Search Documents

  • NIOSH
    RI 3534 Study Of Brine-Disposal Systems In Illinois Oil Fields - Introduction

    By Sam S. Taylor

    [The discovery of many oil fields in Illinois since 1936 and their rapid development have brought tine problem of brine disposal to the foreground in that State. The ultimate magnitude of the is not y

    Jan 1, 1940

  • AUSIMM
    An assessment of the rate of construction of an upstream raised tailings dam

    By J J. Moreno, J Willis, P Garvey

    Many of the tailings storage facilities (TSFs) in Australia are upstream raised facilities for which the consolidation of the hydraulically deposited tailings is essential to the stability of the TSF.

    Jul 1, 2021

  • DFI
    Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction Fatigue

    By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam

    Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions

    Jan 1, 2019

  • NIOSH
    OFR-17(4)-77 Conceptual Design Of An Automated Longwall Mining System - Volume II ? Appendices - Appendix A - Selection Of The Concept Coal Seams

    Two coal seams were selected and the conceptual designs were based on the geological and physical conditions typical of these seams. As a result of the screening process presented below, the two coal

    Jan 1, 1976

  • NIOSH
    Methods Of Analyzing Coal And Coke - Introduction

    By A. C. Fieldner

    THE Bureau of Mines has received many requests for Information concerning the methods its laboratories use for analyzing coal and coke and determining their heating value. The fuel investigations now

    Jan 1, 1951

  • NIOSH
  • AUSIMM
    Petrographic and Mineralogical Factors Affecting Gold Recovery at Macraes Flat, Eastern Otago, New Zealand

    By D Craw, P V. Angus

    Gold mineralisation at Macraes occurs as late quartz-carbonate veins within a body of sheared and hydrothermally altered Otago Schist, the Intrashear Schist. The alteration is characterised by the pre

    Jan 1, 1999

  • CIM
    Kansanshi Copper Smelter: The First Four Years of Operation

    By S. Hunt, D. de Vries

    Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe

    Jan 1, 2019

  • AUSIMM
    Education for Mining and Mineral Process Engineering in Australia

    This paper reviews the manpower requirements of the Australian mining industry. It has been necessary to provide general background information in order to support the view that university education i

    Jan 1, 1969

  • NIOSH
    Analyses Of Kentucky Coals - Kentucky Coal Fields

    By Arthur C. McFarlan

    There are two distinct coal fields in Kentucky-the Eastern field constituting a part of the Appalachian coal region and the Western field constituting the southern part of the Eastern Interior region.

    Jan 1, 1944

  • ABM
    Influence Of Strain Rate On The Functional Behavior Of A Niti Alloy Under Pseudoelastic Training

    By Mariana Carla Mendes Rodrigues

    The present study deals with the effects of strain rate on the functional behavior of NiTi thin wires. The samples, in the austenitic condition at room temperature, were mechanically cycled 20 times b

    Aug 17, 2017

  • SME
    Operating Ideas That Have Saved Me Some Bucks-Gold Milling at Rayrock

    By Debbie Laney

    DOUG HALBE: Second in our quick run-through on "Operating Ideas That Have Saved Me Some Bucks," was Debbie Laney of Rayrock Mines. Debbie apologizes. She can't be here. But she said, "Doug, don&a

    Jan 1, 1998

  • SME
    Design And Subsurface Construction At Yucca Mountain, Nevada

    By John F. Beesley

    INTRODUCTION This paper discusses the design of the subsurface nuclear waste repository at Yucca Mountain, Nevada; and possible concepts for construction of the subsurface facility. Subsurface constr

  • CIM
    Development and field testing of a tension measuring gauge for cable bolts used as ground support

    By P. Choquet, F. Miller

    "The development and testing of a simple low-cost gauge for measurement of tension in a cable bolt grouted in a borehole are presented. Its principle is based on a resistance wire which is wound on a

    Jan 1, 1988

  • SME
    Dynamic Simulation Of Grinding Circuits As An Aid For The Diagnosis Of Hydrocyclone Malfunction - Preprint 09-100

    By C. Bazin

    Grinding circuits are operated in the presence of disturbances due to ore changes and equipment malfunctions. One of the challenges faced by the operators is the detection of a disturbance, the identi

    Jan 1, 2009

  • ABM
    Aplicação De Processos Oxidativos Avançados Para Controle De Algas Em Lagos Ornamentais

    By Antônio Donizetti Giuliano, Fernando Codelo Nascimento, Viviane Tavares de Moraes, Cilene Cláudia Diógenes, Erivan Cardoso Rocha

    Nos lagos ornamentais geralmente tem-se a dificuldade em controlar o crescimento de algas, pois existe a incidência de luz e a disponibilidade de nutrientes provenientes da ração fornecida aos peixes,

    Oct 2, 2019

  • NIOSH
    Coal-Mine Accidents In The United States, 1934 - Introduction

    By W. W. Adams

    The safety record established by the coal-mining industry of the United States during 1934, although not as favorable as that for the previous year, was better than the record for any other year durin

    Jan 1, 1936

  • SME
    Skewed Portal Approach for Steep Slopes

    By Leonardo Rosas Sánchez, Darío Ángel Bulla

    "The two track road sector between Cisneros-Loboguerrero (having a length of 14 km and 11 short unidirectional tunnels) is a new highway still on construction located along the existing Highway Buga –

    Jan 1, 2016

  • NIOSH
    RI 9429 - Bending Fatigue Test 2 and 3 on 2-Inch 6X25 Fiber Core Wire Rope

    By A. J. Miscoe, W. M. McKewan, J. R. Bartels

    The U.S. Bureau of Mines has established a wire rope research laboratory to examine the factors that affect the life of wire rope. Two 2 in-diameter 6x25 fiber core (FC) ropes were degraded on a bendi

    Jan 1, 1992

  • NIOSH
    OFR-122(3)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume III - Appendix A - Equipment List, Specifications And Quotations - Areas 8 - 25 ? Intro

    This appendix contains the list of equipment, their corresponding number and their specifications with the quotations from the vendors/ manufacturers who can supply this equipment. The listings are ar

    Jan 1, 1979