Search Documents

  • AUSIMM
    Estimating the Cost of a Feasibility Study for a Mining Project

    The cost of preparing a feasibility study is notoriously difficult to estimate. Studies for mining projects are typically commenced when an exploration programme has identified a mineable resource a

    Jan 1, 1990

  • CIM
    Determining the Oil Sands Mining Limit With Lerchs-Grossmann O5ptimization

    By L. Chunpongtong

    ABSTRACT The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents

    Jan 1, 2014

  • CIM
    Determining the oil sands mining limit with Lerchs-Grossmann optimization

    By L. Chunpongtong

    The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents a mathema

    Jan 1, 2014

  • SME
    Dry Coal Cleaning With A Magmill™

    By R. R. Oder, R. E. Jamison, E. D. Brandner

    This paper presents preliminary test results obtained with a 0.38 kg/s (3000 lb-hr) beta prototype MagMill™. In processing Upper Freeport coal the beta prototype recovered 82% of the weight of the fee

    Jan 1, 2000

  • CIM
    Toward the Inventory of Ontario?s Mineral Aggregates

    By W. R. Cowan

    The availability of mineral aggregates for construction purposes is rapidly declining through inadequate resource planning. restrictive zoning and legislation , and competing land uses. The Geological

    Jan 1, 1978

  • SAIMM
    In-Pit Crusher Location as a Dynamic Location Problem

    By M. Paricheh, M. Rahmanpour

    "The cost efficiency and high reliability of semi-mobile or combined in-pit crushing-conveying (IPCC) and truck systems, compared to conventional truck-shovel systems alone, make them more attractive

    Jan 1, 2017

  • ABM
    Retorno Operacional Do Alto-forno 3 Da Usiminas Ipatinga Após A 2ª Troca De Staves

    By Larissa Rodrigues de Carvalho Rocha, Mauro Vivaldino Fernandes, José Eduardo da Silva Moreli, Beatriz Fausta Gandra, Adriano Cesar Carvalhido

    No atual cenário siderúrgico, o prolongamento da campanha de um alto-forno tem sido prática usual em diversas empresas. Nesse contexto, a Usiminas tem realizado diversas ações de preservação dos altos

    Oct 1, 2019

  • CIM
    Energy and Cost Comparisons of HPGR Based Circuits with the SABC Circuit Installed at the Huckleberry Mine

    By O. Mejia, J. Drozdiak

    "This paper summarizes a comprehensive energy and cost study comparing an existing SAG mill based circuit at Huckleberry Mine with two proposed circuits involving comminution technologies which are as

    Jan 1, 2013

  • SME
    Large Excavator Cuts Operating Costs at Alabama Coal Mine

    By Bill Elverman

    Randy and Kenny Robison have visited every coal mine that would let them in the door, to survey the best mining practices. The brothers have spent nearly their entire lives working in coal operations

    Jan 1, 2005

  • SME
    Development and Status of the Treatment Technology for Acid Mine Drainage "Mining, Metallurgy & Exploration (2021)"

    By Shuangchun Yang, Le Tong, Ronggui Fan, Cunlei Li

    Acid mine drainage (AMD) is difficult to treat due to its physicochemical characteristics, such as high pH and high heavy metal concentrations, so it causes great harm to the environment and human hea

    Sep 4, 2020

  • NIOSH
    IC 8388 Helium-4 Experimental PVT References: 1895 To 1968

    By Robert E. Barieau

    A list of 163 references to original experimental PVT data on helium is presented for the period 1895 to 1968. The list is complete as of the start of the Helium Centennial Year, 1968, to the best of

    Jan 1, 1968

  • ISEE
    Cautious Blasting in Critical Areas at Ramagundam Super Thermal Power Station

    By N. Jayaraman, V. Srikant, A. Radhakrishna

    Addition of a 500 MW unit to the existing units at Ramagundum Thermal Power Station requires blasting of large volumes of rock very close to sensitive installations like Turbo generator, Generator tra

    Jan 1, 2003

  • AIME
    Early Gem Mining; Real and Otherwise

    By V 9. 0 / 300 dpi

    ATHOUGH turquoise mining was, so far as we know, the first large, well-organized mining operation,' gem mining, from the Roman con-quest of Egypt until the opening of the South African pipe diamo

    Jan 1, 1928

  • DFI
    Seal Slab Prestressed Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p

    Jan 1, 2013

  • ISEE
    Evaluating Delay Effects on Ground Vibrations with Simulated Vibration Waveforms

    By Randall M. Wheeler

    It is important to be able to quantify the effects of blast delay designs on vibration characteristics. White was the first company to develop commercially available software, called Alpha-Blast, for

    Jan 1, 1994

  • DFI
    Underpinning A Crane Foundation

    By Donald R. McMahon

    This paper presents a unique case history that documents the use of a braced secant pile wall to underpin a heavily loaded footing inside of a manufacturing plant. Construction of a pit for a new man

    Jan 1, 2006

  • AUSIMM
    Presidential Address, 1957-The Place of the Iron and Steel Industry in the Australian Economy

    Six years ago it was my responsibility to give the presidential address, and now that privilege has come my way again. On that occasion we were gathered atWhyalla and I took the opportunity of putting

    Jan 1, 1957

  • SME
    Effects Of Obstructions, Sample Size And Sample Rate On Ultrasonic Anemometer Measurements Underground

    By A. L. Martikainen

    In fluctuating airflow, continuous air velocity recording is the most reliable method of air velocity measurement. It allows for fast recognition of changes and the calculation of long-term averages.

    Jan 1, 2011

  • AUSIMM
    Commissioning and Operating an Autogeneous Mill at Karowe Diamond Mine

    By N A. Sikwa, L M. van Niekerk, G N. Ndlovu

    In June 2012, Lucara Diamond Corporation officially commissioned its Karowe Diamond Mine in Letlhakane, Botswana. The processing plant circuit incorporates variable speed autogeneous milling, a first

    Jul 15, 2013

  • AUSIMM
    Equipment Application to the Smaller Underground Mining Operations

    Mining companies in order to compete and succeed in being viable business propositions must look to the future and select mining methods which guarantee improved efficiency and productivity as well as

    Jan 1, 1990