    Ausmelt has developed and commercialised high temperature reactor technology that has been applied to waste processing in the form of a catalytic waste converter (CWC). Ausmelt Technology uses a top s

    Jan 1, 2000

  • AUSIMM
    Gold-Rich Porphyry Copper Deposits of the Circum-Pacific Region - an Update Overview

    Gold-rich porphyry copper deposits areimportant sources of gold in the circum-Pacific region: 26 major deposits contain >7000 tonnes of gold. The deposits occur in a variety of subduction-related sett

    Jan 1, 1990

  • AUSIMM
    Evolution in Panel Caving Undercutting and Drawbell Excavation, El Teniente Mine

    By P Yß±ez, G Ferguson

    The El Teniente mine produces more than 340 000 tonnes of fine copper per year from an industrial complex of underground mine, concentrator and smelter. Mass caving methods are employed to deliver app

    Jan 1, 2000

  • AUSIMM
    A Case Study In Ore Reserve Procedures At Mount Lyell

    By Rowe J

    The case study is based on the largest ore deposit at Mt. Lyell; the Prince Lyell deposit, comprising a regular lensoid mass of dissemina- ted and vein pyrite-chalcopyrite mineralisation. Reserve est

    Jan 1, 1979

  • AUSIMM
    Optimisation of Mines and Smelters by the Application of Improves Computing Systems

    By Quayle J. E

    This paper covers period from 1973 through to 1988 and the mines of West Coast Mines, Elur Mine, North Mine and Risdon Zinc Smelter, now all part of the Pasminco Group. During this period, optimisat

    Jan 1, 1991

  • AUSIMM
    Composite Wear Resistant Materials for Crushing, Grinding, and Screening Abrasive Ores

    By Norman TE

    The design of composite materials for wear resistant service aims at com- bining two or more materials in such a way as to achieve unique and useful properties not generally available in any single

    Jan 1, 1978

  • AUSIMM
    Developing and Implementing Ore-Specific Targets for the Rosebery Concentrator

    Production targets are the basis for almost every decision made by operations personnel in the daily operation of a concentrator. It is the production targets that determine how the plant is operated

    Oct 29, 2012

  • AUSIMM
    Guidelines for the Design of Rope Guides

    Rope guides, consisting of ropes spanning between anchor points at the top and bottom of shafts, have frequently been considered as a viable alternative to fixed guides, comprising buntons and guides.

    Jan 1, 2005

  • AUSIMM
    Performance of fully mechanised rock reinforcement using self-drilling anchors with pumpable resin technology

    By P Jere

    Mechanically coupled rock bolts encapsulated in cementitious or polyester cartridge resin grouts have been widely adopted for various underground rock reinforcement applications. Resin grouts are cons

    Mar 29, 2023

  • AUSIMM
    A 3D Discrete Event Simulation Model of a Truck-shovel Network System

    By W Zeng, D Walker, D Cai, E Baafi

    "The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv

    Nov 15, 2016

  • AUSIMM
    Bed Load Losses from Experimental Plots on a Rehabilitated Uranium Mine in Northern Australia

    By W D. Erskine, M J. Saynor

    Ranger Uranium Mine, surrounded by Kakadu National Park is located in the Alligator Rivers Region (ARR) in the wet-dry monsoonal tropics, 250 km east of Darwin, Northern Territory. A trial landform (T

    Jun 28, 2016

  • AUSIMM
    Coalmine ventilation – examining the past, looking to the future

    By J M. Galvin

    History attests to the catastrophic consequences that fire, explosion and contaminated, noxious andirrespirable atmospheres can have for workplace health and safety in underground coal mining. It also

    Oct 12, 2022

  • AUSIMM
    Energy Dissipation in Long-Distance Slurry Pipelines

    Energy Dissipation in Long-Distance Slurry Pipelines

    Sep 13, 2010

  • AUSIMM
    A Fully Integrated Approach to Mine Planning for Proposed Mineral Sand Projects

    This paper examines the complex interplay of deposit characteristics, mining plans, tailings disposal techniques and rehabilitation requirements on planning for mineral sands operations. All component

    Jan 1, 2001