Search Documents

  • IOM3
    Geology, mineralogy and genesis of gold mineralization at Calliachet-Urlar Burn, Scotland

    By R. A. D. Pattrick, R. A. F. Ixer

    Paper presented at Mineralisation in the Caledonides, the Mike Gallagher memorial meeting held in Edinburgh, 27-28 June 1996. At Calliachar Burn, 14 steeply dipping quartz-sulphide veins, with and wit

    Jun 19, 1905

  • ABM
    Influência Do Ciclo De Resfriamento Nos Aspectos Dimensionais De Discos Cerâmicos No Processo De Injeção Em Baixa Pressão

    By Eduardo Thomazi

    Este trabalho apresenta o estudo da influência do ciclo de resfriamento em discos cerâmicos produzidos pelo processo de moldagem por injeção em baixa pressão (MIBP). Foram injetados discos utilizando

    Aug 7, 2018

  • CIM
    The Application of Heavy Media Separation to Concrete Aggregate

    By R. A. Wyman, F. E. Hanes

    THE demand for high-quality aggregate is increasing in all phases of the construction industry and in all organizations associated with road building in Canada. The production of aggregate in Canada h

    Jan 1, 1962

  • SME
    Boring At High Thrust And Its Potential In The Hard-Rock Mining Industry In South Africa

    By J. W. Wilson, P. C. Graham

    SUMMARY The Witwatersrand quartzites in which South African gold mining operations are moat exclusively conducted, are notoriously difficult and costly to drill. Despite this situation, however, wi

    Jan 1, 1974

  • NIOSH
    Slurry Transport Properties of Graded Coal Waste

    By Robert W. McKibbin

    The Bureau of Mines conducted laboratory tests to determine the slurry transport and deposition properties of coal waste. A 188.5-ft pipe test loop was constructed with instruments to measure density,

    Jan 1, 1983

  • ISEE
    Blast Master Plan: the Key to efficiency and optimization. Case study at Ellatzite copper mine.

    By Grigor Mishev, Georgi Petrov, Benjamin Cebrian

    Before designing a single blast or all the blasts on a pit level, it is critical to assess the main goal on each. To do this, a series of constraints must be taken into account: wall protection, vibra

    Jan 1, 2016

  • DFI
    Prediction of Axial Geotechnical Resistance of Base Grouted Drilled Shafts

    By Emad Farouz, Ehab S. Shatnawi

    "The increasing demand for small deformations and high-capacity drilled shafts without enlarging drilledshaft diameters has motivated the development and increasing use of a base grouting (BG) techniq

    Jan 1, 2016

  • AUSIMM
    Blasting Near Mine Surface Infrastructure

    By A J. Moore

    Blasting operations in open cut mines results in airblast, ground vibration and rock movement with the potential for wild flyrock. In some mines there is a trend towards blasting closer to established

    Nov 8, 2011

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007

  • TMS
    Doe Run Company's Resource Recovery Facility

    By A. W. Worcester

    The plant is designed to produce 60,000+ tons of refined lead per year from a nominal feed consisting of 110,000 tons of SLI and industrial batteries, and 10,000 tons of lead contained in drosses and

    Jan 1, 1990

  • AUSIMM
    Simulation investigation of flow patterns and feeder loads at hopper/feeder interface

    By J Guo, K Williams, J Y. Guo, A W. Roberts, M Jones, B Chen

    Numerical simulations using the discrete element method (DEM) were carried out to investigate the flow patterns and stress field redistribution at the hopper and feeder interface. The influences of di

    Jul 24, 2017

  • SME
    Caldecott Improvement Project

    By William W. Edgerton

    The California Department of Transportation (Caltrans), the Contra Costa Transportation Authority (CCTA), and the Alameda County Congestion Management Agency (Alameda CMA) are involved in a unique par

    Jan 1, 2008

  • SME
    Liebherr Looks To The Future; New Technology Could Lower Body Weight

    By William Gleason

    For the first time in many years, the Liebherr Group chose to host its annual conference for the international construction trade press in the United States. The reason for the move is simple ? mining

    Jan 1, 2011

  • SME
    Alternative Contracting Methods?An Update

    By John Reilly

    The author?s paper at RETC 2007, ?Alternative Contracting Methods? addressed strengths and weaknesses of DBB+DB and introduced Construction Manager/General Contractor (Portland model) and Alliancing (

    Jan 1, 2008

  • ABM
    Tratamento Químico Superficial De Fibra De Sisal: Melhorias No Desempenho Mecânico De Compósitos Semi-ecológicos Sisal/poliéster

    By Jayna Kátia Dionisio dos Santos

    Os materiais compósitos tornaram-se ao longo dos últimos anos, essenciais ao surgimento de novas tecnologias. Para tanto, é imprescindível que alguns cuidados sejam considerados ao desenvolver estes m

    Aug 8, 2018

  • ABM
    Estudo Da Viabilidade De Produção De Tijolo Ecológico Modular De Solo-cimento Com Incorporação De Resíduo Da Fabricação De Papel

    By Wellington Fernandes Junior

    O uso de blocos de solo-cimento é considerado um método construtivo mais barato do que o convencional, visto que uma das matérias-primas, o solo, é abundante. Soma-se a isto, o fato de não haver uma d

    Oct 30, 2017

  • ABM
    Avaliação Das Propriedades Mecânicas De Compósitos Produzidos Com Resíduos Da Industria Moveleira

    By Susana Marraccini Giampietri Lebrão, Guilherme Wolf Lebrão, Viviane Tavares de Moraes, Amanda de Andrade Prioli

    indústria de móveis gera cerca de 19.255.000 m³/ano de resíduos de madeira com potencial para reciclagem de materiais. Este projeto tem com o objetivo minimizar a destinação final de resíduos de Mediu

    Oct 12, 2019

  • ABM
    Utilização De Finos De Carvão Vegetal Para Produção De Biocoque Metalúrgico

    By Guilherme Liziero Ruggio da Silva

    Uma marcha estável do Alto Forno está bastante ligada à consistência das propriedades químicas, físicas e metalúrgicas das suas matérias-primas, especialmente, do coque. O desafio da produção de coque

    Aug 17, 2017

  • AUSIMM
    The Mount Victor Gold Mine, Eastern Highlands Province, Papua New Guinea

    By Sie A

    After completing a feasibility study in 1987, Niugini Mining Limited (NML) obtained five Gold Mining Leases within PA 632, covering the Mount Victor and Clarkes Ridge gold deposits. Reserves prior

    Jan 1, 1991

  • CIM
    Global Requisitioning Suite (GRS) Completing the Requisitioning Cycle

    By Kevin Bell

    About Beltek Inc. For more than a decade Beltek, Inc. has been working with national and international organizations to harness and deliver solutions which gain real ebusiness advantages in today&apos

    May 1, 2004