Search Documents

  • AUSIMM
    Presentation of the Institute Medal, 1976 to Laurence Charles Brodie-Hall, C.M.G.

    ADDRESS BY THE PRESIDENT OF THE INSTITUTE (MR. J. G. SYMONS) IN PRESENTING THE MEDAL TO LAURENCE CHARLES BRODlE-HALL, C.M.G.The Institute Medal is awarded to a select band of people who have rendered

    Jan 1, 1977

  • SME
    Methane Emissions And Airflow Patterns On A Longwall Face

    By S. J. Schatzel

    Coal mine longwall face ventilation is an important component of the overall mine ventilation system. Increases in the production rate due to higher capacity mining equipment tend to increase methane

    Jan 1, 2012

  • SME
    Management Of Risk Associated To The Design Of Block Caving Mine: A Case Study On Chuquicamata Underground Mining Project

    By R. R. Guzman

    In this study, the "Mine Project Risk Management" methodology, MPRM (Botin et al. 2011), has been applied to characterize the sources of uncertainty and to quantify risk in the mining engineering sta

    Feb 23, 2014

  • AIME
    The Welding of Oil-Well Casing

    By Louis R. Hodell

    WHEN the drilling of an oil well is completed a permanent opening from the reservoir to the surface must be provided. This is done by lining the hole with pipe, commonly known as casing. In the past,

    Jan 1, 1937

  • CIM
    NYE Concentrator Expansion

    By D. Turk, P. Lefebvre, J. Sargent, K. Major

    "Stillwater Mining Company recovers platinum and palladium from their Nye Montana operations. Mining first commenced at Nye in 1987 at a milling rate of 455 t/d (500 stpd). The plant was expanded in 1

    Jan 1, 2000

  • DFI
    Tanana River Bulkhead Expansion, Flexibility In Construction; Key To Arctic Dock Construction

    By Roy Peratrovich

    An innovative cost-saving design for a 1,100 ft bulkhead on the Tanana River at Nenana in central Alaska won Alaska Construction & Oil magazine's Construction Achievement Award. The designers uti

    Jan 1, 1985

  • CIM
    Characterising Ore Micro-Texture Using X-Ray Micro-Tomography

    By X. Yuan

    "The processing behaviours of ores such as their liberation characteristics in comminution and their response in separation processes are affected by their mineralogical characteristics. Key ore chara

    Jan 1, 2012

  • SME
    Heavy Equipment - Caterpillar Joins Shovel Market - Equipment Manufacturers Position Themselves To Meet Demand From Rising Commodity Prices

    In early June, Rio Tinto?s chief executive officer Tom Albanese said that he expected demand for iron ore, aluminum and copper to double in the next 15 years. Driven by global industrialization and u

    Jan 1, 2010

  • ISEE
    Quarry Blasting is Boring

    By Darcey Baker

    Quarry Blasting is usually boring, and that is how we like it. By this, boring means routine, straightforward, meat and potatoes blasting. Quarries typically will not utilize cast blasting, coyote tun

    Jan 1, 2009

  • NIOSH
    RI 3466 Oxidation Of Carbon Monoxide And Hydrogen By Bacteria ? Introduction

    By G. W. Jones

    During the course of an investigation by the Bureau of Mines into the causes, behavior, end control of anthracite-line fires, it was observed that the carbon monoxide disappeared from a scaled fire ar

    Jan 1, 1939

  • CIM
    Water Control Technology Innovative Solutions for Underground Mines

    By Peter White

    Mine Planning Shaft Collar Shaft Sinking Raises Ramp Underground Water Storage

    May 1, 2009

  • AUSIMM
    Economic Evaluation of Otago Lignites

    Between February and August of 1986, Dr Alfred Petrick visited New Zealand sponsored under a Fulbright grant administered by the New Zealand-United States Educational Foundation. The grant supported a

    Jan 1, 1986

  • AUSIMM
    The development and future of BHP Billiton’s Western Australian iron ore geological reconciliation system

    By S J. Loach

    Geological reconciliation is an indispensable part of BHP Billiton’s Western Australian Iron Ore (WAIO) operations. Since 2009 our reconciliations have been calculated in a single, centralised sequel-

    Jul 24, 2017

  • AUSIMM
    Cost Model of the Leigh Creek Coalfield

    The Leigh Creek Coalfield is owned and operated by the Electricity Trust of South Australia to supply fuel to the Northern Power Station. To supply electricity at lowest cost, a costing and decision

    Jan 1, 1990

  • SME
    Correct Identification Of Chrysotile Asbestos In Ores

    By Allison

    During the 1980’s, laboratories opened throughout the United States to serve the analysis needs of a rapidly growing asbestos abatement industry. The samples analyzed were either collected during the

    Jan 1, 2005

  • AUSIMM
    Yucca Mountain, Tunnelling with Nuclear Quality Assurance

    At Yucca Mountain, USA, a tunnel is being built according to nuclear quality standards. It has proved possible to meet very high quality demands while at the same time achieving high advance rates. To

    Jan 1, 1999

  • AUSIMM
    Water Treatment at Waikato North Head Mine Site

    By B Orchard

    New Zealand SteelÆs Waikato North Head mine, situated at the mouth of the Waikato River, supplies approximately 1.2 million tonnes per annum of titanomagnetite concentrate to the Glenbrook steel mill.

    Jan 1, 2002

  • ABM
    Aumento De Produtividade Dos Ensaios De Moagem Em Escala De Laboratório, Utilizando Equações Matemáticas Simples

    By Tatiane Aparecida Rocha Gonçalves

    Dentro da caracterização tecnológica do minério de ferro, percebe-se o aumento da realização de ensaios de moagem em escala de laboratório, em função do empobrecimento das principais jazidas de minéri

    Aug 2, 2018

  • IIMP
    Ingeniería y cambio social (II)

    By Mario Samamé Boggio

    El presente texto describe el origen del saber técnico en los países hegemónicos, la función de las universidades y la situación de la enseñanza respecto de la carrera profesional de Ingeniería.

    Jan 1, 1979

  • SME
    Shaft Sinking at the Seymour?Capilano Filtration Plant

    By Andreas Prucker

    The Greater Vancouver Water District (GVWD) is currently constructing the largest water treatment plant in Canada. As part of this treatment scheme twin water transfer tunnels are being constructed. W

    Jan 1, 2008