  • SME-ICGCM
    Relationship between the Width of Strip Pillar Yield Zone and Recovery Ratio

    By Wenbing Guo

    The stability of strip pillar is the key to successful strip pillar mining. In analyzing the stability of the strip pillar, the width of yield zone must be determined. The determination of the width

    Jan 1, 2006

  • SME
    Managing the development of secondary drawpoints in high stress areas at Goldex Mine RaSiM10 (Rockburst): 2022 Proceedings

    By Véronique Falmagne, Chantale Doucet, Thomas Côté

    Production began in the Deep 1 zone of Goldex mine in 2017 at a depth of 1,200 m. Stope dimensions are 50 m high by 22 m wide (along strike) and the panel thickness varies between 22 to 35 m. The Deep

    Apr 26, 2022

  • CIM
    Comminution Circuit Comparison Conventional versus Semi-Autogenous

    By G. H. Babcock, D. A. Knight, V. G. Medina

    "Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group

    Jan 1, 1991

  • CIM
    Permeabilities of the Athabasca Oil Sands

    By K. A. Clark

    "The repacked mineral aggregates of good grade oil sands have permeabilities ranging between 15 darcys to 350 millidarcys. The variation is due to the silt contents of the aggregates. Few good grade o

    Jan 1, 1960

  • CIM
    Milling of Noranda Process Slags

    By P. W. Godbehere, B. W. Brooks

    "This paper deals with the milling of slags from the Noranda Continuous Process, in the Horne Concentrator at Noranda, Quebec. The milling of copper slags, although novel in Canada, has been practiced

    Jan 1, 1977

  • AIME
    Effect Of Cleaned Vs Uncleaned Foundry Scrap On Slag Volume

    By W. L. Doyle

    SLAG weights were taken on a series of twenty-eight 6-ton bottom-pour heats. These weights varied from 573 to 1050 lb. Of these, four were chosen for study of the effect of cleaned and uncleaned found

    Jan 1, 1947

  • SME
    Geologic Investigation Of The Muskeg River Mine, Ft. McMurray, Alberta

    By M. Fustic, A. H. Paul

    The geology of the Muskeg River Oil Sands Mine is described to demonstrate how geologic modeling aided in resource evaluation and material characterization during the feasibility and construction stag

    Jan 1, 2002

  • AIME
    Institute of Metals Division - Stress-Induced Martensite Transformation in Beta Titanium Alloys (TN)

    By R. A. Wood, R. I. Jaffee, H. R. Ogden, D. N. Williams

    CERTAIN titanium alloys when quenched to retain the 0 phase at room temperature show extensive transformation of 0 to martensitic a during deformation. Alloys of this type are usually characterized by

    Jan 1, 1964

  • AUSIMM
    Low Energy Zero Gas Emission Metals Directly from Ore using Geosequestration - A Minerals Processing Vision for the Future

    Whilst the fossil fuel-based power industry moves towards carbon capture and storage (CCS) or so-called 'geosequestration', the minerals industry should adapt to reap the benefits of the new

    Sep 13, 2010

  • ISEE
    A Practical, Yet Technically Sound, Design Procedure for Pre-Split Blasts

    By William Hustrulid

    Pre-split blasting is a primary technique for creating slopes with a minimum amount of unwanted damage to the remaining rock mass. Rock slopes created in such a way have both safety-related and econom

    Jan 1, 2007

  • DFI
    Davison Freeway Reconstruction Utilizes Design/Build Retaining Walls

    By Thomas C. Anderson

    Thirty-four retaining walls are part of the $46 million upgrade of a 1942 depressed highway in Highland Park, Michigan near Detroit. This project will close a missing link between two newer roadways,

    Jan 1, 1999

  • SAIMM
    Owner Versus Contract Miner — A South African Update

    By S. M. Rupprecht

    "SynopsisOver the last decade in South Africa, there has been a significant increase in the number of mining operations, both open pit and underground, which use independent contractors to carry out m

    Jan 1, 2015

  • SAIMM
    What Is The Best Energy-Delivery System For Hand-Held Stope Drilling And Associated Equipment In Narrow-Reef Hard Rock Mines? ? Synopsis

    By P. J. Petit

    Changing mining conditions, legislative issues, rising costs, and the constrained supply of skills and electricity in South Africa, have been some of the criteria forcing mine operators and engineers

    Jan 1, 2013

  • SAIMM
    Melting Of Platinum Group Metal Concentrates In South Africa

    By J. Nell

    An overview is given of the matte melting process used for the beneficiation of South African platinum group metal (PGM) ores. Most producers use six-electrode furnaces to melt the concentrate and Pie

    Jan 1, 2004

  • SME
    T& UC Tunnel Demand

    TABLE TUNNEL NAME OWNER LOCATION STATE TUNNEL USE LENGTH (FEET) WIDTH (FEET) BID YEAR STATUS Gateway Tunnel project Amtrak Newark NJ Subway 14,600 24.5 2015 Under study

    Sep 1, 2013

  • NIOSH
    Root Causes Of Groundfall Related Incidents In U. S. Mining Industry

    By R. Karl Zipf, Kousick Biswas

    The main objective of occupational health and safety research is to minimize or eliminate the events that may cause fatal or non-fatal injuries to human workers. A commonly used technique is to devis

  • CIM
    Evaluation of the Kelsey Centrifugal Jig at Rio Kemptville Tin

    By H. Wyslouzil

    "The Kelsey Centrifugal Jig is a gravity separation device which utilizes the principles of the conventional mineral jigs but with the additional feature of being able to vary the apparent gravitation

    Jan 1, 1990

  • SME-ICGCM
    Safety: A Review and Evaluation of Current Retreat Mining Practices in Kentucky

    By John E. Feddock

    Retreat mining plays an important role in the coal production within Kentucky and the Appalachian Coal Basin. In Kentucky, the majority of retreat mining is performed in the Eastern coal field. Howe

    Jan 1, 2006

  • SME
    Land Use Considerations In The Premining Plan

    By C. Gregory Knight

    Adequate planning for the development, operation, and reclamation of a surface mine requires attention to present and future uses of land, both on the mine site and in the mine vicinity. This paper ou

    Jan 1, 1977

  • AUSIMM
    A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate Perspective

    By A E. A Northcote

    The drive to maximise performance, reduce maintenance times, improve safety of operation and maintenance on mining equipment while keeping both operational and capital costs down has provided good nou

    Mar 21, 2011