Search Documents

  • ISEE
    Journal: Safety Talk / Flyrock Resulting From Surface Mine Blasting

    By Robert Morgan

    With improved methods for designing and detonating shots the potential for flyrock can be significantly decreased, but there are few absolutes in blasting; therefore blasters must learn from the mista

    Jan 1, 2001

  • AUSIMM
    Managing Environmental Impact Assessments of Heavy Mineral Projects in Africa ù Potential Pitfalls and Proactive Planning

    Determining the environmental consequences of green field projects is becoming an increasingly important component of new projects. Feasibility studies are regarded by potential investors as incomplet

    Jan 1, 2001

  • CIM
    Blast movement measurement to control dilution in surface mines

    By G. W. Harris, P. Mousset-Jones, J. Daemen

    "To minimize ore dilution induced by blast movement in surface mines, it is necessary to quantify such movement. This will enable more accurate location of the grade boundaries beneath the surface of

    Jan 1, 2001

  • SME
    An Approach to the Classification of Weak Rock for Tunnel Projects

    By Steve Klein

    Weak rock is an important consideration in tunnel design and construction due to the difficult ground conditions that are often encountered. Nevertheless, when conditions are favorable high advance ra

    Jan 1, 2001

  • SME
    Contact Angles Of Powders From Heat Of Immersion

    By I. Yildirim

    Water contact angles of talc powders were determined from the values of the heats of immersion measured using a flow microcalorimeter. The results were used to calculate the contact angles using a ri

    Jan 1, 2001

  • SME-ICGCM
    Analyses of Valley Fill Slope Stability - Three Case Studies

    By Shiva P. B. Kolli

    Surface mining of multiple scams by mountaintop mining methodology is complex in the Appalachian region of West Virginia. Excess spoil from the removal of overburden and interburden is disposed in the

    Jan 1, 2001

  • SME
    Integrated Seismic Imaging System for Geological Prediction Ahead in Underground Construction

    By P. Otto, G. Borm, Th. Dickmann, F. Amberg, R. Giese

    Based on many years experience, the well approved Tunnel Seismic Prediction System (TSP) has been substantially enhanced for online geological prognosis in underground construction. The method provide

    Jan 1, 2001

  • CIM
    The Benefits of Collaborative, Leveraged Industry-University Research Case Study of a McGill-CAMIRO Project

    By J. E. Nesset, L. S. Urbanoski, J. R. Goode

    "The benefits and advantages of pre-competitive, collaborative industry/university research are not always well appreciated. This paper presents the case study of a current collaborative project betwe

    Jan 1, 2001

  • SME
    Pilot Plant Demonstration Of The Platsol® Process For The Treatment Of The Northmet Copper-Nickel - PGM Deposit (2b88692d-3bac-4547-86c3-f3ee9071956d)

    PolyMet Mining is developing the NorthMet property near Duluth, Minnesota. Laboratory investigations had led to the development of the PLATSOL process to dissolve in one step the base metals (copper

    Jan 1, 2001

  • RMCMI
  • SME
    Imaging Of Minerals, Ores And Related Products To Determine Mineral Characteristics (62b10345-9d28-4191-957f-3c363fe80798)

    By W. Petruk

    Imaging is a fundamental requirement when characterizing minerals, ores and related products. Images are used for presentation, texture analysis, characterization, image analysis, identification, etc

    Jan 1, 2001

  • ISEE
    Adjusting Blasting to Increase SAG Mill Throughput at the Red Dog Mine

    By N. Paley

    An engineering project was undertaken at the Cominco Alaska Red Dog Mine to determine the extent that Semi-Autogenous Grinding (SAG) mill throughput could be increased by blasting differently. The Jul

    Jan 1, 2001

  • DFI
  • TMS
    A Mathematical Model for the Control of Metallurgical Properties of the Product Sinter

    By E. F. Vegman, Ndabezinhle Dube

    "In the practice of conventional sintering, production is always afflicted with the problem of being unable to get a uniform quality of produced sinter in the bed. Invariably the top layer of the sint

    Jan 1, 2001

  • SME-ICGCM
    Sizing Of Final Stumps For Safer Pillar Extraction

    By Christopher Mark

    Pillar recovery continues to be one of the more hazardous activities in underground coal mining. Safety requires that the roof above the intersection remain stable until after the pillar has been extr

    Jan 1, 2001

  • SME
    Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline Studies

    By C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani

    The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th

    Jan 1, 2001

  • TMS
    Thermo-Mechanical Coupling Finite Element Analysis of Sheet Metal Extrusion Process

    By C. Y. Tang, Z. H. Chen, T. C. Lee

    "In sheet metal forming process, the forming limit and strain distribution are governed by plastic instability and fracture following strain localization. It has been proved that the temperature gradi

    Jan 1, 2001

  • AUSIMM
    Improving Blasting by a Team Approach at the Henty Gold Mine

    By R Wedmaier

    Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û

    Jan 1, 2001

  • DFI
    Presentation #2 - Non-Destructive Testing For Drilled Shafts - Contents

    By Frank Rausche

    Introduction and Background Testing -Pile Preparation -Data Processing -Data Interpretation/Case Studies Case Studies - Existing Piles Stories from around the world

    Jan 1, 2001

  • AUSIMM
    Wall Control Blasting Practices at BHP Billiton Iron Ore Mt Whaleback

    By C T. Dunbar, P A. Walker, G E. LeJuge

    A programme of blast improvement was initiated at the Mt Whaleback iron ore mine by BHPIO management in early-1998. One component of that work was the need to improve wall control blasting practices t

    Jan 1, 2001