Search Documents

  • IMPC
    The Influence of: Grate versus Overflow Discharge in Open Circuit Milling Open versus Closed Circuit Milling with an Overflow Mill

    By Benoit Clermont, Jan Lux

    "Magotteaux and Anglo Platinum started a co-operation program with the main aim of establishing the optimum milling configuration measured in terms of throughput, fineness and energy consumption.For t

    Jan 1, 2003

  • IMPC
    Cyanide Destruction and Waste Water Management

    By Malcolm Mudge

    "One of the oldest mining areas in the World exist in Africa and the Middle East. This area is being exploited by foreign and local mining entities. Several large plants, both foreign and local as wel

    Jan 1, 2003

  • IMPC
    Gold Leaching by Thiosulfate Solution and Recovery

    By Atsushi Shibayama, Toyohisa Fujita, Wan-Tai Yen, Ke-jun Liu

    "A gold has been leached with ammonium thiosulfate solution and several leaching conditions have been studied. The leached solution has been recovered by solvent extraction and the optimum conditions

    Jan 1, 2003

  • CIM
    Caractérisation des environnements miniers menant à la corrosion des systèmes de soutènement

    By Jean-François Dorion

    La corrosivité des environnements miniers souterrains est un phénomène peu étudié au Canada. En plus de détériorer les systèmes de soutènement, la corrosion s?attaque aussi à divers installations et é

    Feb 1, 2008

  • ISEE
    Presplitting and Controlled Blasting Techniques, Including Air Decks and Dimension Stone Criteria

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1991

  • SME
    Three-Dimensional Analysis Of Mine Dump Point Instability Under Moving Loads

    By R. L. Michalowski

    The operation of mobile mining equipment near the crest of stockpiles and wastedumps is a potentially hazardous practice which often results in localized slope failures. A limit plasticity approach to

    Jan 1, 1991

  • IIMP
    Comparación del circuito de molienda entra clasificadores y ciclones en la concentradora de Casapalca

    By V. Mejía C.

    A raíz de un informe de un estudio petrográfico de las relaciones de Casapalca presentado por el Sr Kobe, surge la idea de mejorar la molienda, reemplazando los clasificadores por ciclones. En esta pe

    Jul 20, 1961

  • DFI
    Amsterdam North South Line Metro - Construction Of Deep Diaphragm Walls For Three Underground Stations.

    By Theo. A. M. Salet

    The historic centre of one of the most beautiful cities in Northern Europe -Amsterdam - is being excavated to accommodate the new North/South metro line. This new line is due for completion in 2012, a

    Jan 1, 2006

  • ISEE
    Drill Monitoring and GPS Developments and their Impact on the Drill to Mill Process

    By John Vynne

    Too often, a mine’s operations, including drilling, blasting, loading, hauling, crushing, processing, etc., are considered independent steps, rather then a continuous process. In fact, these are inter

    Jan 1, 2001

  • SAIMM
    Towards A Mineral Property Valuation Code: Considerations For South Africa

    By F. T. Cawood

    One of the consequences of globalizing mine finance is a necessity to apply uniform accountancy and valuation standards that are clearly understood and consistently applied by the global investment co

    Jan 1, 2004

  • AUSIMM
    Mexican Ag-Au and Ag-Pb-Zn Epithermal Deposits: Hydrothermal Products of a Magmatic (?) Heritage

    By T Albinson

    Mexican epithermal deposits can be broadly grouped into two types based on their contained metals, distribution, associated igneous rocks and fluid inclusion compositions. Silver-gold deposits (eg Tay

    Jan 1, 1995

  • AUSIMM
    Instability analysis in three-way and four-way coal mine intersections

    By B Abbasi

    It is well known that most roof falls in coal mines typically occur at and around intersections. Room-and-pillar and longwall coal mining systems typically develop 3-way and 4-way intersections. This

    Nov 30, 2018

  • SME
    Better Fragmentation Through Team Work At Dos Pobres Mine Safford, AZ

    By D. Brandt

    The Dos Pobres Mine is a copper oxide heap-leach mine located near Safford, Arizona. Mine production is 180,000 tons (163,293 tonnes) per day with a stripping ratio of 2:1. During the startup pha

    Jan 1, 2011

  • AUSIMM
    Gold and Base Metal Mineralisation in the Central Pine Creek Geosyncline

    By Butler I. K, Nicholson P. M

    There are four main types of base metal and gold mineralisation recognised in the central Pine Creek Geosyncline. These are stratiform, polymetallic veins, stockwork/concordant gold-quartz veins and

    Jan 1, 1994

  • IIMP
    Simulación de un sistema de perforación hidráulica: Jumbos

    By Ángel Bravo

    La simulación es un programa virtual que permite evaluar los costos de perforación y soldadura para el costo final del proyecto minero. El modelo fue diseñado en hoja electrónica, cuyos datos de entr

    Sep 13, 2001

  • SAIMM
    Seismic Monitoring Of A Simulated Rockburst On A Wall Of An Underground Tunnel

    By A. M. Milev

    A simulated rockburst was conducted underground at Kopanang Mine, previously called Vaal Reefs No. 9 Shaft. The rockburst was simulated by means of a large blast detonated in solid rock close to a cro

    Jan 1, 2001

  • SAIMM
    Reoxidation And Castability Of Aluminium-Killed Steels

    By R. Rampersadh

    Paper written on project work carried out in partial fulfilment of B Eng (Metallurgical Engineering) degree Steel was sampled after calcium treatment, to follow changes in inclusion composition dur

    Jan 1, 2006

  • CIM
    Matching Motor to Mill Torque with Variable Speed Drives

    By Craig M. Sams

    "Variable speed mill popularity has grown during the last 10 years with almost every SAG mill fitted with a variable speed drive. In addition, many of today’s larger ball mills are running a variable

    Jan 1, 2007

  • CIM
    Process Improvement Update at Brunswick Mine

    By Jodi Roberts, Curtis Deredin, Jean-Guy Paulin

    "Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk

    Jan 1, 2008

  • ISEE
    Relationship between peak particle acceleration, velocity and displacement of blast vibration

    By Ruilin Yang

    The following simple equations are frequently used within the blast vibration community;PPA f PPV v = 2p · , PPV f PPD d = 2p · ,a f PPV PPA 2p = , and v f PPD PPV 2p = where, PPA is the peak particle

    Jan 1, 2012